JNTC Support Elements SE - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

JNTC Support Elements SE

Description:

... JNTC COCOM training requirements analysts & training designers to perform future ... Analyze emerging COCOM missions / warfighting capabilities requirements and ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 7
Provided by: andre116
Category:
Tags: jntc | elements | support

less

Transcript and Presenter's Notes

Title: JNTC Support Elements SE


1
JNTC Support Elements (SE)
  • Topic Continued senior leader support of the
    JNTC SE program is required.
  • Status
  • JNTC SE represent a cadre of personnel, provided
    by USJFCOM, that are permanently assigned to a
    COCOM staff, Service training program, or other
    Service activity for the purpose of efficiently
    implementing the JNTC and other T2 capabilities.
  • Currently, 32 of 37 JNTC SE personnel have been
    identified / deployed. An additional 17 JNTC SE
    personnel will be deployed by the end of FY 06.
  • Issue(s) Request for continued support as the
    program enters subsequent phases of the
    deployment.
  • Impact Phase II will introduce JNTC COCOM
    training requirements analysts to perform future
    training requirement analysis and conceptual
    development of future training methods and
    systems. Phase II will also see us deploy SEs to
    include all accredited (nominated) Service
    Training Programs and expand our collaborative
    knowledge and requirements sharing process for
    all personnel conducting T2 functions.
  • Actions to Resolve Issue (Current / Planned)
  • Continue to update senior leadership through the
    JIPT, SAG, and ESG forums.
  • Continue to solicit support and involvement for
    the JNTC SE program.

2
SE Fielding Concept
  • SE fielding will be accomplished in phases
  • Phase I was FY 05 fielding
  • 5 per Service and SOCOM
  • 2 per geographic combatant command
  • 1 per functional combatant command
  • Phase II will commence in FY 06
  • Commitment to having at least one SE per
    currently accredited (or nominated) Service
    training program
  • 1 additional SE to COCOMs for future training
    design development.
  • Phase III will be based on results of
    accreditation

3
Phase I Highlights
  • Team is gelling as an effective instrument for
    Training Transformation
  • Assisting programs with Accreditation and
    Certification
  • Identifying JNTC architecture requirements
  • Aiding in getting programs on the JTEN
  • Aiding programs with planning and executing joint
    training
  • Involved with ITE
  • Being received well
  • SE have been a great addition SOCOM
    representative at the September JIPT
  • Continuing to actively recruit for remaining
    positions
  • Working with local commands to identify
    candidates
  • Using internal and external recruiting sources
  • Company websites
  • Ads in the local papers
  • Service transition websites

4
Service SE Concept
  • Phase I Concept
  • Accreditation, certification and joint training
    needs identification and analysis
  • Assist in development and evaluation of joint and
    interoperable training objectives
  • Training program planning, execution, and
    analysis support
  • JNTC investment planning and implementation
    coordination
  • Technical integration and technical and logistics
    support
  • Phase II Concept
  • All FY 05 functions
  • Expand efforts to ensure there is at least one SE
    assigned to every accredited (nominated) Service
    Training Program
  • Introduce RD Laboratory LNOs to better
    integrate Service architectures with JNTC
    architectures.
  • Provide collaborative knowledge and requirements
    sharing process for all personnel conducting T2
    functions

5
Combatant Command SE Concept
  • Phase I Concept
  • Accreditation, certification and joint training
    needs identification and analysis
  • Assist in development and evaluation of joint and
    interoperable training objectives
  • Training program planning, execution, and
    analysis support
  • JNTC investment planning and implementation
    coordination
  • Technical integration and technical and logistics
    support
  • Phase II Concept
  • All FY 05 functions
  • Introduce JNTC COCOM training requirements
    analysts training designers to perform future
    training requirement analysis and conceptual
    development of future training methods and
    systems
  • Provide collaborative knowledge and requirements
    sharing process for all personnel conducting T2
    functions

6
JNTC COCOM SE coordination w/JTSS
  • JTSS Work immediate COCOM training requirements
  • Support implementation of JTS
  • Coordinate JMETL development
  • Draft Joint Training Plan (JTP)
  • Support JTIMS use
  • SE personnel perform future training requirement
    analysis and conceptual development of future
    training methods systems
  • Analyze emerging COCOM missions / warfighting
    capabilities requirements and translate them into
    JNTC plans
  • Work with COCOM and JMO to determine how to meet
    those requirements (i.e. expanded JTEN, new MS
    capability, etc,.)
  • Help determine implications for JNTC as a whole

7
Phase I Update
8
Phase II Deployment
Write a Comment
User Comments (0)
About PowerShow.com