Internal Assessments at Argonne Accelerator Facilities - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Internal Assessments at Argonne Accelerator Facilities

Description:

01: DEP should include a staff member from another division during its safety walkthroughs. ... the issues identified during walkthroughs and track them to ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 8
Provided by: advan78
Category:

less

Transcript and Presenter's Notes

Title: Internal Assessments at Argonne Accelerator Facilities


1
Internal Assessments at Argonne Accelerator
Facilities
  • S.W. Butala
  • Presented at the DOE Accelerator Safety Workshop
    - BNL
  • August 19, 2009

2
Argonne Accelerator Facilities
  • Advanced Photon Source (APS)
  • ATLAS (Physics Division)
  • Argonne Wakefield Accelerator (AWA)
  • 3 MeV Van de Graaff (CSE)
  • 20 MeV high current linac (CSE)
  • 2 MeV Van de Graaff (DEP)
  • MSD accelerator facility
  • IPNS (shutdown December 2007)
  • 5 MeV Dynamitron (shutdown - Physics Div.)

3
Accelerator Internal Assessments
  • Accelerator Safety Review Committee (ASRC)
  • Compliance, Oversight, Assessments Group (COA)
  • Facility self assessments

4
ARSC Assessment Findings 04/05
5
ARSC Assessment Findings 06/07
6
ARSC Assessment Findings 08/09
7
Recent COA Assessments
  • April 2009 - Work Planning Control APS
  • SADs not reviewed annually, per ASPM
  • LOTO of fire protection valves
  • Fire doors propped open
  • April 2009 - Work Planning Control Physics
    (ATLAS)
  • SADs not reviewed annually, per ASPM
  • ATLAS conduct of operations matrix not approved
    by DOE
  • Inadequate crane inspections
Write a Comment