Wind Energy in Morocco Resources, Potential - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Wind Energy in Morocco Resources, Potential

Description:

Desalination Sea Water by Wind Energy in Akhfennir village. Site : Akhfennir village is situated ... For desalination sea water by wind (3500 kms of coasts) ... – PowerPoint PPT presentation

Number of Views:144
Avg rating:3.0/5.0
Slides: 23
Provided by: kathlee187
Category:

less

Transcript and Presenter's Notes

Title: Wind Energy in Morocco Resources, Potential


1
Wind Energy in Morocco Resources, Potential
Projects
  • Presented by
  • M. Mustapha ENZILI
  • Responsible of Wind Department
  • Renewable Energy Development Center
    (CDER-Morocco)
  • EWEC2009 - March 17, 2009

European Wind Energy Conference and Exhibition
2009, Marseille, France
2
Summary
  • Overview of Electricity Sector in Morocco
  • Wind Energy Potential in Morocco
  • Wind Farms programmed (2009-2012)
  • Wind Farms installed in Morocco
  • Desalination sea water by wind energy in Morocco
  • Conclusion

3
Overview of Electricity Sector in Morocco
4
Energy Sector in Morocco in 2008
  • In Morocco, conventional energy resources are
    limited, the country depends almost totally from
    the outside for its energy supply (97 )
  • 71 Milliards DH for imports of energy products in
    2008 (6.2 Milliards Euro)
  • Annual average consumption growth of electricity
    8
  • Capacity of Power Plant to install each year
    400-500 MW
  • Total Power plant 5312 MW
  • - Thermal Power plant 3469 MW
  • - Hydraulic Power plant 1729 MW
  • - Wind Farms 134 MW

5
Generation of Electricity in Morocco
  • Electricity Consumption 22608 GWh (2007)
  • Electricity Production 19101 GWh (2007)
  • National Utility of
  • Electricity (ONE) 6047.5
    GWh (26.74 )
  • Private Producers (BOT) 13021.6 GWh
    (57.60 )
  • - JLEC (1360 MW-Coal)
  • - Tahaddart (384 MW-Gas)
  • - CED (50 MW-Wind)
  • Self-producers (Industrials) 32.5 GWh
    (0.14 )
  • Import (Spain) 3506.5
    GWh (15.51 )

6
Electricity Sector in Morocco
  • Production of Electricity in Morocco ONE
    (National Utility of Electricity) Private
    producers (BOT)
  • Distribution ONE Governmental companies
    Private Companies in big
    cities
  • Until now, no Agency for regulation of
    electricity market
  • Price of electricity fixed by Government,
  • about 1 DH/kWh (8.6 cEuro) - (1 Euro 11.5
    DH)
  • New Law about self-production of electricity from
    10 MW to 50 MW (12 June 2008)
  • New Law about Renewables Energies Energy
    Efficiency (in preparation)
  • Now, No Feed-in-tariff for Renewables
    Energies in Morocco

7
Self-Producers Wind Projects
  • Self-producers Production consumption of
    Electricity from wind energy by Industrials in
    the the same site of the factory or in others
    sites via taxe of transport
    - 6 cDH/kWh (0.5 cEuro/kWh) until 2011
    - 8 cDH/kWh (0.7 cEuro/kWh)
    from 2012
  • Average price to buy electricity from ONE (for
    industrials) 65 cDH/kWh (5.6 cEuro)
  • Possibility to sell Extra energy from Wind
    Farms to the national electrical grid (ONE) with
    a price of 70 of ONE-Tariffs.
  • Guaranty of Electricity to industrials in each
    time from ONE (National Grid)
  • Wind Farms Programmed by self-producers 850 MW
  • (2010-2011)

8
Wind Energy Potantial in Morocco
9
Wind Energy Potential in Morocco
  • Morocco has an excellent wind potential
    mainly in the North in the South
  • - Essaouira, Tangier Tetouan with an annual
    average between 9.5 11 m/s at 40
    meters.- Tarfaya, Taza Dakhla with an annual
    average between 7.5 m/s 9.5 m/s at 40
    meters.
  • Wind Potential of Morocco
  • Total Potential 7936 TWh/year (2645
    GW)
  • Technical Potential 4896 TWh/year (1632 GW)
  • Wind Atlas of Morocco published in 1986, 1995 and
    updated in 2008.
  • More than 50 measurements stations installed by
    CDER between 1990 2008

10
Wind Energy Potential in Morocco (Study
CDER/GTZ July 2007)
11
Wind Resource Map of Morocco
12
Wind Farms Programmed (2009-2012)
  • Objective of the Government Production of 20
    of
    electricity from Renewable
    Energy
    (included Hydro).
  • Wind Farms Programmed 1000 MW until 2012
  • Wind Farms installed 134 MW
    (02/2009)
  • Projects programmed - Wind Farm 140 MW
    (Tangier) in construction, Start

  • production in April 2009
  • - Wind Farm 300 MW (Tarfaya) Call of tenders
    launched in 2007 (17 Compagnies prequalified
    for the final selection)
  • Self-producers projects 850 MW
    (2010-2011)
  • Potential estimated to be installed -
    until 2012 1000 MW to 2000 MW
  • - until 2020 4000 MW to 7000 MW

13
Wind Farms installed in Morocco
14
Wind Farm of 50 MW (El Koudia El Baida -Tetouan)
  • Project ? Power 50
    MW (84 Vestas 600 kW) ? Start production
    8/2000 ? Production 200
    GWh/year (Average) ? Wind measurements CDER ?
    BOT Project CED
    (EDF-Paribas-Germa/France)

  • (selled to Theolia in december 2007)
  • Annual average wind speed at 40 meters
    10 m/s
  • Annual average wind speed in the best location
  • in the site at 40 meters 11 m/s

15
Wind Farm of 50 MW (El Koudia El Baida -Tetouan)
16
Wind Farm of 60 MWCap SIM (Essaouira)
  • ? Power
    60 MW ? Windturbines
    71 Gamesa
    G52-850 kW? Start production
    04/2007
  • ? Production estimated 210
    GWh/year ? Avearage wind speed (40 m) 9.45
    m/s? Wind measurements CDER?
    Project
    ONE
  • ? Project Cost
    800 millions DH
    (72 Millions Euro)

17
Wind Farm 60 MWCap Sim (Essaouira)
18
Wind Farm 10 MW Lafarge (Cements Factory of
Tetouan)
  • ? Power
    10 MW ? Windturbines 12
    850 kW (Gamesa)
  • ? Start production 9/2005?
    Production estimated 38 GWh/year (40 of
    annual
    consumption of the factory)
  • ? Wind energy Production for Cements
    factory
    (extra energy selled to
    the
    national electrical grid)
  • ? Project Cost 110
    millions DH(10 MEuro)
  • ? New Project (22 MW) Programmed in
    the same site
    10 MW (12/2008), 12 MW(2010)

19
Wind Farm 10 MW Lafarge
(Ciments Factory of Tetouan)
20
Desalination Sea Water by Wind Energy in
Akhfennir village
  • Site Akhfennir
    village is situated
    in the south of Morocco

  • (Near Atlantic Coast)
  • Number of inhabitants 4000 residents
    permanently
  • Consumption of water 860 m3/day(2009 - 2015)
  • Drinking water Akhfennir village
    is supplied
    in drinking water by trucks
    cisterns from the
    city of
    Tan-Tan(120 DH/m311 Euro)
  • Mean wind speed - Wind Station 1 (40 m)
    7,68 m/s
  • -
    Wind Station 2 (40 m) 6,48 m/s
  • Start production December 2009

21
Conclusion
  • Morocco has an excellent wind potential
  • National Energy Priorities Strategy -
    Production of 20 of electricity from Renewable
    Energy by 2012.
  • - Energy efficiency 15 reduction in
    consumption by 2020
  • Some projects installed or under preparation for
    generation of electricity from wind - For
    national grid to reduce importation of oil
  • - For Self-producers (Industrials)
  • - For export green electricity to Europe
  • - For desalination sea water by wind (3500
    kms of coasts)
  • Private companies can also contribute to realize
    the challenge by installation of Wind Farms in
    Morocco

22
Renewable Energy Development Center (CDER)
  • Thank you for your Attention
  • m.enzili_at_cder.org.ma
  • enzili_at_hotmail.com
  • www.cder.org.ma