Title: Effective Training: Strategies, Systems and Practices, 3rd Edition
1Effective Training Strategies, Systems and
Practices, 3rd Edition
- Chapter Eight
- Development Implementation
- P. Nick Blanchard and James W. Thacker
2Development Phase
3Different Seating Arrangements for Training
Part 1 of 6
4Instructional Strategy
- Content Learning Points
- Materials and Equipment
- Trainees Manual
- Trainers Manual
- Facilities
- Training Room
5Seating Arrangements
- What arrangement is best for
- Seminar
- Small group exercises
- PPT/lecture
- What is the seating arrangement in this classroom
best suited for
6Different Seating Arrangements for Training
Part 2 of 6
7Different Seating Arrangements for Training
Part 3 of 6
8Different Seating Arrangements for Training
Part 4 of 6
9Different Seating Arrangements for Training
Part 5 of 6
10Different Seating Arrangements for Training
Part 6 of 6
11Knowledge, Skills, and Attitudes Required of an
Effective Trainer Part 1 of 2
Knowledge Subject matter Organization Adu
lt learning process Instructional methods
Skills Interpersonal communication
skills Verbal skills Active
listening Questioning Providing
feedback Platform skills Organization skills
12Knowledge, Skills, and Attitudes Required of an
Effective Trainer Part 2 of 2
- Attitudes
- Commitment to the organization
- Commitment to helping others
- High level of self efficacy
-
13Components of Instructional Strategy Part 1 of 3
Program Development Plan Name of Program Pipe
fitting I Target Population Apprentices who
have successfully passed the gas fitters exam
Overall Training Objective Trainees will be
able to examine a work project and with
appropriate tools measure, cut, thread, and
install the piping according to standards
outlined in the gas code.
14Components of Instructional Strategy Part 2 of 3
Learning Objective Learning Points Methods
Material and AV
1. Using a tape 1. Take into account Lecture
and Trainee manual measure, deter- the
extra length simulation Overhead mine the
length necessary Assortment of and
number of due to threading 1-inch and
3/4- pipes necessary 2. Take into account
inch fittings, to connect the length is
reduced by elbows, street furnace to the
gas different fittings, elbows, and
meter in a manner e.g., street elbow,
unions that meets the gas union, elbow,
etc. Mock meter code 3. How to
construct and furnace appropriate drop
setup for furnace Tape measure,
note pads
15Components of Instructional Strategy Part 3 of 3
Learning Objective Learning Points Method Material
and AV
2. Use threading 1. Length of thread Lecture
and Trainee manual machine to cut
required simulation VCR and TV and thread
length 2. Importance of Threading tape of
pipe required cutting and Threading machine
reaming, mea- Steel pipe suring, and
use Oil of threading Tape measure
machine oil
Facility and configuration Trainer Measures to
assist transfer Method of evaluation
16Implementation Phase