DAQ - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

DAQ

Description:

Beam 'source off': 3000 events/spill. Beam 'source=10': 2000 events/spill ... given number of events (Event number, TDC number, time, channel, DCS blocks, etc. ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 9
Provided by: paoloc1
Category:
Tags: daq | channel

less

Transcript and Presenter's Notes

Title: DAQ


1
DAQ on-line monitoring at X5 (G. Aielli, P.
Camarri)
  • DAQ realization and performance for RPC tests at
    X5-GIF.
  • Adds and changes with respect to the July 2002
    version.

2
DAQ items
  • PC Pentium II 400 MHz, RAM 128 MB.
  • National Instruments interface PCI-VME-MXI-2.
  • DAQ program developed with LabVIEW 6.0.2
  • On-line monitor developed with LabVIEW as well.

3
DAQ front panel (old)
4
Acquisition procedure
  1. Hexadecimal word readout from TDCs.
  2. Data flag check.
  3. If data flagTRUE, then the present TDC module
    readout continues till the empty buffer flag is
    found if the module contains no data, the hex
    word DEADCAFE is written to file. After that, the
    following TDC module is read out in the same way.
  4. At the beginning of each event the event number
    is written to the data stream, starting from 1.
  5. Once every fixed number of events (1000, for
    instance) the DCS data stream is read via LAN and
    written into the event data stream, between two
    hex control words.
  6. The data are written to a binary file in the time
    interval between two spills (beam) or two
    triggers (cosmics).

5
DAQ performance during the July 2002 test
  • Beam source off gt 3000 events/spill
  • Beam source10 gt 2000 events/spill
  • Beam source5 gt 1000 events/spill

6
On-line monitoring
  • Binary file decoding, and production of an ASCII
    file containing a dump of a given number of
    events (Event number, TDC number, time, channel,
    DCS blocks, etc.).
  • Display of time distribution histograms, hit
    profiles and strip multiplicity for each
    readout layer.

7
Comments
  • The system has shown pretty satisfactory speed,
    reliability and robustness.
  • Taken 107 events within 4 days data taking in
    July 2002.
  • The system is scalable very simply to include a
    higher number of modules.

8
Developments
  • Computation of single rates (done), DAQ-monitor
    synchronization (work in progress) and display of
    sample tracks (to be done).
Write a Comment
User Comments (0)
About PowerShow.com