The presentation of the investment project proposition: - PowerPoint PPT Presentation

About This Presentation
Title:

The presentation of the investment project proposition:

Description:

The international airport Priluki ... The operation of the reconstructed airdrome and air terminal for reception and departure of heavy cargo aircrafts, ... – PowerPoint PPT presentation

Number of Views:112
Avg rating:3.0/5.0
Slides: 15
Provided by: pyxi156
Category:

less

Transcript and Presenter's Notes

Title: The presentation of the investment project proposition:


1
The presentation of the investment project
proposition The international airport
Priluki Yalta June, 2009
?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
2
The subject -matter
  • The brief features of the project
  • 1.1 The geographical and technical advantages of
    the airport Priluki.
  • 1.2 The planned kinds of activity and principles
    of their organisation.
  • 1.3 The condition of the market and the
    competition.
  • 2. The current preconditions of the project
    realisation
  • 2.1 The real condition and potential technical
    possibilities of the airport Priluki".
  • 2.2 The government interaction and the basic
    permissive documentation.
  • 2.3 The potential consumers of the planned
    services.
  • 3. The necessary expenses for the project
    realisation.
  • 4. The pay-off period and the profit.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
3
1. The brief features of the project
  • 1.1 The geographical advantages of the airdrome
  • It is in 126 km on the northeast from Kiev.
  • It has convenient transport communications (near
    to Kharkov-Kiev state road).
  • It has the available infrastructure of Priluki
    (its the intown airdrome).
  • The technical advantages of the airdrome
  • The complex area 570 hectares.
  • The flight strip characteristics length 3 000
    m, width 80 m, the maximum weight of accepted
    aircrafts 600 t. There is a secondary unpaved
    runway.
  • There are the basic buildings providing
    functioning of airdrome, but they need
    reconstruction.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
4
1. The brief features of the project
  • 1.2 The planned kinds of activity
  • The operation of the reconstructed airdrome and
    air terminal for reception and departure of heavy
    cargo aircrafts, and also for their parking,
    refuelling and other service
  • The service delivery provision in transfer of
    cargoes by means of own cargo aircrafts (four
    Boeing 747-200F)
  • The usage of the new A class logistical terminal
    to keeping of different cargoes, and also their
    transfer to any point of Europe
  • The created hotel complex will provide
    comfortable stay of crews of aircrafts and other
    visitors of an air field complex.
  • The principles of the organisation of activity
  • The main principle is the activity division.
  • In this connection functioning of four
    independent enterprises is planned
  • The ?irport
  • The aviation company
  • The transport logistical company
  • The company on the hotel business organisation.
  • The activity of all substructures is supposed to
    be co-ordinated by means of the managing company.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
5
1. The brief features of the project
  • 1.3 The condition of the market and competition
  • The market of the cargo airports of Ukraine
    Nowardays there are no the airports just serving
    of cargo aviation traffics in Ukraine. In the
    central region of the country aviation cargo
    traffics occur through the international airport
    "Borispol" which is, first of all, the passenger
    airport. It has no possibility to serve all
    potential cargo traffics.
  • The market of cargo air transport The
    indicators of intensity of a cargo traffic are
    directly proportional to GDP indicators. Now they
    grow on 6 a year. In the long-term, according
    to Boeing and Airbus, this figure will only
    increase. By 2020 the share of cargo aircraft in
    the world volume of the air transport of cargoes
    will reach 60 .
  • The market of logistical services The increase
    in volumes of world trade causes requirement for
    warehouse of the higher class. This segment of
    the market is not still definitively completed.
    There is a backlash in 650 thousand square meters
    because of the lack of the warehouse real estate
    in the central region.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
6
2. The current preconditions
  • 2.1 The real condition of airport Priluki
  • The flight strip, the taxi ways and the parking
    places are in a satisfactory condition.
  • The lighting, radio and navigating equipments are
    absent.
  • The control tower and the basic components of a
    flight management system need the repair and the
    installation of the corresponding class
    equipment.
  • The modernisation is necessary for the refueling
    system.
  • The access ways, the railways and the highways
    need a general repair.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
7
2. The current preconditions
The schedule of carrying out of necessary repair
work to start functioning of the airdrome and the
air company The potential technical
possibilities After carrying out of all the
above mentioned works, the airdrome and air
terminal can receive certificates of the
international class airport. Then it may receive
the heavy cargo aircrafts with frequency of
take-off/landing each 2 minutes from any point
of the world.
?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
8
2. The current preconditions
  • 2.2 The government interaction
  • Nowadays the aviation base "Priluki" is on the
    books of
  • the Ministry of Defence of Ukraine. It is
    inactived and is protected
  • by the military divisions.
  • It is not used by plans of the Air Forces of
    Ukraine.
  • The basic permissive documentation
  • The reception of the rental contract of an air
    field complex is co-ordinated with the Ministry
    of Defence of Ukraine. The estimation of a
    property complex is made for the tender carrying
    out.
  • The airdrome and air terminal certification will
    be made in a current of 3 months after carrying
    out of all necessary works on reconstruction and
    equipment replacement.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
9
2. The current preconditions
  • The certification of the air company will be made
    in a current of 3 months after acquisition of
    planned aircrafts.
  • The reception of the project documentation will
    be made for building of the logistical terminal
    and a hotel complex after the reception of the
    rental contract of a property complex (the
    building prototype is the cargo terminal of
    International airport "Munich", Germany).
  • The schedule of reception of the basic permissive
    documentation to start functioning of airdrome
    and the aviation company

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
10
2. The current preconditions
  • 2.3 The potential consumers of the planned
    services.
  • There are some preliminary agreements with Asian
    suppliers of the goods which intend to use
    services of the aviation company in
    transportation of cargoes from Asia to Europe.
  • The airport can serve any cargo traffics arriving
    by means of charter aircrafts of any other air
    companies.
  • The A class logistical terminal can provide
    processing and long storage of any types of
    cargoes.

?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
11
3.The necessary expenses for the project
realisation
The below mentioned expenses are necessary to
start high-grade activity of the airport. It is
possible to invest separate directions of
activity. The sum of this investment is
specified as separate points of the list.
? The expense item The necessary expenses,
1 The reconstruction of the airdrome and the air terminal, the necessary equipment installation and the reception of the necessary certificates. 183 500 000
2 The acquisition of 4 aircrafts, the air company certification. 72 500 000
3 The creation of the logistical terminal and the acquisition of necessary vehicles. 50 000 000
4 The creation of the hotel complex. 15 000 000
TOTAL 321 000 000
?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
12
4. The pay-off period and the profit
According to the made calculations and planning
of activity, the investment into an air field
complex "Priluki" pay off throughout 2,5 years
from the moment of the beginning of functioning
of the airport. According to the specified
schedules of fulfilling of necessary works and
receptions of the basic permissive documentation,
the beginning of airport functioning can already
occur in 5 months from the moment of reception of
necessary capital assets.
The project profit is accruing and exceeds it on
30 comparing with average in the given field of
activity.
?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
13
Contact details
For the additional information
address ?el./fax 38 (044) 205 36 89
38 (067) 466-32-77 E-mail
office_at_fc-alkon.kiev.ua
?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua
14
Thank you for attention!
Contributor Bashkirov Michael Mihajlovich The
project head the Major General of aircraft ?el.
38 (050) 700-10-09
?. ????, ???. ??????????, 81 ???/???? 38 044 205
36 89 e-mail office_at_fc-alkon.kiev.ua
www.fc-alkon.kiev.ua