CIP Level 1 NACE-CIP1-001 questions not only help you pass your NACE-CIP1-001 exam but enable you to demonstrate the purpose of the exam. If you have decided to become NACE-CIP1-001 certified professional, Passcert is here to help you achieve your goal. We know better what you need to pass your NACE-CIP1-001 exam. – PowerPoint PPT presentation

Number of Views:253

less

Transcript and Presenter's Notes

Title: CIP Level 1 NACE-CIP1-001 questions


1
NACE-CIP1-001 dumps
  • Coating Inspector Level 1

2
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 1. You are the NACE Inspector on a tank lining
    project where a 50 solids epoxy tank lining is
    being applied. After application of the 19 coat
    you notice small blisters in some areas of the
    applied lining.
  • Your FIRST preferred course of action is to
  • A. Break the blisters to see what's inside
  • B. Document the problem and advise the Contractor
    and Owner's representative
  • C. Document the problem and advise the Contractor
  • D. Extract any liquid that may be inside the
    blister and send it to the lab for further
    analysis
  • Answer B

Passcert.com
3
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 2. Dew point is the temperature at which
  • A. water freezes.
  • B. humidity decreases
  • C. condensation occurs.
  • D. the air is saturated.
  • Answer C

Passcert.com
4
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 3. If a contractor is using a poorly maintained
    compressor to supply air for abrasive blast
    cleaning and conventional airspray, the coating
    inspector should perform a
  • A. dry film thickness (DEI) measurement.
  • B. wet film thickness (WFT) measurement.
  • C. blotter test for the presence of oil and
    water.
  • D. vial lest.
  • Answer C

Passcert.com
5
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 4. Upon arrival of coating materials, the
    inspector should
  • A. review coating contractors' plans for storage
    of coating materials and confirm they meet
    national, local and owners' fire and
    environmental regulations.
  • B. observe and document the amount of material
    and batch numbers.
  • C. observe aryl document that the applicator WFT
    at regular intervals during application.
  • D. observe and document time frame and
    environmental conditions between each coat.
  • Answer B

Passcert.com
6
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 5. Relative humidity is
  • A. a measure of the amount of moisture in the air
    compared to saturation level.
  • B. a measure of the amount of moisture in the air
    compared to the air temperature.
  • C. the lowest temperature at which moisture forms
    on a steel surface.
  • D. the highest temperature at which moisture
    forms on a steel surface.
  • Answer A

Passcert.com
7
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 6. Galvanic corrosion occurs on which of the
    following substrates
  • A. Concrete
  • B. Fiberglass Reinforced Plastic
  • C. Metal
  • D. Wood
  • Answer C

Passcert.com
8
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 7. When applying Thermal Spray Coatings the
    specification is most likely to refence
  • A. SSPC PA 2
  • B. NACE SP 0178
  • C. NACE SP 0188
  • D. SSPC-CS 23.00/AWS C2.23/NACE No. 12
  • Answer D

Passcert.com
9
CIP Level 1 NACE-CIP1-001 Practice Questions
  • 8. What is the minimum recommended distance away
    from an edge that an inspector should take a
    measurement with a dial-type magnetic pull-off
    Dry Film Thickness (DFT) gauge?
  • A. 1 cm (.39 inch)
  • B. 2.5 cm (1 inch)
  • C. 6.35 cm (2.5 inch)
  • D. 2.5 millimeters (.10 inch)
  • Answer B

Passcert.com
10
Why choose Passcert dumps?
  • Questions collected from real test
  • One year free update
  • Money back guarantee
  • Send both pdf and software(free)
  • Lower price
  • https//www.passcert.com/NACE-CIP1-001.html
Write a Comment
User Comments (0)
About PowerShow.com