Defense Supply Center Richmond - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Defense Supply Center Richmond

Description:

New SAR Request Database and Tracking Application is now in ... If SAR must be approved by ESA, create 339 (180 day response time) and notify COMPAD office. ... – PowerPoint PPT presentation

Number of Views:271
Avg rating:3.0/5.0
Slides: 18
Provided by: gst
Category:

less

Transcript and Presenter's Notes

Title: Defense Supply Center Richmond


1
(No Transcript)
2
Determine What It Is?
  • Source approval is dependant upon several
    factors
  • Is the item Critical Safety Item (CSI)?
  • Is the item Controlled Source?
  • Is the item on a Source Controlled drawing?
  • Is the item Drawing Proprietary?
  • Is the item Competitive?
  • Is the item Fully Competitive?
  • Are there special Quality Assurance Requirements?

3
What do those Codes mean?
  • The Government uses a Two position Acquisition
    Method Codes (AMC) Acquisition Method Suffix
    Code (AMSC) code to identify how an item is
    procured. Here are a few examples of those
    codes
  • AMC 1 competitive (multiple sources)
  • AMC 3 sole source (direct purchase
    manufacturer)
  • AMSC B source controlled, OEM approval
    required
  • AMSC C controlled sources, ESA approval
    required
  • AMSC D data not physically available
  • AMSC G fully competitive, no approval
    required
  • AMSC H inadequate data for full open
    competition
  • AMSC T qualified products list (QPL)

4
Who says its Critical?UNCLE SAM SAYS SO!
  • The Military Services provide DLA with Weapon
    System Essentiality Codes that dictate the
    Criticality Statements in the Purchase Order
    Text.
  • EC1 Failure renders end item inoperable
  • EC5 Needed for Personnel Safety
  • Either of these codes means the item is
    Critical Application.
  • The Military Services also provide DLA with lists
    of Materials that must be managed in a very
    specific manner in order to guarantee Aircraft
    and Aircrew safety. DLA uses Special Procedure
    Codes to dictate unique management of these
    items. Examples are CRITICAL SAFETY ITEM (CSI),
    AIRCRAFT LAUNCH and RECOVERY EQUIPMENT (ALRE),
    INDIVIDUAL REPAIR PARTS ORDERING DATA (IRPOD) and
    ICBM Nuclear Hardened Items.
  • There are STRINGENT rules associated with all of
    these SPECIAL items.

5
JALC
  • The Joint Aeronautical Logistics Commanders from
    Army, Navy, Air Force, Marine Corps, DLA, DCMA,
    NASA, FAA address Joint Logistics issues.
  • Under the direction of Congress (Section 802 of
    the National Defense Authorization Act for Fiscal
    Year 2004), DoD established policy guidance for
    the source and quality control requirements of
    CSIs.
  • JALCs Joint Instruction Management of Aviation
    Critical Safety Items provides this direction
    for all of the above activities follow.
  • JALCs Aviation CSI Handbook provides additional
    requirements for processes like source validation
    and approval.
  • DSCR manages the official CSI list for all DLA
    procurements.

6
How long is Source Approval good for?
  • The JALC Instruction specifies that alternate
    sources of Critical Safety Items must be
    revalidated by the military service(s) after 3
    years. This does not require another SAR. If
    the Engineering Support Activity (ESA) does not
    impose new testing or quality requirements, the
    contractor has no adverse quality history, has
    not moved or changed processes, then this should
    be a simple review initiated at DLAs request.
  • The JALC Instruction specifies Production Lot
    Testing and First Article Test, but DLA has been
    granted authority to waive First Article Test
    under certain conditions, particularly no adverse
    contractor quality history, or if contractor has
    manufactured and sold the item, or similar item,
    within the past 3 years.

7
Who Approves My SAR?
  • All Critical Safety Items (CSI) Critical
    Application Items, Aircraft Launch Recovery
    (ALRE), Individual Repair Parts Ordering Data
    (IRPOD), ICBM Nuclear Hardened Items, and
    Controlled Source items must be reviewed by the
    Engineering Support Activity (ESA) for source
    approval.
  • The Original Equipment Manufacturer (OEM) has
    approval authority for items on Source Controlled
    drawings.
  • Due to the detailed review processes involved,
    Procurement Awards are not held pending the
    review and determination of formal Source
    Approval Request (SAR) packages when material
    supply demand requirements dictate.

8
Who Approves My SAR?
  • Source approval is not evaluated for items where
    the drawings are designated Proprietary unless
    formal documentation of Data Rights Use Authority
    or Release of Data Rights from the OEM is
    provided at the time of the Source Approval
    Request.
  • Source approval for non-critical Sole Source or
    Competitive items may be performed at DSCR if the
    ESAs have not placed restrictions on the item.
  • Source approval is not required for items that
    are Fully Competitive.
  • There may be specific Quality Assurance
    Requirements imposed by the ESAs to address any
    unique characteristics that need to be controlled.

9
What do I need to provide?
  • For Non-critical (3H, 3D or 1H, 1D) items
  • Cover letter stating your desire to become an
    approved source on a specific Material.
  • Current, complete legible technical data
    package to include drawings, sub-tier drawings,
    parts lists and first page of all applicable
    specifications.
  • Certificate of Law on Company Letterhead signed
    by a responsible Company official

10
What do I need to provide?
  • For Controlled Source items 3C or 1C, use
    DSCR Source Approval Guide located on the DSCR
    Small Business page to decide what data is
    required. If the SAR is complete, DSCR will
    forward the package to the ESA.
  • For Source Controlled items coded 3B or 1B,
    the contractor must forward their Source Approval
    Request to the Design Control Activity or OEM
    (Original Equipment Mfg.)
  • For QPL items coded 1T source approval must be
    submitted to the approving authority listed on
    the specification for review and acceptance.
  • By definition all C and B coded items ARE
    Critical

11
DSCR SAR CHECKLIST
  • The Contractor should first select which category
    is appropriate for the part they wish to become
    approved to manufacture. The Contractor must
    then provide in the Source Approval Request (SAR)
    all elements that are checked under the category
    selected. If a requirement does not exist for a
    specific part (e.g. no test plan required) then
    provide a statement to that fact.  
  • Reverse Engineering is handled through DSCRs
    Value Engineering Branch. There is a link on the
    DSCR Small Business Web site.  


12
DSCR SOURCE APPROVAL CHECKLIST I SAME
PART II SIMILAR PART (EQUIVALENT) III NEW
MANUFACTURER
13
FAA/PMA
  • An FAA Parts Manufacturer Approval (PMA) part is
    an FAA-approved replacement for an FAA type
    certified part
  • PMA suppliers must demonstrate to the FAA through
    identicality or test and computation (reverse
    engineering) that the part is the same or better
    than the part it seeks to replace

14
What happened to my SAR? or The BLACK HOLE
  • New SAR Request Database and Tracking Application
    is now in development
  • COMPAD Small Business input/oversight
  • DSCR 339 Focal Point input
  • DSCR Procurement Information Memorandum
  • Process Buyers must follow
  • DSCR Technical Review Guidelines (Deskbook
    Appendix B-24)
  • Process Product Specialists must follow

15
What happened to my SAR? or The BLACK HOLE
(cont)
  • Buyer Procedure
  • Savings thresholds must be evaluated (200.00 for
    a local DSC evaluation plus 1,500.00 per
    Engineering Support Activity) The buyer must
    provide the Product Specialist the dollar amount
    of potential savings when an Alternate Offer
    evaluation is requested.
  • If the Procurement can wait for Evaluation,
    forward SAR to Product Specialist for immediate
    review and hold the Buy.
  • If Evaluation is to be considered for Future
    Requirements
  • Prepare FL62 (DPACS Evaluation Prepare
    Evaluation Forms)
  • Original to COMPAD with copy and forward SAR
    package to Product Specialist
  • Copy for file

16
What happened to my SAR? or The BLACK HOLE
(cont)
  • Product Specialist Procedure
  • SAR Evaluation
  • Determine if SAR can be reviewed locally or must
    be sent to ESA.
  • Evaluate SAR against Source Approval Guide
  • If SAR must be approved by ESA, create 339 (180
    day response time) and notify COMPAD office.
  • Send SARs to all ESAs that have an interest in
    the item.
  • Provide approval/disapproval letter to Buyer or
    COMPAD office.
  • Note NAVY SARs are held pending
    designation of which BDE (Basic Design
    Engineer) needs to review the package.

17
Alternate Offers Clauses
  • Clauses can be viewed on the Worldwide Web at the
    following addresses
  • http//www.dscr.dla.mil/proc/clauses/files/L54.txt
    52.217-9002 CONDITIONS FOR EVALUATION AND
    ACCEPTANCE OF OFFERS FOR PART NUMBERED ITEMS
  • http//www.dscr.dla.mil/proc/clauses/files/L58.txt
    52.217-9G04 FLIGHT SAFETY CRITICAL PART,
    CRITICAL APPLICATION, ITEM DOCUMENTATION
    REQUIREMENTS
  • http//www.dscr.dla.mil/proc/clauses/files/L59d.tx
    t 52.217-9G23 RESTRICTION OF ALTERNATE OFFERS
    FOR SOURCE CONTROLLED ITEMS
Write a Comment
User Comments (0)
About PowerShow.com