Title: Continuous PM2'5 Monitoring Issues


1
Continuous PM2.5 Monitoring Issues
National Air Quality Conference, Portland Oregon,
April 6, 2008
2
U.S. PM Continuous Monitoring History
  • 1990
  • First PM10 automated equivalent methods approved.
  • 1997
  • PM2.5 NAAQS and monitoring rules
  • Classes of equivalency introduced however,
    specifics not included for class III (i.e.,
    continuous monitors)
  • First specific network requirements for PM2.5
    continuous monitors one per metropolitan areas
    over 1M people
  • 2001
  • CASAC Workshop on accommodating emerging
    technologies into routine air monitoring networks
  • 2002
  • Continuous Monitoring Implementation Plan
    developed and reviewed by CASAC
  • 2003
  • AIRNOW goes public with reports and forecasts
    using PM2.5 continuous monitoring data
  • 2006
  • EPA finalizes PM NAAQS and monitoring rules with
    several provisions for PM2.5 continuous monitors
  • 2008
  • March 12 - EPA-ORD approves Met One BAM 1020 as a
    PM2.5 FEM

3
PM2.5 Continuous Mass Sites by Method
TEOM
FDMS
BAM
NEPHELOMETER
4
Questions of the Day
  • What key provisions of the monitoring regulations
    impact continuous PM2.5 monitoring?
  • What flexibility will EPA provide in the
    reporting and use of data from newly deployed FEM
    monitors?
  • How will the data from FEMs and ARMs be used to
    calculate design values?
  • What are the recommended best practices for
    operating and maintaining continuous PM2.5
    monitors?
  • How can continuous PM2.5 monitors be used in
    support of emergencies and natural events?
  • How will State/local/Tribal agencies utilize
    approved monitors in their networks?

5
(No Transcript)
6
Regulations that affect PM2.5 continuous
monitoring(October 2006 revisions)
7
PM2.5 Class III FEM Testing Requirements
  • Vendor driven process submits application to
    U.S. EPA Office of Research and Development.
  • Three FRM samplers and three candidate FEM
    samplers for each test campaign.
  • Minimum of 23 valid sets of data per campaign (22
    25 hours in duration for each sample).
  • Precision requirements for FRM and candidate
    FEMs.
  • Total of 4 test sites (5 campaigns).
  • Criteria for multiplicative bias, additive bias,
    and correlation.
  • Candidate method must pass at each test
    location (seasons can be combined)

8
PM2.5 Class II and III Test Site Summary
9
Performance Criteria for Approval of Federal
Equivalent Methods (PM2.5)
10
PM2.5 and PM10-2.5 Class II and III Methods
Correlation Criteria
  • Correlation is r (not r2)
  • CCV is a measure of the spread of the sample
    concentrations

11
PM2.5 Federal Equivalent Method (FEM) Update
  • Met One BAM 1020 Approved
  • Two other instrument companies have stated they
    are testing candidate FEMs
  • EPA-OAQPS is making plans to develop supporting
    documentation for monitoring agencies who
    implement PM2.5 FEMs
  • Standard Operating Procedures based on expert use
    of the instruments
  • Let us know if you have advice/input on a FEM?

12
Approved Regional Methods (ARMs) for PM2.5
  • A PM2.5 continuous method approved for use within
    a State, local, or Tribal agency used to meet
    multiple monitoring objectives such as NAAQS, Air
    Quality Index, and forecast validation.
  • Allows agencies to optimize their PM2.5 network
    with well performing (and currently deployed)
    continuous methods that may not perform well in
    all required FEM testing regions.
  • Monitoring Agency-driven Testing Process
  • Uses basically the same performance criteria as
    Class III methods.
  • Testing occurs at subset of sites in the network
    within which its intended to be used.
  • Approvals
  • Initial ARM application approved through EPAs
    Office of Research Development.
  • Subsequent applications for method in another
    agencys network approved by EPA Regional Office.
  • All procedures (including proposed use of data
    transformations) must be fully described in
    Quality Assurance Program Plan accompanying ARM
    application.
  • OAQPS developed FEM/ARM tool to help with
    calculations

13
Implementation Issues with ARM Rule Language
  • Appendix C requires use of an inlet and
    separation device (if needed) that are already
    approved in either appendix L (PM2.5 FRM) or
    under Part 53 as an FRM or FEM.
  • OAQPS has determined that SCC (sharp cut cyclone)
    based test data from candidate ARM continuous
    monitors are not acceptable because the SCC was
    never an EPA-approved separator.
  • OGC shot down functional equivalence rationale.
  • Year of test data must be obtained using the VSCC
    (very sharp cut cyclone).
  • Doesnt effect nephelometer-based ARM
    applications.

14
Other Requirements
  • Daily operating schedules for design value
    monitors within 5 of 24-hour NAAQS
  • Instituted to account for 98th percentile bias in
    1-in-3 day FRM/FEM filter-based samplers
  • FEM or ARM monitors can be used to meet
    requirement
  • Continuous monitoring requirement (does not have
    to be FEM or ARM) one half of required monitors
    in addition to FRM/FEM filter-based samplers
  • Requirement is met with deployment of continuous
    FEM/ARM monitors

15
PM2.5 Continuous MethodsQA Requirements
16
Affect of adding FEMs to QA Programs
  • Will need to identify FEMs in Quality Assurance
    Project Plan
  • Regions may have different mechanisms for doing
    this
  • QA Requirements for FEM and FRM the same
  • Flow Rates (verification and audits)
  • Collocation
  • PEP

Dont confuse PM10 FEM requirements with PM2.5
FEM requirements
17
PM2.5 FEM Requirements (Yellow Area)
18
PEP Requirements
  • All sites (FEM and FRMs) added together then
  • lt 5 sites, 5 audits
  • gt 6 sites, 8 audits
  • Must have each method designation audited each
    year
  • All samplers/monitors audited within 6 year
    period
  • Bias calculations (AMP255) performed on Primary
    Quality Assurance Organization (PQAO) level of
    aggregation, but can probably revise to method
    designation level
  • Annual PEP report will break out by method
    designation

19
FEM Collocation Requirement (Table A-3 40 CFR
Part 58 App A)
Extreme Example- One PQAO with FRM monitors (one
method designation) and 3 FEM method designation
in Network
20
Deploying Continuous FEMs in the PM2.5
NetworkIssues for Monitoring Agencies to
Consider
For Discussions Purposes at NAQC Does not
represent EPA Policy
21
Transition Issues with Continuous PM2.5
FEMsLook Before You Leap
22
Suggested Transition Strategy for Continuous
PM2.5 FEMsFor Discussions Purposes at NAQC
Does not represent EPA Policy
  • Classify new FEMs initially as Special Purpose
    Monitors (SPMs)
  • However, cannot be used to meet minimum
    monitoring requirements if so classified
  • Data will not be used to augment FRMs for a
    limited test period
  • Deploy with collocated FRMs to meet or exceed QA
    requirements for collocation
  • Suggest multiple collocated sites with at least
    one site having a 1-in-3 day FRM
  • Data Reporting (following initial break-in
    period)
  • Suggest reporting FEM data as AQS parameter 88501
    Raw data during test period. Keeps test data
    out of 88101 bin used for NAAQS comparisons.
  • Could also apply a pre-existing FRM-like
    correction for AIRNOW reporting, if necessary,
    and to support parameter 88502 Acceptable PM2.5
    AQI
  • EPA will not prevent initial classification as
    SLAMS and reporting as 88101 if S/L/T and Region
    agree this is the right thing to do.
  • Review data carefully (raw FEM versus FRM) for
    agreement that meets Class III criteria over test
    period
  • Thennext slide..

Note all network modifications should be
reviewed by the Regional EPA Office and
documented in the Annual Monitoring Network Plan
23
Suggested Transition Strategy for Continuous
PM2.5 FEMsFor Discussions Purposes at NAQC
Does not represent EPA Policy
  • After 1 year period as an SPM, review data
    status
  • Agreement with FRM meets the Class III criteria
    -gt Reclassify FEM(s) to SLAMS (data in play for
    augmentation, FRM shut-downs are possible).
    Report FEM as parameter 88101 following SLAMS
    classification.
  • Agreement with FRM does not meet the Class III
    criteria but can be corrected
  • Maintain SPM status for up to a second year
  • Further investigate reason(s) for differences
    while continuing to report FEM data as 88501 and
    88502
  • Consider the ARM or user modification option for
    transforming data with ultimate goal of
    conversion to SLAMS
  • Agreement cannot be corrected to meet Class III
    criteria
  • Discuss issues with vendor, S/L/T colleagues
    using same FEM, and Regional Office
  • Consider discontinuing operation and rethink
    further purchases of this method

Note all network modifications should be
reviewed by the Regional EPA Office and
documented in the Annual Monitoring Network Plan
24
Questions?