Title: OMP PROGRESS REPORT
1OHare Airfield Configuration
EXISTING Airfield Configuration
FUTURE Airfield Configuration
2North Airfield Project Layout (by Contract)
NEW PERIMETER ROAD FENCING
MT. PROSPECT RD. / GUARD POST 1 RELOCATION
R/W 9L-27R PAVEMENT ELECTRICAL
R/W 9L-27R SITE PREPARATION
R/W 9L-27R NAVAIDS
90" JAWA WATER MAIN RELOCATION
(a)
90" JAWA WATER MAIN LINE STOP (HOT TAP)
DES PLAINES LAND ACQUISITION AREAS
ELK GROVE LAND ACQUISITION AREAS
(c)
(b)
LLWAS EXPANSION / RELOCATION 4 North Airfield
Locations
NORTH BASIN PUMP STATION
14L THRESHOLDDISPLACEMENT
AIRFIELD VAULTS ASSOCIATED DUCT BANKS (combined
w/South)
NORTH AIRFIELD ASR-9 (a) RTR P (b) RTR
Q (c)
NORTH AIRFIELD ARFF SERVICE ROAD
NORTHAIRPORT TRAFFIC CONTROL TOWER (NATCT)
AMERICAN AIRLINES PARKING LOT RELOCATION
Contract Awarded
Under Construction Contract Completed
3South Airfield Project Layout (by Contract)
R/W 10L PAVING ELECTRICAL
R/W 10L NAVAIDS
R/W 10L MASS GRADING
R/W 10C-28C CARGO TUNNEL EXTENSION
CARGO TUNNELS TAXIWAY 45
R/W 10C-28C MASS GRADING CONSTRUCTION (CENTRAL)
R/W 10L TAXIWAYS
R/W 10C-28C PAVING ELECTRICAL (EAST) R/W
10C-28C NAVAIDS
(c)
R/W 10C-28C PAVING ELECTRICAL (WEST)
10C BERMS 5 AND 6 10L SITE PREPARATION
(a)
R/W 10C-28C MASS GRADING (EAST)
CARGO APRON
(c)
(b)
SOUTH BASIN SITE PREPARATION
(d)
BENSENVILLE LAND ACQUISITION AREAS
SOUTH RTRSR S and LLWAS LLWAS (a) RTR R
(b) RTR S (c)
(b)
AIRFIELD VAULTS ASSOCIATED DUCT BANKS (combined
w/North)
SOUTH SERVICE ROADS
10C-28C CARGO AREA SITE PREPARATION
FUELING SYSTEM REPLACEMENT
UNITED CARGO BUILDING
FEDEX CARGO BUILDING
BENSENVILLEDITCH RELOCATION
ALTERNATE BENSENVILLEDITCH RELOCATION
Contract Awarded
Under Construction Contract Completed
INTERIM RAIL RELOCATION CARGO ACCESS RD
RAILROAD RELOCATION (4 Packages) RAILROAD METRA
SOUTH (a) RAILROAD INTERSECTION SOUTH TO METRA
(b) RAILROAD INTERSECTION NORTH (c) RAILROAD
INTERSECTION GRADE SEPARATION (d)
(a)
4Work in Progress Photography 10C Berms 5 6 and
10L Site Prep
Berms 5 and 6 facing Northeast.
Berms 5 6 facing North.
Compacting asphalt grindings for bituminous
paving of proposed service road.
Irving Park Road berm facing South.
5Work in Progress Photography South Basin Site
Prep
Placement of concrete pavement for Taxiway ZJ.
Phase 1B - Taxiway ZJ tie in.
Replacement of 66" Stormsewer above Stormsewer
System 1H.
Finishing of concrete pavement for Taxiway ZJ.
6Work in Progress Photography 10L Mass Grading
Excavating for CED Manholes facing South.
South face of Berm 3.
CED Manholes installed facing Northwest.
Crane at Jacking Location 3.
7Work in Progress Photography 10C-28C Mass Grading
Preparation of construction ramps.
Overall view of existing South Basin.
Stripping topsoil for storm sewer installation.
Embankment of construction ramps for access to
Stormsewer Systems E F.