Title: UK Link Industry Engagement Forum
1UK Link Industry Engagement Forum
2Gas Nominations Allocations End to End Process
Walkthrough
3Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
4Calculate NDM Output Nominations
NDM Demand estimation formula the formula willl
no longer use the Scaling Factor and will apply a
Weather Correction Factor calculated from the
Forecast Weather data. Formula
(AQ/365)ALP(1DAFWCF)
UNC Ref H2.2- Formula C2.5 Principles of NDM
Nominations
Weather Correction Factor adjusts for the
difference between the Daily Composite Weather
Variable and the Daily Seasonal Normal Composite
Weather Variable per LDZ.
Settlement BRD Ref 5.1, 5.3
Note There are no file formats associated with
this Business Process.
5Validate Output Nominations
Applicable to Class 1 2 Nominations
UNC Ref C2.2.6 D-7
Where a Gas Nomination for a Class 1 2 is not
submitted, a D-7 estimate will be generated and
applied. The estimate will be based on a D-7
Output Nomination.
The generation of an estimate will be visible in
Gemini and can be replaced within the Gas
Nomination timescales.
Settlement BRD Ref 5.1.2
Note There are no file formats associated with
this Business Process.
6Calculate Forecast Unidentified Gas
UNC Ref H2.6 Unidentified Gas
The Forecast Unidentified Gas will be apportioned
to Shippers using the Allocation Adjustment
Factors. A Unidentified Gas Meter ID will be
created per Shipper per LDZ / Exit Zone.
3.4.4.2 Publish Forecast Unidentified Gas
Forecast Unidentified Gas Available
The LDZ Forecast Unidentified Gas is calculated
at D-1 for the Gas Flow Day. Calculation LDZ
Forecast Demand (LDZ shrinkage Total DM
Nominations Total NDM Nominations)
Settlement BRD Ref 5.4
7Calculate Energy Allocations
UNC Ref E3
Unidentified Gas Available
3.5.3 Calculate LDZ unidentified gas
Unidentified Gas value feeds into imbalance
position and cash out charges.
New NDM demand calculation. The formula will no
longer include the Scaling Factor and will apply
a Weather Correction Factor calculated from
actual weather data.
Weather Correction Factor adjusts the difference
between the daily CWV and the daily seasonal
normal CWV per LDZ.
Settlement BRD Ref 5.3
8Calculate Unidentified Gas Allocation
The Allocated Unidentified Gas will be
apportioned to Shippers using the Allocation
Adjustment Factors.
Allocated Unidentified Gas Available
3.5.3.2 Publish Allocated Unidentified Gas
UNC Ref E1.1.6 E1.1.7
The LDZ allocated Unidentified Gas is calculated
at D1 for the Gas Flow Day. Calculation LDZ
Demand (LDZ Shrinkage Total DM Allocations
Total NDM Allocations)
Settlement BRD Ref 5.4
9Supply Point Transfer End to End Process
Walkthrough
10Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
11Supply Point Enquiry
Enquire against all registered Supply Points via
the enquiry file (S47).
NMRS59,S70,S75,S98Q44 Q51
NMR S78,S68,S72
Response via (S59) Response will includeA
maximum 24 months worth of history or the maximum
available for the Supply Point. Volume will be
provided in kWhAMR Indicator Class
(prevailing)Batch Frequency (class 3)SMP and
Formula Year AQSOQ for Class 3 4 DNI
Indicator Withdrawal Status Seasonal
Indicator CYM
NOM S47,S68
New feature within the existing enquiry file
(S47) to submit a consumption request.
Supply Point Register BRD Ref 8.4
Note Files to be used for GT and iGT sites.
12Supply Point Nomination
NMR S21, S69, S72 U70,U72
NOM S48, S69 U70,U72
NMR S21,S69
NRF S21,S69 S72, Q46
NMR,NRF - S64, S70, S75, K12,K14,S98,Q44,
U71,U73,U74,U75, Q46, K85
- Sites may be referred for
- Class 1 and 2 for capacity
- request for short haul
- New request for seasonal capacity (subject to mod
approval). Note iGT sites referring for
capacity will refer to the iGT GT.
- Response will be via the offer (S64).
- Offer now includes
- Class
- CSEP Data
- GT Rates
- iGT Rates
- Short Haul Rates (where appropriate).
- CYM (current year minimum MOD445)
- DNI Indicator
- Nomination request (S48) will include
- Class type,
- If requesting Class 1 or 2, you have to nominate
the SOQ SHQ, existing capacity validations will
be applied - If requesting Class 3 the batch period for
submitting reads will need to be provided. This
period can be either 7 days, 14 days or 1 month.
Supply Point Register BRD Ref 8.2, 8.3, 8.6
Note Files to be used for GT and iGT sites.
13Supply Point Confirmation
CNF S38, S42,S66, S67,S83, S84,U70, U72, T05
CFR S72, S09, S16,S66,S67,S83,S84,U70,U72,T06
CFR S07,S70,S75,S66,S67,S83,S84,S98,K12,K14,
K85, Q44,Q45,U71,U73,U74, U75,S10,S77,T06,T07
WAO -S39,S40,S74,S41,S54,S73
TRF S15,S70, S75,S66, S67,S76,
S98,Q44,Q45,U71,U73,U74,U75,S88,S63,S08, S72,K12,K
13, K85
WOR S11,S12, S26,S13, S14,S30, S65,S72
DCF S08,S70, S76, S63,S72
MRI-U06,K15, S98,N90
- Transfer of Ownership D-7 (D-2 Faster Switching)
to be provided - Gas Nomination ID
- AMR
- SMSO ID
- CYM (if applicable)
- Last Read Read Date
- Confirmation only sites for SSPs
- Class
- SOQ/SHQ (as recorded at the time) for Class 2 and
SMQ in ratio of previous 3 or 4 - Class 3 SSP sites will need to provide the batch
read frequency. - Confirmation response (S38 LSP / S42 SSP) will
include - Class
- iGT Rates
- iGT CSEP data
- AMR Indicator
- CYM (if applicable)
Supply Point Register BRD Ref 8.2, 8.11
Replacement reads to be sent via the U01 file for
the transfer date
Note Files to be used for GT and iGT sites.
14Class Change End to End Process Walkthrough
15Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
16Manage Class Change
SPC C38, C39
D-2 Process Gemini
Class Change (SPC) record C38 minimum 5 business
days (regardless of class) Provide class if
going from Class 2 (from 3 or 4) provide
prevailing SOQ SHQ in ratio. If Class 1 or
Class 2, the prevailing SOQ/SHQ must be used and
the effective date.
Class 3 Batch Frequency Class 4 MRF (can cancel
2.12) by D -3
Response Gas Nomination ID. SMP AQ/SOQ Class
1/2 SMP AQ/SOQ Formula Year AQ/SOQ Class 3/4
Supply Point Register BRD Ref 8.10
17Class Changes24th October 2014
18Introduction
- This presentation aims to provide an overview of
the process for Class change specifically the
reconciliation and Check Read processes. -
- The presentation also covers scenarios where
there is a Shipper Transfer and Class change
combined. - Where a combined change of Shipper and Class
change is associated with DRE/AMR equipment the
focus is around apportioning the drift following
a Check Read.
19Why have a Check Read
- Check Reads are required where equipment (AMR) is
installed that derives the reads from the meter. - The Check Read identifies where the meter and the
equipment are not synchronised and will detect
any drift between the meter and the equipment.
Any drift is then apportioned across the relevant
period. - Class 1 and 2
- Class 3 and 4
Daily Reads
A
A
A
A
A
A
CR
CR
Reconciliation
Reconciliation
Reconciliation
A
A
A
CR
CR
20Class Change
Process Description Process for initial Allocation Process for Energy Balancing close-out Read Submission Timescales Type of Read Submission AQ Calculation Reconciliation
Class 1 Daily Metered Time Critical Readings Uses daily read Uses daily read By 11am on GFD1 All reads daily on GFD1 Monthly using Optimum Read Meter Point level following a site visit or estimate
Class 2 - Daily Metered not Time Critical Readings Transporter estimate Uses daily read By end of GFD1 (05.59 am) All reads daily by end of GFD1 Monthly using Optimum Read Meter Point level following a site visit or estimate
Class 3 Batched Daily Readings Allocation Profiles Allocation Profiles Daily Reads in batches All daily reads in batches Monthly using Optimum Read Daily Rec at Meter Point level on receipt of a batch of reads
Class 4 Periodic Readings Allocation Profiles Allocation Profiles Periodic Periodic reads Monthly using Optimum Read Meter Point level at receipt of read
21Terms Used
- DRE Daily Read Equipment
- AMR Automatic Read Equipment
- GFD Gas Flow Day
- CR Check Read
- A Actual Read
- N Cyclic Read
- E Estimate Read
- D Effective date of the Class Change
22General Principles
- Where DRE/AMR is installed for Class 2, 3 4 the
kit is not changed on a Class change only event. - For a change in Class an Actual read is required
to close out the outgoing Class. - The Actual Read provided for the effective date
of the Class change will not be subject to the
read tolerance validations only standard asset
validation (serial number, dials and units etc.) - This is because the read may not follow on from
the previous read due to the difference between
the on-site reading and the derivable reads. - On Class Change only event the Check Read will
reconcile back to the previous Check Read or
AMR/DRE Installation Read. - When AMR/DRE equipment is installed the first
Check Read received will reconcile back to the
previous Check Read or Installation Read.
23General Principles - Reconciliation
- There are 3 steps for energy allocation/reconcilia
tion for Class 3 and 4 Supply Meter Points where
AMR equipment is installed - Daily Allocations are based on the Demand
Estimation Formula. - An Actual Read received will trigger
reconciliations. - Daily for Class 3
- Periodic for Class 4
- Following receipt of a Check Read reconciliation
will be triggered back to the previous Check Read - In the cases of a Shipper Transfer this will be
the opening read. - Where AMR/DRE is fitted on a Class 3 or 4
Reconciliation will be processed first followed
by the Check Read Reconciliation (apportion the
drift across the period). - For Class 1 and 2 any replaced meter readings
received outside of - close-out will trigger Reconciliation.
24General Principles Shipper Transfer
- For Class 1 and 2, any reads received following a
Shipper Transfer that fail validation will
generate an Estimated Read. On receipt of a valid
actual read the Estimated Reads will be - re-calculated (better estimates) back to the
Shipper Transfer/Class change day. - If the Check Read is not provided for the Class
change date for a Shipper Transfer within the UNC
timescales then an Estimate Read will be
calculated and treated as a Check Read. - Class 2 within GFD5
- Class 3 4 within Month10
- For a Shipper Transfer where the outgoing Class
is Class 1 or 2 the D-1 volume - will be estimated for Allocation purposes, either
using D-7 or AQ/365. - This is to ensure that the drift is allocated to
the correct period (previous Check Read) rather
than the total drift allocated to the day before
the Class change - On Shipper Transfer where AMR/DRE equipment is
fitted the Opening Read received will be treated
as a Check Read and therefore will trigger
Reconciliation back - to the last Check Read. This will close out the
position for the Outgoing - Shipper.
25Files Formats
- The reads will be provided on the following
communication methods - Incoming Methods
Class Type File
Class 2 UDR
Class 3 UBR
Class 4 UMR
Class 2 Site Visit Details Web Services
Class 3 4 Site Visit Details SFN
26Same Shipper Class change, Class 2 to 3, DRE/AMR
fitted.
Scenario A Opening read provided
Class Change Day
Class 2
Class 3
D-2
D-1
D
A
A
A
A
A
A
Reconcile A?A
CR
27Same Shipper Class change, Class 2 to 3, DRE/AMR
fitted.
Scenario A Opening read not provided
Class Change Day
Class 2
Class 3
D-2
D-1
D
D-7
A
A
A
A
A
E
Reconcile E?A
CR
28Shipper Transfer with Class Change, Class 2 to 3,
DRE/AMR fitted, Opening Read provided by Incoming
Shipper.
Transfer/Class Change Day
Incoming Shipper (Class 3 )
Outgoing Shipper (Class 2)
D-2
D-1
D
A
A
A
A
A
A
CR
29Shipper Transfer with Class Change, Class 2 to 3,
DRE/AMR fitted, No Opening Read provided by
Incoming Shipper.
Transfer/Class Change Day
Incoming Shipper (Class 3 )
Outgoing Shipper (Class 2)
D-2
D-1
D
A
A
A
A
CR (E)
30Shipper Transfer with Class Change, Class 2 to 3,
No DRE/AMR fitted.
Transfer/Class Change Day
Outgoing Shipper (Class 2)
Incoming Shipper (Class 3)
A
A
A
A
A
A
31Same Shipper Class Change, Class 4 to 2
Class Change Day
Class 4
Class 2
D
N
A
N
Reconciliation
32Same Shipper Class Change, Class 4 to 2
Class Change Day
Class 4
Class 2
D
N
A
N
Reconciliation
33Same Shipper Class Change, Class 4 to 2
Class Change Day
Class 4
Class 2
D
N
A
N
Reconciliation
34Same Shipper Class Change, Class 4 to 2
Class Change Day
Class 4
Class 2
D
N
A
N
E
A
E
B
B
Reconciliation
If subsequent Actual reads following the Class
change date fail validation Estimated Reads will
be generated. When the next valid Actual is
received the estimated reads will be replace with
better estimates.
35Shipper Transfer with Class Change, Class 4 to 2,
DRE/AMR fitted, Opening Read provided by Incoming
Shipper.
Transfer/Class Change Day
Incoming Shipper (Class 2)
Outgoing Shipper (Class 4)
N
A
CR
36Shipper Transfer with Class Change, Class 4 to 2,
DRE/AMR fitted, No Opening Read provided by
Incoming Shipper.
Transfer/Class Change Day
Incoming Shipper (Class 2)
Outgoing Shipper (Class 4)
N
CR
CR(E)
37Shipper Transfer with Class Change, Class 4 to 2,
No DRE/AMR fitted.
Transfer/Class Change Day
Outgoing Shipper (Class 4)
Incoming Shipper (Class 2)
N
N
38Consumption Adjustments
- For Class 2, Consumption Adjustments can be
provided for - A day
- For a period - per day between two Check Reads
-
- Submission of a Consumption Adjustment for Class
1 and 2 Supply Meter Points will be via - Within Submission of GFD5 via Web Services
- Outside GFD5 through CMS
- Submission of Consumption Adjustments for Class 3
and 4 Supply Meter Points will be submitted via
CMS. - The Consumption Adjustments are provided as a
total between two read dates
39Faulty Asset Equipment End to End Process
Walkthrough
40Call-outs
An information only call out.
Denotes a change in the process.
A BRD reference.
40
41Apply Asset Fault Status (Input)
Fault Notified via SFN File for Class 3 4.
Class 1 2 via web portal.
If fault flagged in error submit a further SFN
File (3 4) or portal update (1 2) to advise
the Fault Notification was raised in error
SFN
SFR
This process flow is repeated in this
presentation to demonstrate input and output.
Supply Point Register BRD Ref 8.8
41
42Faulty Meter
If the fault has been applied in error the
suspended status is removed.
Read Validations are applied
Where a fault has been flagged the next read
submissions via the UMR/UDR or UBR read files
will be suspended.
Where a read is suspended a D -7 estimate for
Class 1 and 2 will be generated. If the Shipper
has raised the fault the DMSP will be notified.
UMR
UDR
Following a fault being flagged any read
suspended for Classes 2, 3 4 will be notified
via URS file. The notification will state Read
suspended due to fault flag.
Settlement BRD Ref 5.5, 5.6
UBR
42
43Apply Asset Fault Status (Output)
Where a Meter Exchange has been updated the meter
will be considered to be faulty. To receive a
consumption adjustment an RFA contact should be
raised via CMS for fault period between two reads.
Where a Corrector Exchange has been updated the
meter readings and previous check read will be
used to automatically reconcile the fault period.
The submission of RGMA ONJOB File to update a
Meter or Corrector Exchange will end date the
fault against the faulty asset. If the fault is
on the Daily Read Equipment, notification of the
site visit information will be required either
via the portal or the SFN file in order to end
the fault.
Where Daily Read Equipment is installed automatic
reconciliation will go back to the previous check
read using convertor reads or meter reads.
ONJOB
SFN
SFR
Note If a Meter or Converter Exchange is updated
for a day during the fault period it will be
treated as if the meter is faulty and a
consumption adjustment must be provided.
Note If you wish to correct the consumption
fault period within Exit Close out you can view
the portal for Class 1 2 sites.
Supply Point Register BRD Ref 8.8
43
43
44UK Link Programme Dashboard Report UKLIEF 24th
October 2014
Executive summary
- RAG status for the Programme remains at amber.
- The File Format consultation process remains on
track with final approvals targeted for 13/11. - Functional fit currently remains positive at
approximately c.80. - Residual activities to complete Detailed Design
are on track. - The UK Link Shipper Engagement Day was held on
02/10 the event was extremely well attended.
Recent Achievements
Future Priorities
- Phase 1 of the File Format Formal Consultation
process commenced, as per plan, on 30/09. The
File Format consultation process remains on track
with final approvals targeted for 13/11. - UK Link Shipper Engagement Day was successfully
held on 02/10 with over 100 Industry colleagues
attending. Feedback received from the event was
positive all Industry questions have been
responded to. - The release plan for non-shipper file formats has
been developed industry engagement approaches
are being agreed. - Two Transition mods (mod 514 and 515) have been
raised and are being progressed through their
respective working groups. Two further mods are
being progressed through the required governance
in order to raise to the Industry.
- Progress and close out the File Format
consultation process through the UK Link
Committee. - Progress System Test investigate and conclude
the assessment of whether Market Connectivity
Testing and Market Trials can be decoupled. - Ensure that suitable progress is made in data
cleanse activities through the Data Cleanse
Forum. - Continue to progress the To Be Process Walk
Throughs the current schedule will conclude in
December 2014. - Continue to work through the Market Trials
approach, scheduled for Industry communication
during Q1 2015. - Continue to progress the formal raising of
Transition mods through PNUNC. - Finalise the approach and plan for Non-Shipper
file format release.
2014 Q1
2015 Q1
2014 Q2
2014 Q3
2014 Q4
2015 Q2
2015 Q3
2015 Q4
Industry Engagement Comms
GO LIVE
Reporting Date
To-Be Processes
IDR Updates
31/3 Imp. Dates Outage Window
IE Comms.
02/10 Shipper Egt Day
30/11 Industry Go, No Go Straw Man
Programme Milestones
Key Milestone High Level Design Complete Detailed Design Complete Xoserve UAT Complete Industry Testing Start Cutover Implementation
Baseline Date 18/04/14 26/09/2014 28/05/15 01/06/15 01/10/15
Current Planned Date Complete 30/04/14 24/10/2014 28/06/15 01/06/15 01/10/2015
Aggregated Programme RAG
Key Dependencies
Risks
Risk Summary Impact Date Mitigation
Industry readiness Risk that there is a varied understanding within stakeholder organisations of Nexus requirements due to lack of or inconsistent attendance at industry forums. June 2015 Xoserves programme of industry engagement at all levels aims to level-set understanding. Terms of Reference in UKLIEF will avoid re-working topics agreed through PNUNC.
File Formats There is a risk that any changes to file formats as a result of the UKLC approval process (formal consultation and reps) may impact on the ability of the industry to deliver by Oct 2015 due to design re-work Nov 2014 Draft file formats released in August to give early sight and UKLP Engagement Day set up to focus on file formats in the context of business processes.
Market Testing Risk that Market Trials is insufficient in length, too late within the programme, and participants may not be ready in time to take part. June 2015 Xoserve are investigating the feasibility of de-coupling Market Connectivity Testing and Market Trials.
Dependency Date Required Impact if missed Status
Industry participants to cleanse Settlement data by December 2014 Dec 2014 Output from the Testing phase may produce unexpected results due to uncleansed data.
Industry (Shipper) agreement on Shipper file formats through UKLC Nov 2014 The programme will continue build and testing activities at risk.
Industry Stakeholders to complete their internal system builds Jun 2014 Industry may not be able to fully participate in the Market Trials phase
45iGT Single Service Provision non-effective days
to support cutover
- A presentation to
- iGT Shipper Workgroup 3rd November 2014
- UNC Nexus Workgroup 4th November 2014
- See also the iGT single service provision data
preparation and migration overview report
published on the Joint Office website
46iGT Single Service Provision non-effective days
to support cutover
- To move to the iGT Single Service provision
arrangements a number of activities are required - At some point the iGT systems must close
- There are then a number of activities to prepare
arrangements for the UK Link system
particularly around finalising the data for
migration. - The UK Link system will then open
- A period of time is required to prepare the UK
Link system. During this time supply point
register updates and supply point administration
communications cannot be made. - This does not mean that events cannot occur on
these days or that updates cannot be made that
are effective on these days.
47iGT Single Service Provision non-effective days
to support cutover
- Six non-effective days for the purpose of supply
point register (SPR) and supply point
administration (SPA) communications - This means that SPR and SPA communications cannot
be sent to an iGT on these days - The six days are September 25,26,27,28,29,30
- The last day a Shipper can send a SPR or SPA
communication to the iGT is Thursday 24th
September - From 1st October Shippers will send SPR and SPA
communications to the UK Link system
48iGT Single Service Provision non-effective days
to support cutover
- Why six days are needed
- Working back from 1st October 0500 hrs
- The data to support Gemini processes (balancing
etc) needs to be in Gemini for the start of day
D-2. D is 1st October, D-2 is 29th September
0600 - This means the data is loaded to Gemini on 28th
September - The source of the Gemini data is the Data
Preparation Database - The Data Preparation Database must have a final
position on 28th September circa 1300hrs - On 27th the data will be subject to check and
re-check, no new data will be added to the Data
Preparation Database on this day. (The final
shipper portfolio will be issued from this
closed-out position) - The last processing of data on the Data
Preparation Database is the 26th September - The last date iGTs can submit data is 25th
September - Therefore the last day the iGT can accept files
for processing for them prepare the final data
for submission to Xoserve is 24th September
49iGT Single Service Provision non-effective days
to support cutover
- What are the implications of this?
- The faster switching timescales, which create
the minimum period for a transfer (14 calendar
days starting from the day after the confirmation
file is received), will not apply for the six
days - To effect a change of shipper event on 9, 10, 11,
12, 13, 14 October the confirmation file must be
submitted to the iGT by 24 September - Any updates to the SPR e.g. asset update, meter
reading etc that would ordinarily be submitted
between 25 and 30 September will need to be
submitted to Xoserve from 1st October using the
new file formats. - There is no opportunity to back-date files. All
files processed from 1st October will be
processed and validated against the receipt date
of the file
50iGT Single Service Provision non-effective days
to support cutover
- Confirmation of SPA and SPR files processed pre
and post cut-over - SPA events that start in the iGT system and end
in UK Link will be migrated with no impact to the
event. However, Shippers need to be aware that
apparent unsolicited files will be received. - The effective date of any SPR updates processed
after 1st October will be maintained e.g. a meter
exchange on 25th September will be recorded as
having happened on the 25th September
51Illustration of cutover time period
52iGT Single Service Provision non-effective days
to support cutover
- Email address for questions
- externalrequests.spa_at_xoserve.com