1GEORGE MASON UNIVERSITY MASTER PLAN February 2002
Fairfax Campus
Prince William Campus
Arlington Campus
2Agenda
- Introduction and Overview
- Fairfax Campus
- Prince William Campus
- Arlington Campus
3Headcount and FTE Enrollment ProjectionsExtrapo
lated from census bureau data and GMU estimates
of campus distribution
4Summary Data Supporting Master PlansAll campus
and off-campus programsGreater percent percent
increase in square footage reflects correction of
current space deficiency
5Summary of Existing Conditions
Fairfax Prince William Arlington Other Total
Site Area (acres) 677 124 5.2 806
Building Area (gsf) 2,839,907 275,346 273,000 3,388,253
Parking (spaces) 9,174 927 470 (on-site and off-site) 10,571
Enrollment (full time equivalent) 16,371 413 1,030 427 18,240
Enrollment (headcount) 21,255 1,176 1,376 853 24,660
6Overview
- FAIRFAX
- Accommodate growth for next twenty years on East
Campus - Plan for mixed use to enhance vitality
- Establish campus framework of pedestrian streets,
quads, gateways, and informal play fields to
structure future development - Preserve streams and woodlands
- Planning parking, roadway, and infrastructure to
accommodate future growth
7Overview
- PRINCE WILLIAM
- Create a flexible plan for significant campus
growth (housing, performing arts, research) - Establish a campus framework following the
principles of Fairfax Campus
8Overview
- ARLINGTON
- Implement current urban design plan at Arlington
- Accommodate additional growth with Foundation
property acquisition
9Fairfax Campus
10FairfaxCampus Facts(existing)
- Site Area
- East Campus 360 Acres
- West Campus 202 Acres
- Shirley Gate 80 Acres
- Other Parcels 35 Acres
- TOTAL 677 Acres
- Building Area
- Total 2,839,907 GSF
- Parking
- East Campus 8,261 spaces
- West Campus 677 spaces
- Other Parcels 236 spaces
- TOTAL 9,174 spaces
11Base Dataand Core Assumptions for Fairfax Campus
12Plan Parameters7 year plan defined by
projections and capital plan process recommended
phasing and priorities20 year plan
hypothetical, protects long-term development
options, phasing not determined, and dependent on
emerging priorities
13Plan Parameters7 year plan defined by
projections and capital plan process recommended
phasing and priorities20 year plan
hypothetical, protects long-term development
options, phasing not determined, and dependent on
emerging priorities
- 7 year plan defined by projections and capital
plan process recommended phasing and priorities - 20 year plan hypothetical, protects long-term
development options, phasing not determined, and
dependent on emerging priorities
14Capacity and Distribution
- Fairfax campus can accommodate projected growth,
mid-term and long-term - Some research programs should and can be
distributed to Prince William and Arlington - The West Campus is reserved for affiliated
research institutes but is not necessary to
accommodate projected growth at Fairfax for the
next 20 years - Research at Fairfax should be integrated with
other academic activity
15Campus Character and Community
- The projected limitations of the Johnson Center
must be addressed - An increased residential population must
strengthen the overall campus community at
Fairfax - The ten-minute walk circle for academic buildings
should be maintained as far as possible at
Fairfax - The role of public amenities on all campuses
should be continued and expanded to maintain ties
to the larger community - A distinctive sense of place and a clear logic of
campus organization should be reinforced at
Fairfax and Prince William
16Elements of the Plan
17Framework
- Compact, rational, readable, with emphasis on
streets, quads, quality open space and vistas
18Academic and Research Facilities
- Dense, walkable and mixed or integrated buildings
and zones
19Housing
- Critical-mass clusters of living-learning centers
with stronger links to campus core
20Student Life and Public Amenities
- Campus-wide amenities, indoors and out, not
limited to Johnson Center expanded public
services on perimeter
21Traffic and Parking
- Improved flow on campus and approach roads and
development of structured parking to provide
quick and convenient access to campus core
22Public Private Partnerships
- Public private partnerships developed in campus
format at West Campus, with eventual reversion to
University as needed joint-venture development
of facilities such as hotel/conference center
23Parking
- Issues Assumptions
- Overall parking supply is currently sufficient to
meet present demand - There is a perceived shortage of convenient
parking serving the campus core - Development of new facilities will displace 3,600
existing surface spaces which need to be replaced - Demand calculations do not account for increased
usage of Public Facilities - Data Source
- The parking supply numbers taken from the Study
of Campus Parking Capacity, Sheladia
Associates,1999 - Methodology
- Establish current parking ratio for
faculty/staff, commuter students, and residential
students - Project future demand based on projected head
count growth for 2007 and 2020 - Provide additional supply beyond projected demand
to allow for further flexibility
24Current ParkingEast Campus8,261West
Campus677Off Campus236TOTAL9,174CURRENT
PARKING RATIOSALL .34 space/person Residents
.57 space/personStaff/ Commuter .32
space/person
25Current ParkingSufficient parking to
accommodate current typical demand, but a
perceived shortage in convenient parking. Most
Convenient26 (2,038 of 7,940 spaces) within
Patriots CircleLeast Convenient19 (1,400 of
7,940 spaces) more than a ten-minute walk from
the campus core and housingReasonably
Convenient55 (4,382 of 7,940) within a
ten-minute walk from the campus core and housing
26Phase 1 ParkingEast Campus9,549 (16)West
Campus857 (27)Off Campus513
(17)TOTAL10,919 (19)Demand 275 spaces
beyond the existing inventory Supply plan adds
1,745 spacesbeyond the current inventory
27Phase 1 Parking(East Lots A-V 9,143
spaces)Most Convenient 23 (down from 26)
2,104 spaces within patriots circle Adds 366
spaces Least Convenient14 (down from 19)
1,260 spaces more than a ten-minute walk from the
campus core and housing Reasonably
Convenient63 (up from 55) 5,778 spaces within
10 a ten-minute walk from the campus core or 5
minute walk from housing Adds 1,700 spaces
28Phase 2 ParkingEast Campus13,049 (58)West
Campus3,400 (402)Off Campus648
(175)TOTAL17,097 (86)Demand 3,000 spaces
beyond the current inventory. Supply plan adds
5,200 beyond current inventory 4,500 are
contained in three new garages
29Phase 2 Parking(East Lots A-V 12,550
spaces)Most Convenient 19 (down from 26)
(2,404 spaces within patriots circle Adds 366
spaces Least Convenient7 (down from 19) 890
spaces more than a ten-minute walk from the
campus core and housing Reasonably
Convenient74 (up from 55) 9,287 spaces within
a ten-minute walk from the campus core or 5
minute walk from housing Adds 4,905 spaces
30West Campus ParkingPhase 2 (2008-20)2,500 new
spaces in lots W-1 W-4 support 600,000 SF
Research Park (assuming 4 spaces per 1,000
SF)Alternatively, or in the interim, these
lots could serve remote East Campus commuter
parking
31Traffic
- Data Source
- External traffic volumes supplied by VDOT for all
signalized intersections around the university - Internal traffic volumes extrapolated from
traffic counts at external intersections (actual
counts for internal intersections were
unavailable) - Methodology
- Determine current Level of Service (LOS) rating
for all intersections to determine congestion
points - Project future LOS rating (with and without
proposed improvements) to determine relative
impact of proposed improvements
32Traffic EvaluationEvaluate Level of
Service (LOS) Ratings for intersections at peak
hour (am/pm) with and without proposed
improvementsLOS RATINGSA Free FlowB
Reasonable Free FlowC Stable FlowD
Approaching Unstable FlowE Unstable FlowF
Forced Break- down Flow
Current C am/B pm
Current B am/A pm
UNIVERSITY DRIVE
2020 with improvement C am/C pm
RAPPAHANNOCK
GEORGE MASON
OCCOQUAN
2020 with improvement B am/B pm
2020 without improvement E am/D pm
2020 without improvement F am/C pm
RIVANIA LN
OX ROAD (ROUTE 123)
SHENANDOAH RIVER LN
SANDY CREEK
ROBERTS RD
Current B am/B pm
Current A am/A pm
PATRIOT CIRCLE
A B C D E F
2020 with improvement C am/B pm
ROANOKE RIVER RD
2020 with improvement A am/B pm
MATTAPONI RIVER LN
NOTTOWAY RIVER LN
2020 without improvement E am/E pm
2020 without improvement C am/C pm
BRADDOCK ROAD (ROUTE 620)
33Traffic ImprovementsPHASE 1 CAMPUS ROADWAY
IMPROVEMENTS2002-2007
GEORGE MASON BLVD
UNIVERSITY DRIVE
OCCOQUAN
OX ROAD (ROUTE 123)
Expand turn lanes
RIVANIA LN
SHENANDOAH RIVER LN
SANDY CREEK
ROBERTS RD
PATRIOT CIRCLE
ROANOKE RIVER RD
NOTTOWAY RIVER LN
BRADDOCK ROAD (ROUTE 620)
34Traffic ImprovementsPHASE 2 CAMPUS ROADWAY
IMPROVEMENTS2007-2020Coordinated with parking
and other improvements as funding allows
Realign Roadway
UNIVERSITY DRIVE
GEORGE MASON BLVD
OCCOQUAN
OX ROAD (ROUTE 123)
Extend Roadway
RIVANIA LN
SHENANDOAH RIVER LN
SANDY CREEK
ROBERTS RD
PATRIOT CIRCLE
ROANOKE RIVER RD
NOTTOWAY RIVER LN
BRADDOCK ROAD (ROUTE 620)
35Traffic ImprovementsEXTERIOR ROADWAY
IMPROVEMENTSDOT interaction required
Extend Roadway
Expand turn lanes
UNIVERSITY DRIVE
GEORGE MASON BLVD
OCCOQUAN
OX ROAD (ROUTE 123)
RIVANIA LN
SHENANDOAH RIVER LN
SANDY CREEK
Bridge to West Campus
ROBERTS RD
PATRIOT CIRCLE
ROANOKE RIVER RD
NOTTOWAY RIVER LN
BRADDOCK ROAD (ROUTE 620)
36TransitExtend CUE bus route to serve south
campusNew shuttle link to West Campus
University wide transit system with links to
Arlington and Price William CampusesT
Transit Stop
UNIVERSITY DRIVE
GEORGE MASON BLVD
OCCOQUAN
OX ROAD (ROUTE 123)
RIVANIA LN
SHENANDOAH RIVER LN
SANDY CREEK
ROBERTS RD
PATRIOT CIRCLE
ROANOKE RIVER RD
NOTTOWAY RIVER LN
BRADDOCK ROAD (ROUTE 620)
37BikewaysNew bike path along Patriot Circle
linking to the Campus Core, West Campus, and
possibly Old Fairfax Center
38Housing
- Capacity
- Phasing
- Relationships to other program components
39Housing 5,000 student housing beds by
20076,500 beds in 2020
40EG/Research
- Program requirements
- Mix assumptions
- Phasing
- Relationships to other program components
41Education/ General700,000 Gross Square Feet of
Academic and Research space by 2007 (including
Library addition and Physical Plant
Expansion)1.2 Million Gross Square Feetby 2020
42Education/ GeneralPhase I and Phase II academic
and research projects extend the current
10-minute walk circle to two intersecting
circles, each including the campus core, or main
street
43Student Life/Other Non EG
- Program requirements
- Assumptions about Johnson Center
- Character of new proposed facilities
- Phasing
- Relationships to other program components
44Student Life and Other Non-Education/
GeneralPHASINGAquatic Center Addition in 2002
2002-2007 Projects 2008-2020 Projects
Aquatic Center Addition (2002 Capital Project)
45Campus PartnershipsResearch Park and
Hotel/Conference Center
Addition
46Campus Framework
- Framework principles as synthesis of all above
components - Need for landscape design guideline development
- Protection and enhancement of natural systems
(woodland, streams)
47Natural Systems Preserve Streams and
GreenwaysMaintain woodland borders along campus
edge
48Open Space Network EXISTINGPondQuadsNorth/So
uth Axis Plaza
49Open Space Network A network of plazas,
pedestrian streets, and quadsPHASE
12001-2008Framework Projects
50Open Space Network New entry quad to the north
and southPHASE 22008-2020Framework Projects
51Campus Framework The natural systems and the
network of plazas, pedestrian streets, and quads
combine to create the campus frameworkThe
framework provides a coherent structure for the
campus program elements while creating a unique
sense of place
52Summary of PhasingEXISTING
Remove Temporary Modules
53Summary of Phasing 2002 CAPITAL PROJECTS
Projects currently under construction
Non-General Fund projects that are
committedProjects alreadyfunded by the General
ObligationBond
54Summary of Phasing 2002-2008 Projects
55Summary of Phasing2008-2020 Projects
56Summary of Phasing 2008-2020 ProjectsIncluding
West Campus
57FairfaxEast CampusIllustrativeMaster Plan
58FairfaxEast andWest CampusIllustrativeMaster
Plan
59Overview
- PRINCE WILLIAM
- Create a flexible plan for significant campus
growth (housing, performing arts, research) - Establish a campus framework following the
principles of Fairfax Campus
60Prince WilliamSite Area124 Acres Building
Area317,000 GSFParking927 spaces
61Base Dataand Core Assumptions for Prince William
Campus
62Price WilliamNATURAL SYSTEMSPreserve Streams
and GreenwaysMaintain woodland borders along
campus edge
63Prince WilliamOPEN SPACE NETWORKStreetsQuads
PlazasCourtyards
64Prince WilliamPARKINGFY 2007Staff/Commuter
Students(5,793 x .32) 1,854 spaces FY
2020Staff/Commuter Students (9,753 x .32)
3,121 spacesResident Students (700 x .57)399
spacesTotal3,520 spaces
65Prince WilliamBUILDING USE
66Prince WilliamPHASINGExistingPhase I Phase
II
Academic IIIa 2002 Project (GOB Funded)
67Prince WilliamILLUSTRATIVEMASTER PLAN
68Overview
- ARLINGTON
- Implement current urban design plan at Arlington
- Accommodate additional growth with Foundation
property acquisition
69ArlingtonSite Area5.2 Acres Building
Area273,000 GSFParking370 on-site100
off-site
70Base Dataand Core Assumptions for Arlington
Campus
71ArlingtonImplement current urban design plan at
ArlingtonPlan for additional growth with
Foundation property acquisition
200,000 SF Office Building Site (Foundation)
Arlington II 2002 Project (GOB Funded)
72Conclusion
- The Campus Master Plans . . .
- Reinforce the University Mission and Strategic
Plan - Refine the Distributed University Model to create
a specific vision for each campus - Establish the identity and physical environment
to support GMU as a major research university