Title: Design Review November 11, 2003


1
Design ReviewNovember 11, 2003
  • Projects
  • Interactive Campus Map (ICM)
  • Adjustable Book Shelf (ABS)
  • Global Positioning System Device for the Visually
    Impaired (GPS-DVI)

2
ICM
Interactive Campus Map
  • Objective To help students with physical
    disabilities locate the best accessible path
    between campus locations by drawing a map

3
Group Members
  • Jeff Turkstra Project Leader / Programmer
  • Abdul Zahid Technical Programmer
  • Avirul Sharma GPS coordinator
  • Vishnu Jaju Graphic Designer/Multimedia

4
Semester Goals
  • Install functioning Kiosk in MSEE Building
  • Expand area, and plan improvements
  • Better map images
  • Actual distance calculations
  • Voice recognition synthesis

5
Initial Tasks
  • Kiosk has to be picked up from machine shop and
    building services contacted regarding
    installation - DONE
  • Computer Kiosk has to be configured and setup for
    user access - DONE
  • Obtain more GPS coordinates for all of campus -
    PARTIALLY DONE
  • Get user feedback Plan new features - PARTIALLY
    DONE

6
Web-Interface
  • Facilitates channeling of the user input data to
    the best path implementation routine
  • Simple and easy to use
  • Easy to maintain for future semesters
  • Accessible via home computers, not just kiosk

7
Nodes in the Map
8
Node Database
  • Database example
  • For GPS coordinates (Latitude, Longitude)

9
This Semester
  • Kiosk is ready (but ICM software is still under
    construction)
  • Larger, more detailed map integration is in
    progress
  • Coverage area has been significantly expanded
    over last semester
  • Resolved compilation errors with core source code

10
Coverage Area
  • Engineering Mall (from last semester)
  • Area surrounding (and including) BRNG, MATH, and
    CL50
  • Clock tower area (SC, CS, PSY)
  • Chemistry area (WTHR, BRWN, GRIS, HEAV, etc)

11
Prototype Ideas
  • Work has been done on planning methods to
    interface with GPS-DVI
  • Theoretical design for mysql driven PHP interface
    permitting the posting of current GPS
    coordinates and destination coordinates to the
    server, which would in turn generate and send
    back a map with text based turn-by-turn directions

12
Semester Timeline
13
Adjustable Book Shelf
  • Team Members
  • Sandeep Nandy (Project Leader)
  • Ankit Dhawan Vineet Alva
  • Shohei Shibata Rayelle Duncan

14
Agenda
  • Timeline
  • Design Parameters
  • Turn Shelf Concept
  • Slide Down Concept

15
Timeline
16
Design Parameters
  • Cost less than 500
  • Requires very little muscle force by user
  • Hold at least 8 10 books
  • Makes use of current dorm shelving unit
  • All books are attainable from a seated position

17
Turn Shelf 3-D view
18
Turn Shelf Side View with dimensions
19
Turn Shelf Accomplishments
  • Dimensions and clearances determined
  • CAD models completed
  • Book Capacity determined (12 books 2 thick)
  • Max weight it will experience 50 lbs

20
Turn Shelf Uncertainties
  • Use of Motor with belts
  • Pros Will require little or no muscular force
    by user
  • Cons High Cost, higher chance of failure by
    parts
  • Use of flat metal coil springs
  • Pros Low cost, low risk of failure
  • Cons Anchorage of string, will require slight
    initial force by user

21
Slide Down Bookshelf Design
  • An adjustable bookshelf that fits inside the
    existing shelf.
  • Slides down at an angle onto the desk.

22
Accomplishments
  • Basic mechanisms and components of the bookshelf
    has been designed
  • CAD drawing and dimension drawings are complete
  • Capacity and loads have been approximated

23
Pros and Cons of Sliding Design
  • Pros
  • More space
  • Easier access
  • Less complicated motions
  • Cons
  • Requires more forces
  • Possibly requires electrical assistance
  • Noise
  • Cost
  • Space

24
Future Plans
  • Means of lifting the shelf back up needs more
    research
  • Safety Measures
  • Counterweight idea is being considered
  • Every component will be designed to more details
  • Decision to be made on our final solution, as
    well as contacting University Residences for
    their input

25
GPS-DVI
  • Global Positioning System
  • Device for the Visually Impaired
  • Team members
  • Guneet Chadha
  • Sivanit Ratanadib
  • Ryan Hicks
  • 4. Howard Lityo

26
Introduction
  • GPS-DVI Team project that involves the
    development of a handheld device, incorporating a
    PDA with a GPS receiver which will aid students
    who are visually impaired in navigation around
    the campus.

27
Overview
  • Project partner meeting
  • Creation of Sub-Groups
  • Assimilation
  • Research
  • Current State

28
Project Partner Meeting
  • Requirements of the device
  • Interact with GPS reciever
  • Voice output
  • 90 degree turns
  • Tactile overlay
  • Telephone like keypad
  • Shortest Path Algorithm

29
Creation of Sub-groups
30
Assimilation
  • Retrieval of equipment
  • Determine previous work accomplished
  • GUI
  • Building codes
  • Device driver (does not compile)
  • Determine work to accomplish
  • Device Driver
  • Algorithm
  • Voice Output

31
Research
  • Met with EPICS Mobility TAs
  • Explanation of how to use Microsoft Embedded
    Visual Tools 3.0
  • Suggested that we buy device driver (dll)
  • Researched GPS Receivers
  • Teletype 1358 (no dll exist)
  • Received manual
  • Teletype 1658 (a dll exist)
  • Pretec Compact GPS Compact GPS-LP
  • NavRoute HP-610PC (no dll exist)
  • TextAloud MP3

32
Current State
  • We have obtained our PDA!
  • Verified working function of GUI
  • Received streams of GPS data
  • Configuration of GPS receiver in progress
  • Plan to integrate building codes with GUI
  • Continue to debug the device driver code from
    Fall 2002

33
  • Questions,
  • Comments, Suggestions