Consultants Forum
GVW Board Room 12 August 2009
1
2
WELCOMEPaul Kerrins TCS Coordinator
  • Welcome
  • Introduction to New Personnel
  • Benefits for Developers, Consultants GVW
  • GVW Expectations of Consultants Contractors

3
Revised Developer Construct Agreement
  • Concerns have been raised regarding the liability
    for defective construction being placed on the
    Consultant
  • Consultants cannot obtain liability insurance for
    works completed by others (contractors)
  • This change has subsequent impacts on the rest of
    the Agreement, such as section 3
  • Section 5 of the Agreement has also been deleted

4
Revised Developer Construct Agreement
  • Minor changes made
  • Section 9.1 (10.1 in old agreement)
  • Section 16 is a re-written version of the old
    Section 31 and clarifies the extent of a
    Consultants liability should they leave a project
  • Section 22 clarifies when the Corporation assumes
    ownership of the assets
  • Section 30 discusses when the Corporation may
    contribute to the cost of the works
  • Sections 37-40 provide guidelines for Dispute
    Resolution
  • Remaining changes are ancillary in nature and
    have little or no impact on the spirit of the
    Agreement

5
Revised Developer Construct Agreement
  • Council Works
  • Simplified Agreement created to suit Council, or
    other service agency, as the client (developer)
  • Process unchanged
  • GVW Agency Consultant

6
Developer Construct Manual
  • Document has been updated and revised.
  • Changes include
  • Current Contact Details updated
  • Revised certification documentation
  • Compaction Test Results - Compulsory
  • SOIs Revised and Adopted
  • CCTV
  • Shutdown Request
  • Product Manual references now to GVW Product
    Manual
  • Materials Approved minor revisions
  • New Inclusions
  • Product Manual
  • Design Guidelines
  • Pressure Sewer

7
Product Manual
  • Refer to City West Water Product Catalogues
  • Pressure Pipelines
  • Gravity Sewer
  • GVW Supplements to City West Water
  • Pressure Pipelines
  • Gravity Sewer
  • GVW Documents
  • Sewage Pump Station Manual
  • Pressure Sewer
  • Items to note
  • Water
  • Pre Tapped Connections
  • Tapping Bands for PE pipe
  • Sewer
  • Sewer Max

8
Design Guidelines
  • New Initiative Still Being Developed
  • Provide Description of Assets not a
    specification
  • Currently Includes
  • Ground Level Storage Tanks
  • Water Supply Booster Pump Stations
  • Will be Updated as Developed
  • Internal Documents for Consultant Designs
  • Microfiltration Plant
  • Hypo Chlorination Units etc

9
Pressure Sewer
  • GVW Preference is for Conventional Sewerage
    Reticulation
  • Gravity Sewer Pipelines
  • Sewage Pump Station
  • Alternative Option for Providing Reticulated
    Sewerage Services
  • GVW Adopted System and Policy Procedures of
    Yarra Valley Water
  • Customised to GVW Requirements
  • Design and Construction in accordance with GVW
    Developer Construct process

10
Pressure Sewer
  • Features include
  • Barnes OGP Pump Aquatec System
  • Consultant Design Manage Construction
  • Feasibility Report required
  • Developer Charges include
  • New Customer Contributions
  • Future Pump Installation Charges
  • Telemetry for Remote/Critical Sites (Large
    Commercial)
  • Focus on Preventing Odour

11
Pressure Sewer
  • GVW documents to assist with process include
  • Principles
  • Guidelines
  • Consultant Checklist
  • Product List
  • To Be Developed
  • Customer Agreement
  • Customer Information Booklets

12
Sewer Build Over PolicyRelining Option
  • GVW Preference (in order)
  • Comply with Policy
  • Alter Building/Structure Design
  • Relocate Sewer
  • If these cannot be achieved within reason, GVW
    will consider relining as an option
  • GVW documentation
  • Guidelines
  • Consultant checklist

13
Sewer Build Over PolicyRelining Option
  • Conditions the following to be completed at
    Developers cost
  • Investigation of Options
  • CCTV Inspection
  • Location of Sewer Main
  • Estimate of Relining Costs
  • Developer
  • GVW
  • Upfront Payment by Developer
  • Signing of Indemnity Agreement
  • GVW to undertake relining works

14
Summary
  • GVW has broadened the tools available by adopting
    new options including materials, pressure sewer
    systems and relining for build over options.
  • GVW will continue to investigate and improve the
    systems and options available
  • GVW encourage feedback and comments from
    industry, particularly consultants contractors
    who use the documents and install the systems
  • The Development Construction Manual is
    available on the GVW web page

15
DiscussionQuestions
16
Thankyou for your attendance