Title: P100 Industry Day


1
P-100Industry Day
  • 29 November 2007

2
What is the P100?
The Facilities Standards for the Public Buildings
Service The P100 is a mandatory standard. It is
not a guideline, textbook, handbook, training
manual, nor substitute for technical
competence. The standards represent the current
state of practice in designing facilities to meet
GSA's commitments, maximize the efficiency of
business processes, and comply with the
requirements of law. The Facilities Standards
must be used in conjunction with the building
program for each project.
3
Application of the P100
  • Applies to all new building projects
  • Applies to Repair and Alteration projects
  • Applies to Modernization projects
  • Applies to Lease Construct with Government Option
    to Purchase
  • Does not apply to Lease Construct

4
What is in the P-100, What is not
  • Included
  • Implementation of Laws and Regulations
  • Codes and Standards
  • Lessons Learned
  • Processes (A/E)
  • Program Descriptions
  • Not Included
  • Material that can be referenced

5
(No Transcript)
6
Guiding Principles for 2008 Revision
  • P-100 is a cornerstone document for PBS.
  • Incorporate new legal requirements for energy
    conservation and sustainability.
  • Clarify what is required as opposed to what is
    recommended.
  • Simplify the document by not repeating what is
    detailed elsewhere.

7
Major Revisions
  • Break Chapter 1 into an Introduction and General
    Requirements
  • Site Design as a part of Architecture
  • Reformat the chapters to clarify what is required
    v what is recommended
  • Incorporated new energy requirements
  • Integrate security requirements
  • Put secondary information in an Appendix
  • Incorporate new lessons learned - UFAD

8
General Chapter Format
  • General Intent of the Chapter
  • Codes and Regulations
  • GSA Programs Affected by Chapter
  • Required Design Standards
  • Recommended Design Practices

9
Chapters in the P-100
10
Appendices
11
Major Technical Changes
  • UFAD, Raised Flooring
  • Energy Requirements EPAct 2005, EO
  • Energy Star Target Finder for energy budget
  • Lower lighting intensity
  • WaterSense and low water use
  • More LEEDs and Sustainable design
  • Building Envelope and Energy Analysis

12
How are the standards enforced?
  • P100 is a mandatory contract requirement
  • During specific design reviews
  • Reviews are conducted by independent design
    firms, CMa, and GSA.
  • Commissioner of the public building service
    approves the concept design
  • Construction funding is dependent on successful
    design completion

13
  • Questions

William Holley, PE Chief Engineer Office of the
Chief Architect William.holley_at_gsa.gov 202-208-0
297