Stefano Carosio - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Stefano Carosio

Description:

Multiannual Roadmap Acknowledgements In close cooperation with the EC interservice Group under the coordination of the NMP Theme Thank you for your attention!! – PowerPoint PPT presentation

Number of Views:306
Avg rating:3.0/5.0
Slides: 19
Provided by: MartaFern
Category:
Tags: carosio | stefano

less

Transcript and Presenter's Notes

Title: Stefano Carosio


1
The industry Multi-annual Road Map and longer
term strategy for more energy efficient buildings
in Europe
Stefano Carosio DAppolonia S.p.A. EeB PPP AIAG
Co-ordinator
2
Where is the built environment sector?
  • Buildings use 40 of total EU energy
    consumption
  • The built environment generates 1/3 of GHG in
    Europe
  • Even new buildings are far from being all energy
    efficient
  • Replacement rate is very small (1 to 2 per
    year)
  • The renovation of the existing stock is a real
    challenge
  • Many experiments are made but actual impacts are
    limited
  • Business as usual is not an option!

3
Industry mobilisation and engagement
  • Within the framework of ECTP, E2BA was
    established to engage into a long term
    partnership with EC, aiming at
  • Seeking and demonstrating industry engagement
  • Coordinating research interests towards Public
    stakeholders
  • Keeping close links with international
    initiatives
  • Liaising with national/regional initiatives

4
in the full innovation chain
Over 140 members have joined the Association.
5
The industry vision and long term strategy (1/4)
6
The industry vision and long term strategy (2/4)
Time horizon
Beyond 2013
2010-13
Mobilisation of the entire value and innovation
chains
7
The industry vision and long term strategy (3/4)
Project Concepts/ opportunities
8
The industry vision and long term strategy (4/4)
EeB PPP as first wave of a Long Term Strategy
i.e. Retrofitting and reduction of energy use
i.e. Energy neutral buildings/districts
i.e. Energy positive buildings/districts
9
The roadmapping process
Analysis of ETPs/JTIs SRAs/SET Plan Roadmaps
(SETIS) over 200 contributions from E2BA
members highlighting research challenges and
opportunities
10
The roadmapping process
  • Actions carried out to prepare an Updated Draft
    of the document
  • Implementation of comments/feedbacks received
    during the 1st consultation
  • Identification of priorities by AIAG

11
The roadmapping process
  • Actions carried out in order to
  • finalise the Roadmap document
  • 2nd Public Consultation, updated Draft publicly
    available for comments to the stakeholders
    community on E2BA website
  • Participation to a high number of workshops,
    events and conferences to gather inputs outside
    E2BA
  • Implementation of comments/feedbacks received
    from broader stakeholders community, including
    relevant ETPs

12
Overall timing
April 13th 2010
Nov 30th 2009
Sept 30th 2009
July 13th 2009
Nov 9th 2009
April 2009
1st Draft development
2nd Draft development
Finalisation of the Roadmap
2nd Public Consultation
1st Public Consultation
13
Final version of the Roadmap
14
Final version of the Roadmap
15
Research priorities
Energy and equipment for energy use for
existing buildings
Envelope for existing buildings
Systemic approach for existing buildings
Interaction (integration) Between buildings,
grid, heat networks,
16
Multiannual Roadmap
17
Acknowledgements
In close cooperation with the EC interservice
Group under the coordination of the NMP Theme
18
Thank you for your attention!!
stefano.carosio_at_dappolonia.it secretariat_at_e2b-ei.e
u
Write a Comment
User Comments (0)
About PowerShow.com