Title: Overview of PACS Test Campaigns


1
Overview of PACS Test Campaigns
  • Helmut Feuchtgruber
  • MPE

2
AVM Warm Electronics Tests
  • AVM WE Tests from Sep-2002 to Jul-2004
  • Purpose
  • - OBSW development
  • - Initial warm electronics communication
    verification
  • - Development of basic instrument operational
  • procedures (switch-on/off, memory load, 1355
    link initialization
  • etc.)
  • - Development of EGSE software and operational
    procedures
  • (memory load, packet recording, bus list
    switching etc.)
  • Hardware DPU AVM1, SPU EM, BOLC sim., DMC AVM

3
CQM ILT
  • Two cryogenic test phases
  • 19-23 Jul 2004 and 6-Sep to 6-Nov 2004 (EMC
    4/6-Nov 2004)
  • Instrument Hardware
  • - DPU AVM1, SPU AVM, BOLC AVM, DMC EM, WIH AVM
  • - CQM FPU
  • Instrument OBSW
  • - DPU V7.10, several updates during the tests
    until V7.68
  • - SPU V11.1, short trial of V11.3, but roll
    back to V11.1
  • - DMC V5.006, several updates during the tests
    until V5.023

4
EQM IMT
  • July/August 2005 3 x Short Functional Tests warm
  • 19-Sep to 4-Nov in 2 periods (with and without
    He-leak)
  • 7/9-Nov-2005 PACS/SPIRE parallel mode testing
  • 21/25-Nov-2005 EMC Testing
  • 7/9-Dec-2005 Straylight Testing
  • 15-Dec-2005 SFT at HeI conditions
  • Hardware Refurbished DMC EM, otherwise same as
    during ILT
  • OBSW DMC OBSW V5.025, SPU V11.7, DPU V7.68

5
FM Pre-ILT
  • Since 22-Mar-2006 in several time periods
  • Purpose
  • - Development and testing of CUS-based ILT test
    procedures and
  • operational procedures
  • - Verification of new DPU Boot SW
  • - Dry-run and validation of IST test procedures
  • - OBSW and MIB testing
  • - SPU HLSW development
  • - Support to PCSS development and testing
  • Hardware DPU AVM2 CFM2, DMC EQM, BOLC sim.,
    SPU EM, WIH EQM, FPU simulator (part time)
  • OBSW DMC V6.000-V6.005, SPU V12.2, DPU V8.31

6
Future Test Phases (1)
  • ILT without FPU
  • Continuation of Pre-ILT and integration of PACS
    FM warm units into test setup as they become
    available prior to the cold ILT
  • ILT with FPU
  • SFT warm (before evacuation)
  • Nominal ILT program (incl. SFT HeI, SFT HeII,
    entire IST test procedure and parallel mode test
    verification)
  • ILT EMC phase
  • Hardware FM warm electronics and FM FPU
  • OBSW Flight versions

7
Future Test Phases (2)
  • AVM IST
  • Purpose
  • - Verification of IST test procedures
  • - Test of system related aspects (TBC)
  • Hardware DPU AVM1 (with new boot software), SPU
    AVM, BOLC AVM, DMC EM, WIH AVM
  • Software DPU OBSW V8.xx (TBD during ILT), SPU
    V12.x (TBD during ILT), DMC V6.xxx (TBD
  • during ILT and due to DMC EM hardware
  • constraints)

8
Future Test Phases (3)
  • Instrument Delivery
  • FM IST
  • Purpose
  • - Verify that PACS instrument function and
    performance is preserved
  • at satellite level, before, during and after
    environmental testing.
  • This includes TV/TB and EMC tests.
  • SVT 12 (content TBD by ESA/MOC)
  • Hardware FM warm electronics and FM FPU
  • Software Flight software, evtl. bugs/SPRs
    detected during ILT corrected