Preproposal Conference
  • W912JD-08-R-0001
  • REPLACE AIRCRAFT PARKING APRON PHASES 1 AND 2

2
CONSTRUCT THIS PROJECT AT Bangor ANG Base,
Bangor ME
  • PRE-PROPOSAL CONFERENCE January 15 January 30,
    2008
  • USPFO FOR MAINE
  • AUGUSTA, MAINE

3
INTRODUCTION
  • MAJ ROBERT CROWLEY Contracting Officer
  • SGM STEPHEN MOODY Contract Specialist
  • MR. ROBERT BUSCH Contract Support
  • LTC DAVID VASHON Base Civil Engineer
  • CPT PHILIP WINCHESTER Deputy BCE
  • MR. GLEN TOMPKINS Construction Inspector

4
SYNOPSIS
  • Remove and replace an existing Aircraft Apron,
    Taxi-lane and Refueling Hydrant System
  • Magnitude- 10 M to 25 M
  • A Firm-fixed Price Contract Will Be Awarded.
  • Award Will Be Unrestricted

5
SYNOPSIS
  • Notice Of Price Evaluation Preference For HUBZone
    Small Business Concerns Is Applicable
  • The Contract Will Be Awarded Using Best Value
    Selection Procedures
  • Evaluation Factors Price, Past Performance
    Technical

6
SOLICITATION, PLANS SPECIFICATIONS
  • On The Web
  • http//www.nationalguardcontracting.org/Ebs/Advert
    isedSolicitations.asp
  • Solicitation
  • Exhibits
  • Plans Specifications
  • Questions Answers Document
  • Amendments
  • Check Regularly Refresh Web Page

7
Invitation For Bid vs.Request For Proposal
  • IFB
  • Open Process
  • Public Bid Opening
  • Abstract Releasable
  • No Discussions
  • Only Price Considered
  • No Revisions
  • Additive Bid Items (ABI)
  • Award to Lowest Responsive/Responsible Bidder
  • RFP
  • Closed Process
  • No Public Opening
  • Limited Info at Award
  • Discussions Allowable
  • Past Performance and Other Factors Considered
    With Price
  • Revisions Possible
  • Options-No ABIs
  • Award Based on Best Value not a fast process-

8
CONTRACT PERIOD
Construction Period Is 180 Calendar Days After
Receiving The Notice To Proceed
9
DISCLAIMER The following is a brief
overview of the proposal requirements
  • Offerors Are Strongly Cautioned To Carefully
    Read The Requirements Of The Solicitation And
    Comply Accordingly

10
Important Reminder
  • The Government Intends To Award Without
    Discussion And There May Not Be A Chance For
    Discussions, Corrections, Or Revised Proposals

11
WHAT YOU MUST SUBMIT
  • Section 00110 Of The RFP Details The Required
    Information And Format For The Proposal
  • 2 Binders Are Required
  • Binder 1 includes VOL 1 Price Proposal, pro
    forma documents SB SubcontractingPlan
  • Binder 2 includes VOL 2 Past/Present
    Performance VOL 3 -Technical

12
Volume 1- Price/Cost
  • Offeror portion of SF1442
  • Section 00010 Pricing Info
  • Section 00600 Representations and
    Certifications (RC)
  • Complete RCs in ORCA on the web
  • Complete and Return DoD RCs in Section 0600
  • Complete Include Supplemental Information Form
  • Subcontracting Plan if required (large business
    only)

13
Volume 2 Past Performance NO PRICES/COST IN THIS
VOLUME
  • Exhibit A- Part 1- Performance Relevancy
    Questionnaires Use Exhibit Format!
  • Complete 5 For Relevant Contracts Completed Or
    Substantially Completed In The Last Five Years
  • Exhibit A-Part 2 Complete One (1)
  • Send Evaluation Questionnaires (Exhibit C) For
    The Exhibit A Projects
  • Do This Early Must Be to KO NLT Closing Date

14
Volume 2 Past Performance Continued
  • If You Do Not Have Relevant Past Performance And
    Are Using Experience Of Key Personnel,
    Predecessor Companies Or Subcontractors To Obtain
    This Ensure You Clearly State This In The
    Proposal
  • To Be Considered Subcontractor Must Complete a
    Consent Form - Exhibit B

15
Volume 3 - Technical
  • Design mix test results
  • Passing results required for both tests for both
    coarse aggregates and fine aggregates in order to
    be considered
  • Contract Schedule
  • Remember to include both CPM schedule and
    narrative

16
Proposal Due Dates
  • Proposal Due 1300 Hours (100 P.M.), on 25
    February 2008
  • Proposal Must Be Signed By Officer Of Your
    Company
  • No Facsimile Or Electronic Offers
  • Reference Questionnaires (Exhibit C) Are Also Due
    By This Time And Date
  • Send Reference Questionnaires Out As Soon As
    Possible
  • References Return directly to KO Via Mail, Fax Or
    E-mail

17
Exhibits
  • Exhibit A - Performance Relevancy Questionnaire
  • A Part 1 (5), A Part 2 (1)
  • Exhibit B - Subcontractor/Team Key Personnel
    Information and Consent Form- if applicable
  • Exhibit C - Past Performance Letter and
    Questionnaire (Send out to References)

18
Exhibits
  • Exhibit D Reserved
  • Exhibit E - Proposal Volume Contents Aid
  • Exhibit F - Proposal Inquiry Form

19
Proposal Evaluation
  • Process Is Detailed In RFP Section 00120
  • Carefully Review Section 00120 When Preparing
    Proposal
  • Comply With Section 00100 And 00110 Requirements
  • Failure To Furnish A Complete Proposal May Result
    In Elimination From Consideration

20
Best Value
Best Value Is Defined As An Award Based On The
Greatest Overall Benefit In Response To The
Requirement. Award Is Based On Price And Other
Non-cost Related Factors.
21
Award
  • The Contractor Whose Proposal Provides
  • The Best Value To The Government
  • Past Performance and Technical Considerations,
    when combined, are approximately equal to price
  • The Best Value May Not Be The Lowest
  • Price

22
Important Reminders
  • Submit A Complete Proposal In Accordance With
    Instructions Use Formats Provided
  • Award Without Discussions Is Intended, You May
    Not Have An Opportunity To Correct Or Revise
    Proposal

23
Important Reminders
  • When Using A Subcontractor To Obtain/Enhance
    Relevancy Provide Subcontractor/Team Key
    Personnel Information and Consent Form, Exhibit
    B, Or The Information Will Not Be Considered
  • Award In This Process Does Not Necessarily Mean
    The Lowest Price Wins

24
How Questions Will Be Handled
  • Questions Must Be Submitted On Exhibit F Via
    Email To stephen.e.moody_at_us.army.mil and
    robert.busch_at_mebngr.ang.af.mil (BOTH)
  • Submit Questions NLT COB 7 calendar days prior to
    closing date
  • Questions received after that time may be held
    and addressed after RFP closing with those
    Offerors determined to be in the competitive
    range if discussions are deemed necessary
  • Do Not Call Technical Personnel Or AE- This Will
    Delay Getting An Answer


25
Answers To Questions
  • All Questions, On A Non-Attribution Basis, And
    The Answers Will Be Posted To The Web Site
  • http//www.nationalguardcontracting.org/Ebs/Adver
    tisedSolicitations.asp
  • If Necessary Addendums, Issued By An Amendment,
    Will Also Be Posted
  • Check Web Site Regularly And Dont Forget To
    Refresh Web Page

26
Helpful Websites
  • http//www.nationalguardcontracting.org/
  • www.ccr.gov/
  • https//www.fedteds.gov/
  • http//orca.bpn.gov/
  • http//www.gpo.gov/davisbacon/all states.html

27
Questions
  • Break Follows This Briefing
Write a Comment
User Comments (0)
About PowerShow.com