2CONTENTS
? Overview of my training program
? Focus on one previous work
? Description of my work at IRFM
3Training program overview
EFDA Goal Oriented Training Program on Port Plug
Engineering Objective Train early-stage
engineers in several topics related to the ITER
port plug structures Duration 3 years (30 of
work time at partner institutes) Involved
institutes CEA (coordinator), FZJ, KIT, HAS
(home institute) Task coordinator Louis DOCEUL
4Work package overview
Work package 5 Thermo mechanical engineering of
in-vessel components Objective to become a
thermo mechanical analyst expert for the further
fusion research Duration 06.07.2009.
07.2012. (secondment at CEA-IRFM 03. Oct. 2010.
29. Jan. 2011.) Foreseen secondment 2011 KIT,
2012 FZJ Tools ANSYS Multiphysics and ANSYS
Workbench Supervisor Gábor GRUNDA Sophie
SALASCA (CEA secondment)
5CONTENTS
? Overview of my training program
? Focus on one previous work
? Description of my work at IRFM
6Previous works
ITER AEU frame structure structural analysis
MAST BES diagnostic thermal analysis
ITER CXRS shutter actuator thermal analysis
ITER EQPP 1 thermo mechanical analysis
7ITER CXRS shutter actuator
Description of the task
CXRS port plug
ITER cryostat
EFDA task under the direction of FZJ
Shutter
Main aims - temperature field of shutter
actuator - necessity of additional cooling -
optimal wall thickness of bellows
8ITER CXRS shutter actuator
Description of the appliance pneumatic
structure main parts are two bellows inside each
other axial shift is controlled by the gas
pressure two plates are fixed to the base two
internal plates are pushed by the actuator
Loads and boundary conditions internal heat
generation constrained temperatures temperature
dependant convection radiation
Temperatures
Convection
Radiation
9ITER CXRS shutter actuator
Results max. temperature 187
C permissible temperature 300 C no critical
regions
10ITER CXRS shutter actuator
Conclusion additional cooling is
not necessary temperature differences are not
significant all the wall thicknesses can be
adequate
Wall thickness 0,3mm
11CONTENTS
? Overview of my training program
? Focus on one previous work
? Description of my work at IRFM
12New design of diagnostic port plugs
F4E Grant 024 new design concept of diagnostic
port plugs horizontal drawers diagnostic systems
into the drawers
Drawers
13Description of Vis/IR diagnostic
4 equatorial ports visible and infrared range 2
tangential and 1 divertor view GCECFP group
optical engineers neutronic calculations
line of sights
mirrors
14Further developments
Distance between the first wall and pupil to
integrate the shutter The mirrors are located in
three areas Combined mirror holders Shielding
blocks 70 steel, 30 water
Mirror holders
Shielding blocks
15Conclusions
? Gained experience in thermo mechanics and
simulation tools (Ansys) ? Gained skills in
optical design and improvement of my 3D modeling
knowledge (Catia)
Many thanks to the CEA for the kind welcome!