Orbit Packing Changes for Cycle 12 - PowerPoint PPT Presentation

About This Presentation
Title:

Orbit Packing Changes for Cycle 12

Description:

Orbit Packing Changes for Cycle 12 Tom Donaldson Overview Orbit Packing Today Orbit Packing in APT Orbit Packing in Cycle 12 Ops Retransing Cycle 12 Proposals ... – PowerPoint PPT presentation

Number of Views:107
Avg rating:3.0/5.0
Slides: 18
Provided by: sts68
Learn more at: https://apst.stsci.edu
Category:
Tags: changes | cycle | orbit | packing

less

Transcript and Presenter's Notes

Title: Orbit Packing Changes for Cycle 12


1
Orbit Packing Changes for Cycle 12
  • Tom Donaldson

2
Overview
  • Orbit Packing Today
  • Orbit Packing in APT
  • Orbit Packing in Cycle 12 Ops
  • Retransing Cycle 12 Proposals
  • Retransing Earlier Proposals
  • Dependencies
  • Wrap-Up

3
Orbit Packing Today
  • Exposure specifications are defined in .prop
    files using PED or text editor.
  • Trans expands the exposure specifications into
    the actual exposures.
  • User has no control over individual expanded
    exposures.

4
Orbit Packing Today (contd)
  • Trans assigns expanded exposures to orbits,
    adjusting their durations to optimize the orbit
    packing.
  • The DG displays orbit packing results.
  • Viewing the effects of changes to a proposal
    requires rerunning the entire proposal through
    the Preprocessor and Trans.

5
Orbit Packing Today PCs and PIs
PC Toolbox
Orbit Packing Actions
PLIB
S/W
User
RPS2
  • PED/emacs
  • Use .prop file.
  • Define exposure specifications.

PP
  • Syntax check.
  • Expand exposure specs into actual exposures.

Trans
  • Compute default durations of expanded exposures.
  • Adjust expanded exposure durations for instrument
    constraints.
  • Adjust expanded exposure durations for orbit
    packing.
  • Assign expanded exposures to orbits.
  • View orbit packing.

DG
  • Repeat process as needed.

PMDB
6
Orbit Packing in APT
  • APT will replace RPS2 in cycle 12.
  • Exposure specifications will be defined in .xml
    files using APT, not text editor.
  • User will be able to specify duration and orbit
    for expanded exposures.
  • Trans will not adjust expanded exposure durations
    for orbit packing.
  • Orbit Planner will display orbit packing results.
  • Viewing the effects of changes to a proposal
    requires only a partial run through Trans.

7

Orbit Packing in APT
APT
Orbit Packing Actions
S/W
User
  • Define exposure specifications.

APT Proposal Editor
  • Syntax check.
  • Use .xml file.
  • Expand exposure specs into actual exposures.
  • Compute default durations of expanded exposures.
  • Adjust expanded exposure durations for instrument
    constraints.

Trans
Orbit Planner
  • Adjust expanded exposure durations for orbit
    packing.
  • Assign expanded exposures to orbits.
  • View orbit packing.
  • Repeat process as needed.

8
Orbit Packing in Cycle 12 Ops
  • APT will not replace PC Toolbox in cycle 12.
  • .xml file will be primary proposal
    representation, but will be converted to .prop
    for use in Ops.
  • .prop files will contain duration and orbit
    number for expanded exposures.
  • Changes to proposal need to be made in APT, not
    PED or text editor.

9
Orbit Packing in Cycle 12 Ops (contd)
  • Trans will adjust expanded exposure durations up
    to 20 to optimize orbit packing (available mid
    cycle 12).

10
Orbit Packing in Cycle 12 Ops
PC Toolbox
Orbit Packing Actions
S/W
User
  • APT
  • Use .xml file.
  • Define exposure specifications.

PLIB and PP
  • Syntax check.
  • Expand exposure specs into actual exposures.

Trans
  • Compute default durations of expanded exposures.
    (As specified in APT)
  • Adjust expanded exposure durations for instrument
    constraints.
  • Adjust expanded exposure durations for orbit
    packing. (Optional)
  • Assign expanded exposures to orbits. (As
    specified in APT)
  • View orbit packing.

DG
  • Repeat process as needed.

PMDB
11
Retransing Cycle 12 Proposals
  • To minimize manual effort needed to retrans
    proposals, Operational Trans will adjust expanded
    exposure durations up to 20 to optimize orbit
    packing.

12
Retransing Earlier Proposals
  • Proposal created prior to cycle 12 will not have
    orbit assignments for expanded exposures.
  • Without those orbit specifications, Trans cannot
    be guaranteed to recreate the same orbit
    structure it had when the last time it was
    processed.
  • We address this with two plans

13
Retransing Earlier Proposals Plan A
  • Allow Trans to recompute the orbit packing.
  • If we dont like the orbit packing it created, we
    could
  • Live with using APT to edit the proposal to
    create a better packing.
  • When the packing is acceptable except for
    exceeding the orbit allocation, allow the extra
    orbit(s).
  • During development, analyze new Trans orbit
    packing to see how much it matches old Trans.

14
Retransing Earlier Proposals Plan B (if
analysis shows new Trans orbit packing differs
greatly from that of old Trans)
  • Trans could be configured to write a report
    detailing the orbit packing.
  • All outstanding proposals could be run through
    that version of Trans to create a record of the
    correct orbit packing.
  • That record could then be fed to Trans whenever
    one of those proposals was retransed.

15
Dependencies
  • This new operational flow depends on development
    in
  • Orbit Planner
  • APT infrastructure
  • Trans
  • RPS2
  • PC Toolbox
  • Most work to complete by mid summer, 2002.
  • Currently on schedule.
  • Allows time to react if problems come up.
  • Operational integration in 4th quarter, 2002.

16
Wrap-Up
  • The transition to APT will cause significant
    changes to the operational work flow.
  • Development and testing will be coordinated with
    the Trans team and the PC team.
  • This document is available off the orbit planner
    web page
  • http//apst.stsci.edu/apt/apt-orbit-planner/index.
    html

17
Orbit Planner Schedule
Write a Comment
User Comments (0)
About PowerShow.com