Title: Warsaw Case
129th November 2005
REVENUE Revenue Use from Transport Pricing 5FP
DGTREN 2004-2005 Urban case studies
Warsaw Warsaw University of Technology
2Revenue urban case studies
- Work Package 5 studied four Case Studies of
various scale and approach - Oslo
- Warsaw
- Edinburgh
- Cross-boundary acceptability
3Congestion charging in national transport policy
- 2001 National Transport Policy for 2001-2015
sustainable development - tolling motorways, cities parking, bridges,
congestion - entrance to city centers - 2005 National Transport Policy for 2006-2025
- in addition to parking fees, tolls for using
motorways and on heavy vehicles - charges for
entrance to central areas of big cities, for
crossing selected bridges, etc.
4Warsaw
- General objective to validate the feasibility of
approaches suggested in the REVENUE project
vis-Ã -vis revenue use from MC pricing - Proposed regulation schemes based around the
allocation of increased revenue from congestion
charging (toll charged at cordon line) for roads
/ public transport investment
5Warsaw
- 1,7 million inh, agglomeration 2,5 million
- over 400 cars per one thousand inh.
- Public transport share 65 of motorized trips
- Revenues from farebox covering 45 of operating
public transport costs - Congestion charging listed as longterm measure in
transport policy adopted in 1995 but no plans to
implement it in visible future
6Four options
- No charging (except parking charging)
- Charging - toll 4.5 PLN (1.12) - cordon
around the center 14 sq. Kms - Charging with revenues used to invest in new
ring roads - Revenues used to upgrade tramway lines to LRT
standard
7Cordon
8Gates
9Findings
- Road traffic reduction on the cordon
- introduction of toll reduction by 30,
- construction of ring road (outer zone) impact
insignificant - No of PT passengers crossing gates to the CBD
area - growth 5,5 , - additional tram line on North bridge small
impact
10Findings speed in peek hour
 option 1 option 2 option 3 option 4
Metropolitan area 48.332 48.883 49.093 48.925
Central area 35.671 36.624 36.801 36.750
City center 31.82 36.409 36.611 36.490
11Findings
- Speed increase (for vehicles)
- whole metropolitan area
- tool 0,6 km/h,
- toll plus bridge on the ring road 0,8 km/h
- city center
- tool 4,6 km/h,
- tool plus bridge 5 km/h
- Â
12Financial and ecomic analysis
Financial analysis options Financial analysis options Financial analysis options Economic analysis options Economic analysis options Economic analysis options
2 3 4 2 3 4
NPV (mln Euro) 482,7 36,2 2,9 -316,8 11,9 16,5
IRR 41,8 9,3 6,3 --- 6,5 6,9
13Survey - drivers
Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years?
YES YES NO NO dont know Total
26 26 67 67 7 100
Toll rate preferred Toll rate preferred Toll rate preferred Toll rate preferred Toll rate preferred Toll rate preferred
10 PLN 5 PLN 2 PLN dont know another Total
6 13 31 13 37 100
How to use revenues? How to use revenues? How to use revenues? How to use revenues? How to use revenues? How to use revenues?
roads 100 roads - 50 PT - 50 PT 100 mayors decission other Total
52 15 7 3 22 100
14Survey - stakeholders
Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years? Should charging be introduced in 5-10 years?
YES YES NO NO dont know Total
85 85 11 11 4 100
Appropriate toll rate Appropriate toll rate Appropriate toll rate Appropriate toll rate Appropriate toll rate Appropriate toll rate
10 PLN 5 PLN 2 PLN dont know another Total
20 46 19 0 15 100
How to use revenues? How to use revenues? How to use revenues? How to use revenues? How to use revenues? How to use revenues?
roads 100 roads - 50 PT - 50 PT 100 mayors decission other Total
4 45 35 4 11 100
15Warsaw - main findings
- Under present traffic and economic conditions the
social benefits of cordon charging would be
limited. - The financial viability and attitude of
stakeholders towards the charging concept may
stimulate decision makers to implement charging - The direction of EU / National transport policies
are important influences which could help
stimulate introducing of fiscal measures.