Title: Preproposal Conference
1Preproposal Conference
- W912JD-08-R-0001
- REPLACE AIRCRAFT PARKING APRON PHASES 1 AND 2
2CONSTRUCT THIS PROJECT AT Bangor ANG Base,
Bangor ME
- PRE-PROPOSAL CONFERENCE January 15 January 30,
2008 - USPFO FOR MAINE
- AUGUSTA, MAINE
3INTRODUCTION
- MAJ ROBERT CROWLEY Contracting Officer
- SGM STEPHEN MOODY Contract Specialist
- MR. ROBERT BUSCH Contract Support
- LTC DAVID VASHON Base Civil Engineer
- CPT PHILIP WINCHESTER Deputy BCE
- MR. GLEN TOMPKINS Construction Inspector
4SYNOPSIS
- Remove and replace an existing Aircraft Apron,
Taxi-lane and Refueling Hydrant System - Magnitude- 10 M to 25 M
- A Firm-fixed Price Contract Will Be Awarded.
- Award Will Be Unrestricted
5SYNOPSIS
- Notice Of Price Evaluation Preference For HUBZone
Small Business Concerns Is Applicable - The Contract Will Be Awarded Using Best Value
Selection Procedures - Evaluation Factors Price, Past Performance
Technical
6SOLICITATION, PLANS SPECIFICATIONS
- On The Web
- http//www.nationalguardcontracting.org/Ebs/Advert
isedSolicitations.asp - Solicitation
- Exhibits
- Plans Specifications
- Questions Answers Document
- Amendments
- Check Regularly Refresh Web Page
7Invitation For Bid vs.Request For Proposal
- IFB
- Open Process
- Public Bid Opening
- Abstract Releasable
- No Discussions
- Only Price Considered
- No Revisions
- Additive Bid Items (ABI)
- Award to Lowest Responsive/Responsible Bidder
- RFP
- Closed Process
- No Public Opening
- Limited Info at Award
- Discussions Allowable
- Past Performance and Other Factors Considered
With Price - Revisions Possible
- Options-No ABIs
- Award Based on Best Value not a fast process-
8CONTRACT PERIOD
Construction Period Is 180 Calendar Days After
Receiving The Notice To Proceed
9DISCLAIMER The following is a brief
overview of the proposal requirements
- Offerors Are Strongly Cautioned To Carefully
Read The Requirements Of The Solicitation And
Comply Accordingly
10 Important Reminder
- The Government Intends To Award Without
Discussion And There May Not Be A Chance For
Discussions, Corrections, Or Revised Proposals
11WHAT YOU MUST SUBMIT
- Section 00110 Of The RFP Details The Required
Information And Format For The Proposal - 2 Binders Are Required
- Binder 1 includes VOL 1 Price Proposal, pro
forma documents SB SubcontractingPlan - Binder 2 includes VOL 2 Past/Present
Performance VOL 3 -Technical
12Volume 1- Price/Cost
- Offeror portion of SF1442
- Section 00010 Pricing Info
- Section 00600 Representations and
Certifications (RC) - Complete RCs in ORCA on the web
- Complete and Return DoD RCs in Section 0600
- Complete Include Supplemental Information Form
- Subcontracting Plan if required (large business
only)
13Volume 2 Past Performance NO PRICES/COST IN THIS
VOLUME
- Exhibit A- Part 1- Performance Relevancy
Questionnaires Use Exhibit Format! - Complete 5 For Relevant Contracts Completed Or
Substantially Completed In The Last Five Years - Exhibit A-Part 2 Complete One (1)
- Send Evaluation Questionnaires (Exhibit C) For
The Exhibit A Projects - Do This Early Must Be to KO NLT Closing Date
14Volume 2 Past Performance Continued
- If You Do Not Have Relevant Past Performance And
Are Using Experience Of Key Personnel,
Predecessor Companies Or Subcontractors To Obtain
This Ensure You Clearly State This In The
Proposal - To Be Considered Subcontractor Must Complete a
Consent Form - Exhibit B
15Volume 3 - Technical
- Design mix test results
- Passing results required for both tests for both
coarse aggregates and fine aggregates in order to
be considered - Contract Schedule
- Remember to include both CPM schedule and
narrative
16Proposal Due Dates
- Proposal Due 1300 Hours (100 P.M.), on 25
February 2008 - Proposal Must Be Signed By Officer Of Your
Company - No Facsimile Or Electronic Offers
- Reference Questionnaires (Exhibit C) Are Also Due
By This Time And Date - Send Reference Questionnaires Out As Soon As
Possible - References Return directly to KO Via Mail, Fax Or
E-mail
17Exhibits
- Exhibit A - Performance Relevancy Questionnaire
- A Part 1 (5), A Part 2 (1)
- Exhibit B - Subcontractor/Team Key Personnel
Information and Consent Form- if applicable - Exhibit C - Past Performance Letter and
Questionnaire (Send out to References)
18Exhibits
- Exhibit D Reserved
- Exhibit E - Proposal Volume Contents Aid
- Exhibit F - Proposal Inquiry Form
19Proposal Evaluation
- Process Is Detailed In RFP Section 00120
- Carefully Review Section 00120 When Preparing
Proposal - Comply With Section 00100 And 00110 Requirements
- Failure To Furnish A Complete Proposal May Result
In Elimination From Consideration
20Best Value
Best Value Is Defined As An Award Based On The
Greatest Overall Benefit In Response To The
Requirement. Award Is Based On Price And Other
Non-cost Related Factors.
21Award
- The Contractor Whose Proposal Provides
- The Best Value To The Government
- Past Performance and Technical Considerations,
when combined, are approximately equal to price - The Best Value May Not Be The Lowest
- Price
22Important Reminders
- Submit A Complete Proposal In Accordance With
Instructions Use Formats Provided - Award Without Discussions Is Intended, You May
Not Have An Opportunity To Correct Or Revise
Proposal
23Important Reminders
- When Using A Subcontractor To Obtain/Enhance
Relevancy Provide Subcontractor/Team Key
Personnel Information and Consent Form, Exhibit
B, Or The Information Will Not Be Considered - Award In This Process Does Not Necessarily Mean
The Lowest Price Wins
24How Questions Will Be Handled
- Questions Must Be Submitted On Exhibit F Via
Email To stephen.e.moody_at_us.army.mil and
robert.busch_at_mebngr.ang.af.mil (BOTH) - Submit Questions NLT COB 7 calendar days prior to
closing date - Questions received after that time may be held
and addressed after RFP closing with those
Offerors determined to be in the competitive
range if discussions are deemed necessary - Do Not Call Technical Personnel Or AE- This Will
Delay Getting An Answer
25Answers To Questions
- All Questions, On A Non-Attribution Basis, And
The Answers Will Be Posted To The Web Site - http//www.nationalguardcontracting.org/Ebs/Adver
tisedSolicitations.asp - If Necessary Addendums, Issued By An Amendment,
Will Also Be Posted - Check Web Site Regularly And Dont Forget To
Refresh Web Page
26Helpful Websites
- http//www.nationalguardcontracting.org/
- www.ccr.gov/
- https//www.fedteds.gov/
- http//orca.bpn.gov/
- http//www.gpo.gov/davisbacon/all states.html
27Questions
- Break Follows This Briefing