Introduction to WP 8F - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Introduction to WP 8F

Description:

Peter Scheele, Germany, for the Chairman of WP 8F. SG 8 ... E-mail: Stephen.blust_at_cingular.com. WP 8F Vice-Chairman and. WG SERV Chairman. Mr. Kyu-Jin Wee ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 16
Provided by: Lang9
Category:

less

Transcript and Presenter's Notes

Title: Introduction to WP 8F


1
Introduction to WP 8F
SG 8 Seminar
2
SG 8 Seminar
WP 8F Chair/Vice-Chair
WP 8F Chairman Mr. Stephen Blust Cingular
Wireless Tel. 1 404 236 5924 E-mail
Stephen.blust_at_cingular.com
WP 8F Vice-Chairman and WG SERV Chairman Mr.
Kyu-Jin Wee Ministry of Information and
Communication, Republic of Korea Tel. 8 227
106 551 E-mail kjwee_at_rrl.go.kr
WP 8F Vice-Chairman and AH Workplan Chairman Mr.
Håkan Ohlsén Ericsson, Sweden Tel. 46 703 717
612 E-mail hakan.ohlsen_at_ericsson.com
Peter Scheele, Germany, for the Chairman of WP 8F
3
SG 8 Seminar
WP 8F Scope (1)
IMT-2000, defined by a set of interdependent ITU
Recommendations. International Mobile
Telecommunications-2000, also known as the Third
Generation Mobile Systems, fulfils the goal of
making anywhere, anytime communications a
reality.  As a strategic priority of ITU,
IMT-2000 provides a framework for world-wide
wireless access by considering a highly capable
wireless system of terrestrial and/or satellite
based networks.
  • WP 8F is responsible for the overall radio
    system aspects of IMT-
  • 2000 and beyond.
  • It has the prime responsibility within ITU-R
    Study Group 8 for
  • issues related to the terrestrial component
    of IMT-2000 and beyond

Peter Scheele, Germany, for the Chairman of WP 8F
4
SG 8 Seminar
WP 8F Scope (2)
  • It liaises with ITU-T on network-related
    standardisation activities of
  • IMT-2000 and beyond, and with ITU-D in
    relation to the application
  • of IMT-2000 in developing countries.
  • It maintains strong cooperative efforts with
    external organizations
  • and defined standards development
    organisations (SDOs).
  • It works closely with Working Party 8D on
    issues related to the
  • satellite component of IMT-2000 and beyond.
  • It is the lead group for the overall
    maintenance of existing and
  • development of new Recommendations on
    IMT-2000, collaborating
  • with Working Party 8D on the satellite
    elements.

Peter Scheele, Germany, for the Chairman of WP 8F
5
SG 8 Seminar
WP 8F Scope (3)
  • WP 8F constructs the future of IMT-2000 and
    beyond by looking at a
  • long-term vision and coordinating this with
    spectrum needs.
  • WP 8F considers these broad areas of impact in
    their work 
  • the needs of the evolving marketplace for
    future wireless communications,
  • the technologies required to fulfill those
    needs,
  • the spectrum which is the natural resource of
    wireless,
  • other issues associated with the world-wide
    advancement of IMT-2000 systems. 
  • A key element is the considerations of the
    needs of developing
  • countries and how IMT-2000 can
    appropriately be tuned to meet
  • those needs.

Peter Scheele, Germany, for the Chairman of WP 8F
6
SG 8 Seminar
WP 8F Scope (4)
  • WP 8F provides a focal point for
    considerations on spectrum
  • implications of the future development of
    IMT-2000. 
  • WP 8F is providing clarification of spectrum
    requirements as input
  • to WRCs, considering spectrum requirements
    and recognizing the
  • marketplace and the future development of
    systems beyond IMT-
  • 2000.
  • WP 8F works closely with the ITU-T Special
    Study Group on IMT-
  • 2000 to ensure that IMT-2000 is considered
    from a coordinated
  • system perspective. 

Peter Scheele, Germany, for the Chairman of WP 8F
7
SG 8 Seminar
WP 8F Structure
SERV
TECH
Working Groups
Ad-Hoc Workplan
Peter Scheele, Germany, for the Chairman of WP 8F
8
SG 8 Seminar
WP 8F Work Plan
2002 2003
2004 2005
2006
2007 2008 2009 2010 2011 2012

WRC-03
WRC-07
WRC
WP 8F WRC preparations
  • Draft text for WRC-07
  • Spectrum estimate
  • Candidate freq ranges
  • When
  • What for / name
  • Methods to satisfy agenda
  • Footnote text
  • Pooled / shared / paired / etc. ?

Future Services / Market Analysis
Future Spectrum Calculation Methodology
Future Spectrum Estimate
Future Technology Assumptions
Spectrum Survey
Sharing Studies
Radio Aspects
WP 8F other spectrum- related activities
2.5 GHz Spectrum Plan
Peter Scheele, Germany, for the Chairman of WP 8F
9
SG 8 Seminar
WP 8F Meeting Schedule
WRC-07
Peter Scheele, Germany, for the Chairman of WP 8F
10
WP 8F web page
SG 8 Seminar
http//www.itu.int/ITU-R/study-groups/rsg8/rwp8f/i
ndex.asp
Peter Scheele, Germany, for the Chairman of WP 8F
11

SG 8 Seminar
Thank you
Peter Scheele, Germany, for the Chairman of WP 8F
12
Back Up
SG 8 Seminar
Peter Scheele, Germany, for the Chairman of WP 8F
13
SG 8 Seminar
WP 8F Structure
Peter Scheele, Germany, for the Chairman of WP 8F
14
SG 8 Seminar
WP 8F Structure
Peter Scheele, Germany, for the Chairman of WP 8F
15
SG 8 Seminar
WP 8F Structure
Peter Scheele, Germany, for the Chairman of WP 8F
Write a Comment
User Comments (0)
About PowerShow.com