Title: Maurice Hill
1Environmental Risk Analysis and Wave Energy
Examples of How to Assess Potential Impacts of
Wave Energy on the Environment
- Maurice Hill
- Alternative Energy Alternate Use Program, MMS
- Presented by
- Fred Piltz, MMS
- Ecological Effects of Wave Energy Workshop
Hatfield Marine Science Center - October 11, 2007
2Risk Analysis of Wave Energy Projects
- Develop a complete project description
- Identify impacting agents (or stressors)
3Risk Analysis of Wave Energy Projects
- Key Stressors for Wave Energy Projects
- Emplacement mainly temporary
- disturbances (e.g., benthic smothering)
- Operation
- Buoys
- Transmission system
- Anchoring system
- Decommissioning
- Routine and emergency maintenance
4Risk Analysis of Wave Energy Projects
- Major Issues by Stressor
- Wave and current modification
- New hard structures water
- column and benthic
- Electromagnetic fields
- Chemical toxicity
- Acoustics
- Cumulative effects
5Risk Analysis of Wave Energy Projects
- Identify geographic scope or boundary of project
- Identify temporal scope or boundary of project
6Risk Analysis of Wave Energy Projects
- Identify resources (or receptors) that could be
affected and regulatory protections - Define significance threshold(s) for receptor
- Conduct public scoping process to identify issues
and concerns, data sources, etc.
7Risk Analysis of Wave Energy Projects
- Describe baseline for the receptor
- Assess potential direct and indirect impacts to
receptor from each project stressor
8Risk Analysis of Wave Energy Projects
- Determine the probability (risk) of the impacts
actually occurring - Describe potential direct and indirect impacts to
receptor from total of all project stressors
9Risk Analysis of Wave Energy Projects
- Identify the magnitude and significance of the
impact to the local population regional
population - Describe cumulative impacts for receptor
10Risk Analysis of Wave Energy Projects
- Identify potential mitigation measures for each
impact - Determine residual effect with mitigation
11Risk Analysis of Wave Energy Projects
- Identify alternative approaches to the project
- Develop inspection strategy
- Develop monitoring strategy
- Develop adaptive management strategy
12Adaptive Management
13Matrix Approach