Title: d Au Progress
1dAu Progress
- Forward physics (FMS) reduced goal 30 nb-1,
achieved 3 nb-1 - As of Jan. 7, retuned program to maximize FMS
sampled luminosity (and increase MinBias
recording rate) - On track to completion end of January
- Estimate 1.6 nb-1/day, needs 20 days
2Luminosity in pp 2008Whats possible with only
6 weeks?
- Expectation 12-24 pb-1 delivered at 200 GeV
- 6-12 pb-1 sampled by FMS
- 3-6 pb-1 sampled by slow detectors
3Physics from pp 200 GeV
- Comparison data for FMS CGC search
- Binary scaling 30 nb-1 dAu 12 pb-1 pp
- Situation somewhat better, since RdAu lt 1
- 6-12 pb-1 in pp will give reference statistics
equivalent to dAu for FMS - Extend xF and pT range for forward single-spin
asymmetries - Study direct photon asymmetries in forward
direction - Electrons from Charm and Bottom, with low
material, to resolve STAR/PHENIX discrepancy
4Forward single-spin asymmetries
- Acceptance of FMS and projected RHIC performance
will enable - Further reach for inclusive p0 and heavy mesons
- Spin-dependent near-side correlations (p0-p0) ?
separation of Sivers and Collins effects - Spin-dependent away-side correlations (p0-jet) ?
isolation of Sivers effect - Embark on spin-dependent inclusive g and gjet
Projections for 9 pb-1 recorded
5Transverse spin direct g
Theory expects repulsive color charge
interactions to result in an opposite sign to
spin-correlated momentum imbalance for gjet.
Magnitude of effect requires gt105 events to see
significant effect.
Bacchetta et al., PRL 99, 212002
Comparison of run-6 data to simulation provides
indication that prompt g can be extracted. The
large acceptance and dynamic range of the FMS is
needed to veto daughter g from p0,h,
decays. Expect gt150K g events with E?gt25 GeV into
small fiducial volume in 9 pb-1 sampled.
6Low-energy AuAu run
- Issues with results from 2007 9 GeV AuAu run
- Large backgrounds identified in trigger
- Entire event rate may be from background
- Luminosity may scale below ?2
- Time for viable physics run may be underestimated
- Another test run is needed
- Few days at 9 GeV, recording with new trigger,
sufficient for these tests - Needs to be scheduled to avoid Quark Matter
7Looking ahead to Run 9
- This unfortunate situation means we will not make
progress on our longitudinal spin goals for the
second year in a row - STAR will probably request a long longitudinal pp
run at 200 GeV (with DAQ1000!), and some 500 GeV
tests following, to start Run 9