Title: Marin Community College District CIP Briefing
1- Marin Community College DistrictCIP Briefing
Citizens Oversight Committee - September 13, 2005
2Kentfield CampusTentative Project List
- Modernization of Learning Resource Center
66,000 gsf - Modernization of Harlan Center 25,651 gsf
- Modernization of Fusselman Hall 14,717 gsf
- Modernization of Science Center 50,837 gsf
- Modernization of Fine Arts Center 79,636 gsf
- Modernization of Student Center 36,227 gsf
- Modernization of Diamond Physical Ed Center
36,392 gsf - Multi-purpose, Child Care Support Facility
75,000 gsf New Construction - Liberal Arts Complex or Science Building - 75,000
gsf New Construction - Facilities Maintenance Center 30,000 gsf New
Construction - Gateway Entrance Plaza New Construction
3Indian Valley CampusTentative Projects List
- Modernization of Pomo Center - 47,494 gsf
- Modernization of Administrative Childrens
Center - 19,588 gsf - Capital Renewal Expansion of Central Plant -
2,000 gsf - Capital Renewal of Library 14,280 gsf
- Capital Renewal of Miwok Cluster 28,410 gsf
- Capital Renewal of Ohlone Cluster 20,543
- Pedestrian Bridges
4Bolinas Marine Biology Center
- Modernization or New Construction 3,333 gsf
5District-WideTentative Projects List
- Telecommunications
- Infrastructure
- Site
- Parking Roadways
- Utilities (Sanitary, Storm, Electrical, Gas)
- Fire Alarm Replacement
- Access Controls
- ADA Accessibility Improvements
- Signage
6District Design Team
7District Architect
- Campus Master Planning
- Design Drafting Guidelines
- Interior Exterior Finish Standards
- Furniture, Fixtures Equipment Standards
8District Landscape Architect
- Services
- Master Planning
- District Standards
- Design Guidelines
9District Civil Engineering
- Update all Surveys (Topographic Boundary)
- Locate, map, Identify, Inspect Analyze all
Utilities - Identify all Easements Encumbrances on District
Property - Create Accurate Electronic As-Built / Record
Drawings that Record all Above Information - Develop District Standards and Design Guidelines
10District Geotechnical Engineering
- Collect and Synthesize all Existing Soils Testing
and Analysis Information - Recommend and/or Perform Additional Soils Testing
Analysis - Perform Fault Analysis
- Provide Design parameters for Building and
Infrastructure Design
11Mechanical and Plumbing Engineering
- Chilled Water Systems
- Heating Hot Water Systems
- Co-Generation / Central Plant Systems
- Water Distribution Systems
- Building and Site Mechanical Systems
- Savings by Design
- Building and Site Control Systems
12Electrical Engineering
- Substations
- Co-Generation
- Electrical Distribution Systems
- Lighting
- Savings by Design
- Control Systems
- MCC
13California Environmental Quality Act (CEQA)
- Provides review, analysis studies to assess the
Districts development plan and its impact on the
environment in accordance with the California
Environmental Quality Act. - Prepares Produces Required Documentation
- Negative Declaration
- Mitigated Negative Declaration
- Environmental Impact Report(s)
14Next Steps
- Educational Master Plan Road map to future
- District Consultants
- Design Guidelines
- Building Standards
- FF E Standards
- District Assessments and Surveys
- Program Definition
- Scope / Schedule / Budget
15Next Steps
- Board of Trustee Retreats
- September 20th Facilities Master Planning
- October 11th Program Controls
- Green Summit on Sustainability Facilities
- September 30, 2005 9 A. M. to 3 P. M.
- (Initial Sustainability Summit Held September
9th)
16Next Steps
- Projects in Design
- Kentfield
- Roof Repairs Harlan Center and LRC
- Partial Roof Replacement Physical Education
Building - Tree Trimming and Removal
- Demolition of Larkspur Annex
- IVC
- Wildfire Mitigation
- Partial Gas Main Replacement
- Tree Trimming and Removal
- Stream Erosion Mitigation
17Other Issues
- Kentfield
- Title 9 Compliance (PE Complex)
- IVC
- Bridge Load Testing
- Bolinas
- Fault Study
18 Questions Answers
Dave Kirn Program Manager (415)
884-3192 Dave.Kirn_at_marin.cc.ca.us
José D. Nuñez Director of Modernization (650)
358-6936 Jose.Nunez_at_marin.cc.ca.us