Links Identified for Preparation of Feasibility Reports - PowerPoint PPT Presentation

1 / 41
About This Presentation
Title:

Links Identified for Preparation of Feasibility Reports

Description:

Links Identified for Preparation of Feasibility Reports – PowerPoint PPT presentation

Number of Views:163
Avg rating:3.0/5.0
Slides: 42
Provided by: a15251
Category:

less

Transcript and Presenter's Notes

Title: Links Identified for Preparation of Feasibility Reports


1
(No Transcript)
2
THE NATONAL WATER DEVELOPMENT AGEENCY is a
society, fully funded by the Central
Government, The structure of NWDA
includes The Society (The General Body)
presided by the Minister(WR) The Governing Body
chaired by the Secretary(WR) The Technical
Advisory Committee chaired by Chairman(CWC) The
Secretariat headed by the Director General THE
STATE GOVERNMENTS PARTICIPATE IN ALL BODIES
3
ABOUT NWDA
NWDA was established to study the National
Perspective Plan (for Water Development) Initially
, it worked only on the peninsular
component Later, the work of the Himalayan
component was added. The mandate of NWDA is to
prepare the feasibility reports
4
Links Identified for Preparation of Feasibility
Reports
PENINSULAR COMPONENT
  • 1. Mahanadi (Manibhadra) Godavari
    (Dowlaiswaram)
  • 2. Godavari (Inchampalli) Krishna
    (Nagarjunasagar)
  • 3. Godavari (Inchampalli) Krishna
    (Pulichintala)
  • 4. Godavari (Polavaram) Krishna (Vijayawada)
  • 5. Krishna (Almatti) Pennar
  • 6. Krishna (Srisailam) Pennar
  • 7. Krishna (Nagarjunasagar) Pennar (Somasila)
  • 8. Pennar (Somasila) Cauvery (Grand Anicut)
  • 9. Cauvery (Kattalai) Vaigai Gundar
  • 10.Ken Betwa
  • 11.Parbati Kalisindh Chambal
  • 12.Par Tapi Narmada
  • 13.Damanganga Pinjal
  • 14.Bedti Varda
  • 15.Netravati Hemavati
  • 16.Pamba Achankovil Vaippar
  • FR Completed
  • Work can be started after receipt of consent
    from Govt. of Karnataka

5
Links Identified for Preparation of Feasibility
Reports
  • 1.Mahanadi (Manibhadra) Godavari (Dowlaiswaram)
    .
  • Link Length 932 Km

6
Links Identified for Preparation of Feasibility
Reports
  • 2.Godavari (Inchampalli) Krishna
    (Nagarjunasagar) .
  • Link Length 299 Km

7
Links Identified for Preparation of Feasibility
Reports
  • 3.Godavari (Inchampalli) Krishna (Pulichintala)
    .
  • Link Length 419 Km

8
Links Identified for Preparation of Feasibility
Reports
  • 4.Godavari (Polavaram) Krishna (Vijayawada) .
  • Link Length 174 Km

9
Links Identified for Preparation of Feasibility
Reports
  • 5.Krishna (Almatti) Pennar .
  • Link Length 564 Km

10
Links Identified for Preparation of Feasibility
Reports
  • 6.Krishna (Srisailam) Pennar .
  • Link Length 203 Km

11
Links Identified for Preparation of Feasibility
Reports
  • 7.Krishna (Nagarjunasagar) Pennar (Somasila)
    .
  • Link Length 394 Km

12
Links Identified for Preparation of Feasibility
Reports
  • 8.Pennar (Somasila) Cauvery (Grand Anicut) .
  • Link Length 538 Km

13
Links Identified for Preparation of Feasibility
Reports
  • 9.Cauvery (Kattalai) Vaigai Gundar .
  • Link Length 250 Km

14
Links Identified for Preparation of Feasibility
Reports
  • 10.Ken Betwa .
  • Link Length 231 Km

15
Links Identified for Preparation of Feasibility
Reports
  • 11.Parbati Kalisindh Chambal .
  • Link Length 243 Km

16
Links Identified for Preparation of Feasibility
Reports
  • 12. Par Tapi Narmada .
  • Link Length 401 Km

17
Links Identified for Preparation of Feasibility
Reports
  • 13.Damanganga Pinjal .
  • Link Length 42 Km

18
Links Identified for Preparation of Feasibility
Reports
  • 14.Bedti Varda .
  • Link Length 23 Km

19
Links Identified for Preparation of Feasibility
Reports
  • 15.Netravati Hemavati .
  • Link Length 11 Km

20
Links Identified for Preparation of Feasibility
Reports
  • 16.Pamba Achankovil Vaippar .
  • Link Length 51 Km

21
Links Identified for Preparation of Feasibility
Reports
HIMALAYAN COMPONENT
  • 1. Kosi Mechi
  • 2. Kosi Ghagra
  • 3. Gandak Ganga
  • 4. Ghagra Yamuna
  • 5. Sarda Yamuna
  • 6. Yamuna Rajasthan
  • 7. Rajasthan Sabarmati
  • 8. Chunar - Sone Barrage
  • 9. Sone Dam Southern Tributaries of Ganga
  • 10. Manas Sankosh - Tista - Ganga
  • 11. Jogighopa Tista Farakka (Alternate)
  • 12. Farakka Sunderbans
  • 13. Ganga (Farakka) Damodar Subernarekha
  • 14. Subernarekha Mahanadi
  • FR Completed

22
Links Identified for Preparation of Feasibility
Reports
  • 1.Kosi Mechi .
  • Link Length 113 Km

23
Links Identified for Preparation of Feasibility
Reports
  • 2. Kosi Ghagra .
  • Link Length 429 Km

24
Links Identified for Preparation of Feasibility
Reports
  • 3. Gandak Ganga .
  • Link Length 533 Km

25
Links Identified for Preparation of Feasibility
Reports
  • 4. Ghagra Yamuna .
  • Link Length 431 Km

26
Links Identified for Preparation of Feasibility
Reports
  • 5. Sarda Yamuna .
  • Link Length 370 Km

27
Links Identified for Preparation of Feasibility
Reports
  • 6. Yamuna Rajasthan .
  • Link Length 698 Km

28
Links Identified for Preparation of Feasibility
Reports
  • 7. Rajasthan Sabarmati .
  • Link Length 767 Km

29
Links Identified for Preparation of Feasibility
Reports
  • 8. Chunar- Sone Barrage .
  • Link Length 149 Km

30
Links Identified for Preparation of Feasibility
Reports
  • 9. Sone Dam Southern Tributaries of Ganga .
  • Link Length 339 Km

31
Links Identified for Preparation of Feasibility
Reports
  • 10. Manas Sankosh - Tista Ganga.
  • Link Length 457 Km

32
Links Identified for Preparation of Feasibility
Reports
  • 11. Jogighopa Tista Farakka.
  • (Alternate)
  • Link Length 441 Km

33
Links Identified for Preparation of Feasibility
Reports
  • 12. Farakka Sunderbans .
  • Link Length 604 Km

34
Links Identified for Preparation of Feasibility
Reports
  • 13. Ganga (Farakka) Damodar Subernarekha .
  • Link Length 395 Km

35
Links Identified for Preparation of Feasibility
Reports
  • 14. Subernarekha Mahanadi .
  • Link Length 373 Km

36
NWDA prepares the following types of reports
Water Balance ReportsThese estimate demands and
availability at salient points Pre-feasibility
Reports These make a desk study of the
proposal. Feasibility Reports These improve the
studies after surveys, soil and foundation
investigations, preliminary designs, etc.
Economics , environmental impacts, etc. are also
studied.
37
EXSISTING INTERBASIN TRANFERS
  • USA, CANADA, MEXICO, SRI LANKA,
  • CHINA, KAZAKISTAN, and INDIA
  • are some of the countries who have
    implemented interbasin transfers.
  • These,by 1978, were transferring more than
  • 300 km3, annually.

38
EXSSISTING INTERBASIN TRANFERS IN INDIA
  • Kurnnol Cuddapha canal
  • Tungabhadra high level canal
  • Perriyar Vaigai transfer
  • Telugu Ganga project
  • Bhakra waters for Delhi
  • Rajasthan canal
  • Narmada (sardar Sarovar) canal

39
BROAD OBJECTIVS OF INDIAs NATIONAL ILR PROPOSALS
THE MENU
  • Self sufficiency in food
  • Equitable distribution of waters
  • National economic efficiency
  • Balanced regional growth
  • Redistributive efficiency
  • Livelihood, poverty alleviation, drought
    mitigation

40
BROAD OBJECTIVS OF INDIAs NATIONAL ILR
PROPOSALSTHE SHIFTS
  • Earlier, food self sufficiency appeared to be the
    main driver
  • Food can be imported (virtual waters)
  • Now, livelihood and poverty issues appear more
    important drivers

41
INSTUMENTS NECESSARY TO FACILITATE WATER TRANFERS
  • Agreements amongst the states of the donor,
    en-route and receiving basins
  • Union legislation under entry 56 of the Union
    list
  • New water allocation policy and adjudication
  • A combination of these