Modernization of Science Center 50,837 gsf. Modernization of Fine ... Gateway / Multi-purpose, Child Care & Support Facility 75,000 gsf New Construction ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 18
Provided by: SMC18
Learn more at: http://www.marin.edu
Category:

less

Transcript and Presenter's Notes

Title: Marin Community College District CIP Update


1
  • Marin Community College DistrictCIP Update
    College of Marin Foundation
  • May 31, 2005

2
Organization
College of Marin - CIP
Board of Trustees
Presidents
Cabinet
Modernization Committee
Swinerton M C Program Construction Manger
Maintenance Operations
District Consultants
Indian Valley Campus Bolinas Campus Construction
Manager Swinerton M C
Kentfield Campus Construction Manager Swinerton M
C
3
Demographics
  • Kentfield Campus (KTD) - Kentfield
  • Built Original Buildings Date Back to 1926
  • Acreage 87 Acres / 373,806 sf / 18 Buildings
  • Parking 1,774
  • Indian Valley Campus (IVC) Novato
  • Build 1975
  • Acreage 333 Acres / 171,549 sf / 22 Buildings
  • Parking - 900
  • Bolinas Marine Biology Center
  • Built 1964
  • Acreage - .5 Acres / 4,178 sf / 2 Buildings
  • District-wide
  • 6,943 Students
  • 5,334 Student FTES
  • 287 Faculty and Staff

4
Kentfield Campus (KTD)
5
Kentfield Campus (KTD) Modernization
6
Kentfield CampusTentative Project List
  • Modernization of Learning Resource Center
    66,000 gsf
  • Modernization of Harlan Center 25,651 gsf
  • Modernization of Fusselman Hall 14,717 gsf
  • Modernization of Science Center 50,837 gsf
  • Modernization of Fine Arts Center 79,636 gsf
  • Modernization of Student Center 36,227 gsf
  • Modernization of Diamond Physical Ed Center
    36,392 gsf
  • Gateway / Multi-purpose, Child Care Support
    Facility 75,000 gsf New Construction
  • Liberal Arts Complex or Science Building - 75,000
    gsf New Construction
  • Facilities Maintenance Center 30,000 gsf New
    Construction
  • Gateway Entrance Plaza New Construction

7
Indian Valley Campus (IVC)
8
Indian Valley Campus Tentative Projects List
  • Modernization of Pomo Center - 47,494 gsf
  • Modernization of Administrative Childrens
    Center - 19,588 gsf
  • Capital Renewal Expansion of Central Plant -
    2,000 gsf
  • Capital Renewal of Library 14,280 gsf
  • Capital Renewal of Miwok Cluster 28,410 gsf
  • Capital Renewal of Ohlone Cluster 20,543
  • Pedestrian Bicycle Bridges
  • Repair/Replace HVAC Systems
  • Replace Sections of Natural Gas Pipeline
  • Repair/Replace Roofing
  • Fire Mitigation

9
Bolinas Marine Biology CenterTentative Projects
List
  • Modernization or New Construction
  • Stabilize Slopes
  • Improve Accessibility
  • Repair Boat Dock

10
Site Development Projects
  • New Entrance Plaza at College Ave. and Sir
    Francis Drake Blvd.
  • Enhanced Perimeter Landscaping
  • New Pedestrian Bicycle Bridge across Corte
    Madera Creek
  • Improved Accessibility on both Campuses
  • New Campus locator (wayfinding) system on both
    Campuses

11
District-WideTentative Projects List
  • Telecommunications
  • Infrastructure
  • Site
  • Parking Roadways
  • Utilities (Sanitary, Storm, Electrical, Gas)
  • Fire Alarm System Replacement
  • Access Controls
  • ADA Accessibility Improvements
  • Signage (Wayfinding)

12
Roles Responsibilities of Program
Manager/Construction Manager (PM/CM)
  • District-wide Management and Consulting
  • District-wide Master Planning with District-wide
    Design Consultant
  • Program Definition
  • Establish District Standards and Design Criteria
  • Overall Campus Wide Construction Projects
  • Coordination with District and College Staff
  • Conducts Design Code Reviews
  • Implements Campus Design Plan with Design
    Consultants
  • Manages Multiple Projects
  • Ensures Quality Control
  • Overall Campus Logistics Job Site Safety
  • Overall Construction Inspections Testing
  • Project Controls

13
Design Consultant Categories
Industrial Hygienist Inspector of Record IT Data
Telecom Laboratory Planner Landscape Landscape
and Planning Legal MEP (Mechanical, Electrical
and Plumbing Engineers) Planner Security / Access
Control Sports Structural Engineer Testing and
Inspection Theatre Consultants
A/E Consultant Acoustics and Acoustics/Audiovisual
Arborist Architect Architect
Planners Architects Engineers California
Environmental Quality Act (CEQA) Civil
Engineering Electrical Engineering Energy
Consultants Energy, Utility Telecom
Infrastructure FF E Consultants Fire Protection
Alarms Fire Protection Sprinklers Geotechnical
14
Consultant Services The Process The Timeline
  • Advertisement Marketing
  • Prebid Briefing (Mandatory)
  • Issue Request for Qualifications/Request for
    Proposal (RFQ/RFP)
  • RFQ Due
  • Paper Screen Statements Development of Short
    List
  • Selection Committee Interviews Short-Listed Firms
  • BOT Approves Contract
  • Contract Award
  • Contract Negotiation
  • Notice to Proceed
  • Commencement of Services

15
Consultant Recommendations
  • Board of Trustees Meeting, June 7, 2005
  • District Architect
  • District Landscape Architect
  • District Civil Engineer
  • District Structural Engineer
  • District Mechanical, Electrical Plumbing (MEP)
    Engineer
  • District Geotechnical Engineer
  • District Industrial Hygienist (HazMat)
  • District California Environmental Quality Act
    (CEQA) Consultant

16
Detailed Selection Process Schedule
17
  • Questions Answers

José Nuñez Director of Modernization (415)
884-3139 nunezj_at_smccd.net
Dave Kirn Program Manager (415)
884-3192 Dave.Kirn_at_marin.cc.ca.us