Pathfinder Working Group - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Pathfinder Working Group

Description:

Terms of reference and objectives of Pathfinder Working Group. ... Not exhaustive - other options inc. Ceasing Capacity, new 21C products etc. ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 29
Provided by: annette68
Category:

less

Transcript and Presenter's Notes

Title: Pathfinder Working Group


1
Pathfinder Working Group
  • BT Centre Showcase,
  • Registration 9.45 am
  • Start time 10.00 am

2
Pathfinder Working Group - Agenda
  • .Introductions
  • .Terms of reference and objectives of Pathfinder
    Working Group
  • .Cardiff - The facts of Interconnection 
  • .BTs view of technical issues/risks inherent in
    a hybrid interconnection model during Pathfinder
  • .Proposed transfer methodology from DLE to NGS
  • .Requirements for Pathfinder Programme - a free
    form brainstorming session designed to deliver a
    set of requirements specific to Pathfinder.
  • .AOB
  • Customer Communication Plan
  • TSG Update

3
Pathfinder Working Group
  • Working Group Terms of Reference
  • Keith Fowler - Pathfinder Programme Manager.

4
Pathfinder Working Group
  • Membership
  • Industry representatives and BT Wholesale
    (co-chair arrangement)
  • Proposed Terms of Reference
  • Phase 1 (now until June 05)
  • Agree to conditions for collaboration during the
    Pathfinder period (Out of service Oct 05 Dec
    05, In service Jan 06 March 06)
  • Capture Pathfinder Requirements from BTW
    Customers (close by 28-Feb) This has already
    begun through one-on-one calls
  • Agree to measurement points and reporting
    structure to provide all Pathfinder participants
    equal access to experiences and information
  • Phase 2 (July 05 April 06)
  • Issue of System Alternation Notices for Cardiff
    DLEs
  • Trial Industry collaboration in the migration of
  • Interconnect (target beginning migration Oct 05)
  • End Customers (mass migration Jan-Mar 06)
  • Review of experiences and results
  • Working Group Scope
  • All matters relating to migration of interconnect
    arrangements and consumer and business customers
    to a 21CN environment, while not overlapping
    other working groups.
  • Meeting Frequency
  • Monthly or more frequently as required

5
Pathfinder Working Group
  • Within Scope of Pathfinder Working Group
  • Determine criteria for collaboration during this
    period
  • Issue of System Alteration Notifications in July
  • Defined methodology for movement of end customer
    lines
  • Defined methodology for movement of services
  • Defined additional reporting requirements to test
    effectiveness of trial.
  • Outside Scope of Pathfinder Working Group
  • An agreed technical arrangement to enable DLE
    closure (Interconnect Working Group)
  • Agreed commercial arrangements for rearranging
    interconnects
  • Charging Principles (Interconnect Working Group)
  • Contract Alterations (Standard Contracts Forum)
  • Future interconnect (IP, etc.) (Interconnect
    Working Group)
  • LLU (Broadband and LLU Working Group)
  • Any other workgroup themes

6
Pathfinder Working Group
  • Cardiff The facts of Interconnection
  • Mark Ward, Head of Interconnect Numbering
    Services

7
Cardiff Pathfinder area - Current Interconnect
Arrangements
  • 9 impacted DLEs - 7 in Cardiff, plus Bridgend
    and Pontypridd
  • Cardiff DLE units CF/TY, CF/UC, CF/UD, CF/UE,
    CF/UF, CF/UG, CF/UL
  • Bridgend DLE unit BNP/DA Pontypridd DLE unit
    PN/DA
  • All Cardiff DLE units are co-located with
    Cardiff Iolite NGS
  • 7 impacted Altnets
  • 80 of circuits from 3 Altnets
  • Volumes are for all interconnect E1s, including
    FRIACO

8
Pathfinder Working Group
  • BTs view of technical issues/risks inherent in a
    hybrid interconnection model during Pathfinder

9
Risks and Issues associated with Interconnection
arrangements and Pathfinder.
  • Risks-
  • Non Movement of CP DLE Capacity prior to
    Pathfinder could result in-
  • Increased risk of call routing errors due to a
    complex data set
  • (21CN legacy network CPs network)
  • Increased risk of QoS issues e.g. call routing
    errors over-used capacity
  • Any Operational issues resulting would cause
    increased manpower demands on both BT and CPs
  • Complication of eventual movement of Capacity
    prior to DLE closure.
  • Failure to fully test the full 21CN migration
    process and amend process if required

10
Risks and Issues associated with Interconnection
arrangements and Pathfinder.
  • Issues
  • Known issues include-
  • Billing in line with commercial offer - EBC?
  • Some unsupported products post end-customer
    transfer e.g RBWF
  • Trial Contract
  • CPS SAD calls
  • Prove designs for continuity of Interconnect
    products to/from end customers.
  • Fall Back arrangements and criteria.
  • Availability of new 21C Interconnect Products

11
Mitigating Risks
  • Goal is to migrate CP Interconnect prior to DLE
    end-user migration
  • Provide sufficient time to assure stability for
    all
  • Avoid complex routing (21CN - NGS -CP)
  • Avoid need to replicate legacy/PSTN routings and
    data structures
  • Minimize impact on perceived QoS (complex call
    routing/tromboning)
  • Can migrate CP circuits over time without need
    for whole DLE at once migration
  • Disengage CP circuits from actual DLE closures
  • Pathfinder offers the opportunity to collaborate
    on the full migration process
  • Trial methodology for moving CP Interconnect
    circuits over time (not directly tied to mass
    migration schedule)
  • Trial methodology for migrating end-users whole
    DLE at once
  • Provide feedback to improve processes prior to
    main 21C roll-out

12
Pathfinder Working Group
  • Proposed Transfer Methodology from DLE to NGS

13
Legacy TDM Support - Transfer Engineering
Proposals
  • Aims -
  • To de-risk the transfers by use of existing NGS
    switches and network routings.
  • To provide separation of agreed transfer
    activities from progress on 21C build and DLE
    closures.
  • To enable balanced workload for all.
  • Scenarios -
  • 4 that will apply in most circumstances - mix
    and match.
  • Last 2 may apply to balance NGS capacity
  • Not exhaustive - other options inc. Ceasing
    Capacity, new 21C products etc.
  • Not prescriptive - subject to bi-lateral
    agreement with each individual customer.

14
DLE SITE
?
NGS
2 1 C N
DLE 2
M G W
METRO NODE
3 E1s
CP Switch
13 E1s
NGS SITE
BT Capacity
CP Capacity
Figure 1a - Configuration 1 - ISI Direct to
DLE and NGS Sites No Spare NGS CP Route Capacity
- Interconnect Scenario Before Transfer
15
DLE SITE
?
NGS
2 1 C N
DLE 2
M G W
METRO NODE
3 E1s
3 E1s
CP Switch
13 E1s
NGS SITE
BT Capacity
CP Capacity
Figure 1b - Configuration 1 - ISI Direct to
DLE and NGS Sites No Spare NGS CP Route Capacity
- Interconnect Scenario After Transfer
16
NGS
2 1 C N
M G W
METRO NODE
13 E1s
?
CP Switch
DLE 2
3 E1s
IEC
DLE SITE
NGS SITE
BT Capacity
CP Capacity
Figure 3a - Configuration 3 - ISI Direct to
NGS Site with IEC to DLE Site No Spare NGS CP
Route Capacity - Interconnect Scenario Before
Transfer
17
NGS
2 1 C N
M G W
METRO NODE
13 E1s
?
CP Switch
DLE 2
3 E1s
DLE SITE
NGS SITE
BT Capacity
CP Capacity
Figure 3b - Configuration 3 - ISI Direct to
NGS Site with IEC to DLE Site No Spare NGS CP
Route Capacity - Interconnect Scenario After
Transfer
18
DLE SITE
?
NGS
DLE 2
2 1 C N
M G W
METRO NODE
NON PARENT NGS SITE
CP Switch
NGS
3 E1s
BT Capacity
13 E1s
CP Capacity
IEC
PARENT NGS SITE
Figure 6a - Configuration 6 - ISI Direct to NGS
Site with IEC to DLE Site No CP Route to Non
Parent NGS - Interconnect Scenario Before Transfer
19
New Route (if not already existing)
DLE SITE
?
NGS
DLE 2
2 1 C N
M G W
METRO NODE
NON PARENT NGS SITE
CP Switch
NGS
3 E1s
13 E1s
BT Capacity
CP Capacity
3 E1s
PARENT NGS SITE
Figure 6b - Configuration 6 - ISI Direct to NGS
Site with IEC to DLE Site No CP Route to Non
Parent NGS - Interconnect Scenario After Transfer
20
  • Requirements Capture for Pathfinder Programme.

21
Pathfinder Working Group
  • Within Scope of Pathfinder Working Group
  • Determine criteria for collaboration during this
    period
  • Issue of System Alteration Notifications in July
  • Defined methodology for movement of end customer
    lines
  • Defined methodology for movement of services
  • Defined additional reporting requirements to test
    effectiveness of trial.
  • Outside Scope of Pathfinder Working Group
  • An agreed technical arrangement to enable DLE
    closure (Interconnect Working Group)
  • Agreed commercial arrangements for rearranging
    interconnects
  • Charging Principles (Interconnect Working Group)
  • Contract Alterations (Standard Contracts Forum)
  • Future interconnect (IP, etc.) (Interconnect
    Working Group)
  • LLU (Broadband and LLU Working Group)
  • Any other workgroup themes

22
  • ADDITIONAL TRANSFER ENGINEERING SLIDES FOR
    INFORMATION ONLY

23
DLE SITE
?
NGS
2 1 C N
DLE 2
M G W
METRO NODE
3 E1s
CP Switch
13 E1s 10 used for BH traffic
NGS SITE
BT Capacity
CP Capacity
Figure 2a - Configuration 2 - ISI Direct to
DLE and NGS Sites Spare NGS CP Route Capacity -
Interconnect Scenario Before Transfer
24
DLE SITE
?
NGS
2 1 C N
DLE 2
M G W
METRO NODE
CP Switch
3 E1s
10 E1s
NGS SITE
BT Capacity
CP Capacity
Figure 2b - Configuration 2 - ISI Direct to
DLE and NGS Sites Spare NGS CP Route Capacity -
Interconnect Scenario After Transfer
25
NGS
2 1 C N
M G W
METRO NODE
13 E1s
10 used for BH traffic
?
CP Switch
DLE 2
3 E1s
IEC
DLE SITE
NGS SITE
BT Capacity
CP Capacity
Figure 4a - Configuration 4 - ISI Direct to NGS
Site with IEC to DLE Site Spare NGS CP Route
Capacity - Interconnect Scenario Before Transfer
26
NGS
2 1 C N
M G W
METRO NODE
10 E1s
?
3 E1s
CP Switch
DLE 2
DLE SITE
NGS SITE
BT Capacity
CP Capacity
Figure 4b - Configuration 4 - ISI Direct to NGS
Site with IEC to DLE Site Spare NGS CP Route
Capacity - Interconnect Scenario After Transfer
27
DLE SITE
?
NGS
DLE 2
3 E1s
2 1 C N
NON PARENT NGS SITE
M G W
METRO NODE
CP
NGS
13 E1s
PARENT NGS SITE
BT Capacity
CP Capacity
Figure 5a - Configuration 5 - ISI Direct to DLE
and NGS Sites No CP Route to Non Parent NGS -
Interconnect Scenario Before Transfer
28
DLE SITE
?
NGS
DLE 2
3 E1s
3 E1s
2 1 C N
NON PARENT NGS SITE
M G W
METRO NODE
CP
NGS
13 E1s
BT provided (funded)
CP provided (funded)
PARENT NGS SITE
Figure 5b - Configuration 5 - ISI Direct to DLE
and NGS Sites No CP Route to Non Parent NGS -
Interconnect Scenario After Transfer
Write a Comment
User Comments (0)
About PowerShow.com