Title: HPD Project Status


1
HPD Project Status
Stephan Eisenhardt on behalf of the RICH
group LHCb planary, CERN, 10.03.2006
  • Status of HPD Production
  • HPD Test Results
  • Conclusions

2
HPD Production Status
Expected
today
3
HPD Production Details
  • order of 65 spare HPD green light given ?
    total 485 65 550 HPD
  • bump bonding of anodes (VTT) completed
  • 160 still to be tested at CERN, 90 yield so far,
    expect 50 spare wrt. needed (550 10)
  • gold plating of carriers at CERN on track
  • one bath of 40 to go, next shipment of 120
    carriers to HCM in March (to complete the 485)
  • packaging of assemblies runs smoothly
  • next shipment to DEP (120) in April, 50 tested,
    yield gt90
  • in total three more shipments needed to cover 550
    HPD
  • HPD production (DEP) according to schedule,
    gives high quality tubes
  • 160 HPDs delivered (136 Scotland, 15, CERN, 9
    pre-production)
  • output 30 HPD/month
  • recent problem 9 HPDs showed missing columns at
    DEP tests
  • under investigation too early to draw conclusion
  • ? DEP now is back to production speed, producing
    good HPDs, overall schedule not affected

4
HPD Tests
  • Photon Detector Test Facilities (PDTF)
    (Edinburgh Glasgow)
  • test rate 1 HPD / day / site
  • 2 test stations per site
  • Quantum Efficiency (Edinburgh) and Backpulse
    (Glasgow) measurement setups for 10 of HPDs
    under commission
  • stable software for data acquisition
  • ongoing improvements on data analysis software
  • highest priority database for test results

PDTF station
5
HPD Test Profile
results up to 25.02.2006
136
109
PDTF delivered 136 tested 109 pass 104 fail
5 _at_ CERN delivered 15 accepted
14 rejected 1 pre-production 9
76
today
6
Mechanical Tests
  • 107 HPD passed, 2 HPD failed
  • 2 leaned by 0.4mm
  • (Tower of Pisa)
  • ? tubes rejected
  • sent back to DEP for repotting

point of first possible contact
mechanical test jig
HPD ? 83.0mm (0.0mm, -0.1mm) Teflon tape
0.1mm Jig ? 83.4mm
gap 0.1mm
any contact failure
7
Quantum Efficiency
  • Excellent blue sensitivity _at_ 270nm
  • Reasonable low red sensitivity _at_ 800nm
  • anti-correlated to blue sensitivity
  • cause of thermal e--emission (dark count)
  • Setup for independent verification at PDTF is
    under commission

8
Leakage Current
  • typical value is 1mA (within specs)
  • class of 8 HPD with LCgt5mA
  • 7 still perform fine
  • 1 did not properly deplete (LC25.1mA)
  • ? tube rejected

3 HPD with 3 bake-outs all LCgt10mA
?
rejected
?
rejected
? Dec 05 bake-outs lt2
9
Dark Count
  • no dark count problem
  • light leak fixed after last LHCb week
  • all affected HPD remeasured
  • contractual specs DC lt 5kHz/cm2
  • safety margin factor 1000
  • before we exceed 1 occupancy
  • 16 out of 124 HPDs exceed 5kHz/cm2
  • two types
  • high red sensitivity
  • increased IFB probability
  • perfectly fine to be used in RICH
  • 1 HPD showed problem (H546002)
  • DC gt 400 kHz/cm2
  • intermittent strong ion feedback
  • 3 times baked out
  • ? tube rejected

contract spec
  • max
  • 5kHz/cm2

rejected H546002 DC gt 400 kHz/cm2
including 15 CERN HPD
10
Ion Feedback
  • due to e- ionising residual gas atoms
  • ? ion produces bunch of photoelectrons at PC
  • ? cluster of hits with 200-300ns delay
  • we find very low IFB ? very good tube vacuum

HPD response to LED pulses with varied delay
contract spec
  • max
  • 1

ltIFBgt 0.03
Very low IFB ltlt1
11
Tube Classification
  • guideline for usability in RICH
  • class A clear pass in all aspects
  • class B may fail specs, but recommended for
    usage
  • HPDs with slightly increased dark count
  • class E flagged with an issue, still usable in
    RICH
  • HPDs with increased LC or 15 dead pixels
  • class F clear fail ? reject
  • 5 failed HPDs
  • 2x mechanics Tower of Pisa
  • hope to recover
  • 1x anode failure
  • 1x intermittent IFB
  • 1x pixel chip failure
  • (not discussed here)

pass 104 of 109 gt95
fail 5 of 109 lt 5
12
Conclusions
  • bump bonding completed
  • anode production on track
  • DEP is delivering high quality HPDs
  • at a rate of 30 HPD / month
  • we keep up with testing
  • at a rate of 1 HPD / day / site
  • gt 95 pass rate
  • only very few HPD with minor issues
  • excellent Quantum Efficiency
  • very good tube vacuum