Disk module assembly - PowerPoint PPT Presentation

About This Presentation
Title:

Disk module assembly

Description:

These numbers include yield and spares. The most time-consuming part of ... run this production in the background as 'filler' work for available technicians. ... – PowerPoint PPT presentation

Number of Views:7
Avg rating:3.0/5.0
Slides: 6
Provided by: mgar47
Category:
Tags: assembly | disk | filler | module

less

Transcript and Presenter's Notes

Title: Disk module assembly


1
Disk module assembly
  • US Pixel production meeting

2
Numbers
  • 2(3) - hit system requires
  • 34(51) sectors assembled
  • 236(353) modules assembled
  • These numbers include yield and spares.
  • The most time-consuming part of module assembly
    is adding the cable to the flex hybrid and
    testing flexcable.
  • 247(371) flex cable are required
  • 100 have been done to date.
  • Rate is 2/FTE-day technician.
  • Strategy has been to run this production in the
    background as filler work for available
    technicians.
  • Given enough flexcable, bare module delivery
    limits the rate of module assembly.

3
Single Chip Processing(feeds into bare module
production in Italy)
4
Module assembly and projectionsApril projection
is based on what LBL can sustain given present
resources/plan
5
Sector loading
  • With present tooling loading rate is 2-3
    modules/FTE-day.
  • With final tooling and procedure, only the single
    pre-production sector has been loaded so far
    (just finished today)
  • Have planned for 1/week sector loading testing
    rate.
  • With start date Aug. 1 (to allow for building of
    module buffer and test setup development), this
    completes the 2 hit system in April 05.
  • Acceleration of loading beyond 1/week is clearly
    possible. Faster testing would be more difficult.
Write a Comment
User Comments (0)
About PowerShow.com