Title: Joint Staff J7 Joint Exercise and Training Division Update
1Joint Staff J-7Joint Exercise and Training
Division Update
- CAPT Alexander
- Chief, JETD
- 20 Sep 07
As of 18 Sep _at_617 PM
2Overview
- JS/J-7 Reorganization
- 3500-series publications updates
- Training Trends Way Ahead
- JTSS Contract
- CE2 Congressional Action
- WJTSC 08-1 and 08-2
3JS/J-7 Reorganization
- J-7 has reorganized from five divisions to four
- Joint Operational War Plans Division (JOWPD)
- Joint Education and Doctrine Division (JEDD)
- Joint Experimentation, Transformation, and
Concepts Division (JETCD) - Joint Exercise and Training Division (JETD)
- Merged Joint Training Division and Joint Exercise
Division - NOTE The JTFCB now reports directly to Deputy
Director, J-7
43500-series publications updates
- Key publications
- CJCSI 3500.01D, Joint Training Policy and
Guidance (JTPG) - Minor update, 31 May 07
- CJCSM 3500.03B, Joint Training Manual (JTM)
- Major revision, 31 Aug 07
- CJSCN 3500.01, Chairmans Joint Training Guidance
(CJTG) - Annual notice, 31 Aug 07
- CJCSI 3150.25C, Joint Lessons Learned Program
(JLLP) - Minor revision, 11 Apr 07
- Change summaries are provided in the documents
- Please review each publication in its entirety
for changes - Other publication updates in development/staffing
- CJCSI 3500.04 Universal Joint Task List (UJTL)
5Training Trends
- Background
- At WJTSC 06-2, the responsibility to develop and
brief Training Trends was transferred from
USJFCOM to JS/J-7 - See issue 06-007
- Progress to Date
- Policy (JTPG) changed to reflect new OPR
- JTIMS V2.3 (Oct 07) will provide the following
capabilities in support of Training Trends - TPA archive/retrieval
- Trend report generation
- JS/J-7 Intent
- Combatant commands fully use JTIMS Assessment
module during FY08 - No additional data calls--enter once, use many
times - JS/J-7 develop and report trends at WJTSC 08-2
(Sep 08)
6JTSS Contract
- Joint Training System Specialist (JTSS) IDIQ
Contract vehicle (W74V8H-05-D-0018) provides - Joint Training System Specialists (JTSS)
- Joint Interagency Training Specialists (JIATS)
- Joint Lessons Learned Program Specialists (JLLS)
- Joint Training Facilitator Specialists (JTFS)
- Contract currently in 2nd Option Year
- Contract ceiling is 28.51M
- Ceiling was originally based on 2005 T2-funded
positions (JTSS, JIATS, and JLLS only) - 2006 added the first set of JTFS positions
- 2006/2007 added the second/third set of JTFS
positions and a significant amount of funds MIPRd
from combatant commands for additional positions - Ceiling has been attained early
- J-7 is in negotiation with our Contracting Office
(CCE) to extend ceiling until contract can be
recompeted
7CE2 Congressional Action
- HAC-D proposed consolidation
- Senate version of bill released 12 Sep, floor
vote NET 24 Sep - No decrement
- No consolidation
- Implications of HAC-D version, if approved by
full Congress - JEP consolidation into CE2
- Additional WBS elements, PBR/RER, sections for
PPlan, PGO, PEP - Service incremental consolidation into CE2
- Services become primary stakeholders
- Additional WBS elements, PBR/RER, sections for
PPlan, PGO, PEP - 35M mark
- Exercise Validation Working Group discussed impact
JEP 245.075M CE2 Service Incremental
81.827M CE2 Service JNTC 63.600M T2 Decrement
- 35.000M CE2T2 (Staffer re-take on 12 Sep
not just targeted at
JEPtargeted at CE2T2) Anticipated efficiencies
and constrained program growth in JEP 60 day
report required (30 Nov 07) analysis of funds
and personnel transferred
8WJTSC 08-1 and 08-2
- The PEC cannot support our requests for WJTSC
08-1 (10-14 Mar 08) or WJTSC 08-2 (8-12 Sep 08)
due to other NGB priority requirements potential
venues are
Venue may not provide sufficient hands-on
classroom capability (JTIMS, UTDT, DRRS, JLLIS)
9Backups
10CSA Sidebar
- JS/J-7 would like to meet with representatives
from the following CSAs after this afternoons
scheduled meetings to discuss JTSS requirements - DCMA (JTSS assigned)
- DIA (JTSS assigned)
- DISA
- DLA
- DTRA (JTSS assigned)
- NGA (JTSS assigned)
- NSA
- Please assemble in Room 235 at 1730
11JTIMS v2.3 Training Trends Requirements(Reports)
- 382 (JTIMS581) Add Training Trends Report to
the Joint Staff Reports folder (mockup included) - 432 (JTIMS1090) Create Training Trends Reports
(METL Training Assessment and DOTMLPF Reports)
(mockup included)
12382 (JTIMS581) Add Training Trends Report to
Joint Staff Reports Folder
13382 (JTIMS581) Add Training Trends Report to
Joint Staff Reports Folder
14382 (JTIMS581) Add Training Trends Report to
Joint Staff Reports Folder
15432 (JTIMS1090) Create Training Trends Reports
(METL Training Assessment and DOTMLPF Reports
16432 (JTIMS1090) Create Training Trends Reports
(METL Training Assessment and DOTMLPF Reports
The Organization selected is no more than 10
organizations
Business Rules - The Mission drop down menu will
list only missions for the selected organization
(s). - Users can only select a single mission
to run the report against. - The system drop
down lists all Mission Names recorded in JTIMS
(duplicate names are not repeated, ie. CORE is
listed once).
17432 (JTIMS1090) Create Training Trends Reports
(METL Training Assessment Report)
18432 (JTIMS1090) Create Training Trends Reports
(METL Training Assessment Report)
19432 (JTIMS1090) Create Training Trends Reports
(DOTMLPF Report)
Business Rules - Users can enter a date
(start/end period) to filter the results. - Users
can only select a single Organization. - Users
can only select a single or multiple missions. -
Users can only select a single DOTMLPF category.
20432 (JTIMS1090) Create Training Trends Reports
(DOTMLPF Report)
21432 (JTIMS1090) Create Training Trends Reports
(DOTMLPF Report)
22432 (JTIMS1090) Create Training Trends Reports
(DOTMLPF Report)
23Interagency Coordination
- Background
- There is no single DoD office/clearinghouse to
collect, prioritize, and coordinate requirements
for Interagency participation in joint exercises,
training, or experimentation - Non-DoD departments and agencies service DoD
requirements on a first-come, first-serve or ad
hoc basis - Several WJTSC Issues (e.g., 07-001) emphasize the
need for a defined process and for increased
participation - OSD (PR)s Stability Reconstruction initiative
(Training Strategy Concept Paper) assigns the
responsibility to JS/J-7 (for DoD), and to
DoS/CRS and USAID/DCHA for Stability
Reconstruction (i.e., SSTR) exercises, training,
and experimentation - Strategy briefed to Senior Leader Round Table on
11 Sep 07
24Coordinator Responsibilities
- R S Training Strategy Recommendation No. 3
identifies Training Coordinator responsibilities - Training Coordinators for DoD, DoS, and USAID
will develop appropriate internal and external
processes for - Collating, prioritizing, and adjudicating
internal exercise, training, and experimentation
requirements (i.e., DoD requirements of other
departments/agencies) - Prioritizing and adjudicating external training
support requests (i.e., DoD support to other
departments/agencies) - Timeline
- 9 Jan 08 - internal processes developed and
staffed - 5 Apr 08 - external processes documented in
approved MOUs
How best to accomplish this, leveraging existing
processes/products?
25DoD Process - Initial Thoughts
- DoD Internal Requirements Process
- Identify stakeholders
- Identify formats (e.g., JTIMS) and timelines for
submitting requirements - Collect and collate requirements
- Stakeholders collaboratively adjudicate and
prioritize requirements - Formally coordinate prioritized list (e.g.,
JSAP) - Provide prioritized list to Interagency
Coordinators - Provide Interagency Coordinator responses to
stakeholders and conduct further adjudication, if
necessary - Finalize execution plan
- Track execution and report results
- Coordinate emerging requirements changes
- DoD External Requirements Process
- Collaboratively review and adjudicate (solicit
or designate responsibility for) Interagency
requests - Formally coordinate prioritized list (e.g.,
JSAP) - Report back to Interagency Coordinators
- Track execution and report results
- Coordinate emerging requirements changes
- Related Processes
- Semi-annual WJTSC conferences (Spring/Fall)
- NEP Exercise/Evaluation PCC (Summer)
- USJFCOM Joint Training Coordination Conference
(Winter) - USJFCOM Interagency Training Catalog
- Supporting Tools
- JTIMS
- JKO
DoD Stakeholders Combatant Commands, Services,
Combat Support Agencies, OSD, Joint Staff
The Strategy applies only to RS (SSTR) related
requirementsshould this be expanded to all joint
training, exercises, and experiments? Or,
implement for RS first, then consider expanding
to all requirements
26Interagency Coordinator Responsibilities
OSD (PR)s Stability Reconstruction initiative
(Training Strategy Concept Paper) recommends
- Collate requirements across the USG Agencies
and develop a net-centric Lessons Learned system
that addresses whole of government lessons
learned needs - OPR
S/CRS, USAID/DCHA, OSD (P)/STB, CCO, JS J7 and
the US Institute of Peace - Requirements
identified by 1 Feb 08, Lessons Learned system in
place Aug 08.
27Develop a net-centric system to collect
Reconstruction and Stabilization Lessons Learned
- The Joint Lessons Learned Information System
(JLLIS) is the current DoD Lessons Learned (LL)
system in development. JLLIS is net-centric, GIG
compliant, interfaces with JDEIS, JTIMS, DRRS,
and can be utilized on both NIPR and SIPR
systems. - JLLIS consists of an input tool that can be
tailored to meet organizations business rules and
a Joint Lessons Learned Repository (JLLR) that is
a searchable archived database. - JLLIS could be used by DoD and the Interagency
for the collection of Reconstruction and
Stabilization (RS) LL. - - Specific links in the system could be
activated for the collection of RS LL allowing
the current system to be utilized with little or
no additional cost - - Organizations that do not utilize JLLIS
for their normal LL collection could be given an
instance to collect, archive, and manage RS LL - JLLIS is the most cost effective and efficient
system for this requirement.
28DoD Process - Next Steps
- Action Timeline
- Develop strawman process Oct 07
- Present process to DoD
- stakeholders (VTC, etc.) Nov 07
- IPR to SLRT Nov/Dec 07
- Formally coord process Dec 07
- Present process to OSD Jan 08
- Work with other Agency
- Coordinators to develop
- External process(es) Jan 08
- Formally coord process Feb 08
- Provide update brief Mar 08 (WJTSC)
- Present process to OSD Apr 08
- Begin Execution TBD
Processes will be developed collaboratively with
all stakeholders.