Transcript and Presenter's Notes

Title: Marin Community College District CIP Briefing


1
  • Marin Community College DistrictCIP Briefing
    Citizens Oversight Committee
  • September 13, 2005

2
Kentfield CampusTentative Project List
  • Modernization of Learning Resource Center
    66,000 gsf
  • Modernization of Harlan Center 25,651 gsf
  • Modernization of Fusselman Hall 14,717 gsf
  • Modernization of Science Center 50,837 gsf
  • Modernization of Fine Arts Center 79,636 gsf
  • Modernization of Student Center 36,227 gsf
  • Modernization of Diamond Physical Ed Center
    36,392 gsf
  • Multi-purpose, Child Care Support Facility
    75,000 gsf New Construction
  • Liberal Arts Complex or Science Building - 75,000
    gsf New Construction
  • Facilities Maintenance Center 30,000 gsf New
    Construction
  • Gateway Entrance Plaza New Construction

3
Indian Valley CampusTentative Projects List
  • Modernization of Pomo Center - 47,494 gsf
  • Modernization of Administrative Childrens
    Center - 19,588 gsf
  • Capital Renewal Expansion of Central Plant -
    2,000 gsf
  • Capital Renewal of Library 14,280 gsf
  • Capital Renewal of Miwok Cluster 28,410 gsf
  • Capital Renewal of Ohlone Cluster 20,543
  • Pedestrian Bridges

4
Bolinas Marine Biology Center
  • Modernization or New Construction 3,333 gsf

5
District-WideTentative Projects List
  • Telecommunications
  • Infrastructure
  • Site
  • Parking Roadways
  • Utilities (Sanitary, Storm, Electrical, Gas)
  • Fire Alarm Replacement
  • Access Controls
  • ADA Accessibility Improvements
  • Signage

6
District Design Team
7
District Architect
  • Campus Master Planning
  • Design Drafting Guidelines
  • Interior Exterior Finish Standards
  • Furniture, Fixtures Equipment Standards

8
District Landscape Architect
  • Services
  • Master Planning
  • District Standards
  • Design Guidelines

9
District Civil Engineering
  • Update all Surveys (Topographic Boundary)
  • Locate, map, Identify, Inspect Analyze all
    Utilities
  • Identify all Easements Encumbrances on District
    Property
  • Create Accurate Electronic As-Built / Record
    Drawings that Record all Above Information
  • Develop District Standards and Design Guidelines

10
District Geotechnical Engineering
  • Collect and Synthesize all Existing Soils Testing
    and Analysis Information
  • Recommend and/or Perform Additional Soils Testing
    Analysis
  • Perform Fault Analysis
  • Provide Design parameters for Building and
    Infrastructure Design

11
Mechanical and Plumbing Engineering
  • Chilled Water Systems
  • Heating Hot Water Systems
  • Co-Generation / Central Plant Systems
  • Water Distribution Systems
  • Building and Site Mechanical Systems
  • Savings by Design
  • Building and Site Control Systems

12
Electrical Engineering
  • Substations
  • Co-Generation
  • Electrical Distribution Systems
  • Lighting
  • Savings by Design
  • Control Systems
  • MCC

13
California Environmental Quality Act (CEQA)
  • Provides review, analysis studies to assess the
    Districts development plan and its impact on the
    environment in accordance with the California
    Environmental Quality Act.
  • Prepares Produces Required Documentation
  • Negative Declaration
  • Mitigated Negative Declaration
  • Environmental Impact Report(s)

14
Next Steps
  • Educational Master Plan Road map to future
  • District Consultants
  • Design Guidelines
  • Building Standards
  • FF E Standards
  • District Assessments and Surveys
  • Program Definition
  • Scope / Schedule / Budget

15
Next Steps
  • Board of Trustee Retreats
  • September 20th Facilities Master Planning
  • October 11th Program Controls
  • Green Summit on Sustainability Facilities
  • September 30, 2005 9 A. M. to 3 P. M.
  • (Initial Sustainability Summit Held September
    9th)

16
Next Steps
  • Projects in Design
  • Kentfield
  • Roof Repairs Harlan Center and LRC
  • Partial Roof Replacement Physical Education
    Building
  • Tree Trimming and Removal
  • Demolition of Larkspur Annex
  • IVC
  • Wildfire Mitigation
  • Partial Gas Main Replacement
  • Tree Trimming and Removal
  • Stream Erosion Mitigation

17
Other Issues
  • Kentfield
  • Title 9 Compliance (PE Complex)
  • IVC
  • Bridge Load Testing
  • Bolinas
  • Fault Study

18
Questions Answers
Dave Kirn Program Manager (415)
884-3192 Dave.Kirn_at_marin.cc.ca.us
José D. Nuñez Director of Modernization (650)
358-6936 Jose.Nunez_at_marin.cc.ca.us