1
Site report CERN
  • Helge Meinhard (at) cern ch
  • HEPiX fall 2004 _at_ BNL

2
Events
  • 50 years of CERN
  • 29 Sep LHC ring illumination
  • 16 Oct Open day at CERN 32000 visitors
  • 19 Oct Official ceremony with VIPs
  • CHEP Interlaken 27 Sep 01 Oct
  • Record-breaking attendance more than 500
  • Lot of work and lot of fun to see it all run well

3
Fabric Infrastructure and Operations (1)
  • Central Data Recording in full swing
  • Experiment peaks of 120 MB/s, combined average 10
    TB/day, 1.5 PB expected in 2004
  • Major problem with disk server stability
  • Finally whole batch, ie. 1200 disks (20 of our
    total disk count) replaced
  • Many stateful servers successfully quattorised
    (J. van Eldik)
  • Machine room refurbishment going on
  • LHS of machine room now empty, all machines and
    services moved to RHS and vault

4
(No Transcript)
5
Fabric Infrastructure and Operations (2)
  • New machines
  • 400 Farm machines being installed, alleviating
    pressure on batch farm
  • Awaiting 75 disk servers (360 TB SATA, 3Ware
    9500), plus 22 disk arrays (140 TB SATA,
    Infortrend, FC attachment)
  • System administration team taking over more
    specialised tasks and installations
  • Legato phased out, new machine for TSM coming

6
Fabric Infrastructure and Operations (3)
  • Media migration to 9940 completed, evaluations of
    new tape drives coming
  • Purchasing for 20062008 becoming clearer
  • Lxbatch field-proving Quattor again and again (T.
    Kleinwort)
  • Preparing for LSF 6

7
Architecture and Data Challenges (1)
  • Worked with FNAL on SL SLC3 in final phase of
    certification
  • Production-like systems for tests
  • Support from RedHat started in July
  • OpenLab
  • Voltaire joined as contributing partner
  • Project proposal on security
  • Disk server studies 4-way Itanium SIAB (Storage
    In A Box), 2 x 3Ware 9500, 24 SATA disks 750
    MB/s read, 340 MB/s write, 350 MB/s read over
    10GbE (J. Iven)

8
Architecture and Data Challenges (2)
  • New Castor successfully tested in full chain
  • OpenAFS High load on big servers revealed bugs
  • CERN providing fixes to OpenAFS
  • Still investigating migration to krb5
  • Consolidated HEPiX scripts released

9
Data Bases
  • Looking at Oracle 10g
  • Strong collaboration with Oracle (2 Oracle funded
    fellows in OpenLab)
  • DataGuard (disaster recovery and scheduled
    upgrades)
  • Oracle Streams (replication)
  • Preparing for a high-availability Oracle cluster
    (RAC) running under Linux
  • POOL passed real test with 400 TB of data (D.
    Duellmann)

10
Product Support (1)
  • Solaris 9 certification delayed, now targeted for
    end 2004
  • Moving target
  • Debugging took longer than expected, as did
    writing NCM components
  • Solaris will be much more in line with Linux than
    before
  • Will use software from Solaris Software Companion
  • Solaris security
  • Certification machines compromised three times
  • Awareness and requirements raised
  • Considering Ipfilter, AV software, and automatic
    security updates

11
Product Support (2)
  • CVS services
  • 100 projects, 14 GB of source code, 4 new
    projects/month
  • Some servers compromised by pserver exploit
  • Finer control of Web-based access required
  • Monitoring migrating from UIMON to Lemon (M.
    Schröder)
  • Transition to new desktop support contract
  • New contractor since 01 July
  • Licensing infrastructure (M. Schröder)

12
User and Document Services
  • Procedure rolling for new supply contract for
    CERN desktops
  • InDiCo (conference management tool) passed field
    test at CHEP with highest marks
  • Cern Computer Newsletter changed
  • Dedicated pages on computing in every other issue
    of CERN Courier
  • More technical and CERN-specific info in online
    CNL

13
Internet Services
  • Windows Terminal Server now production service
    (R. Gaspar)
  • SMS 2003 client deployed everywhere (R. Otto)
  • gt 100 new servers, Windows 2003 server
  • Mail
  • Secure (SSL) services for imap, pop, smtp as an
    option
  • Accepting mail requires successful reverse DNS
    lookup and successful smtp connect
  • Listbox service renewal (R. Gaspar)
  • Spam fighting, Exchange 2003 (R. Otto)

14
Security
  • Many incidents
  • Sasser worm, cvs breakin, Windows machines taken
    over by intruders, Solaris problems, lxplus root
    compromised,
  • Lessons
  • Tightening firewalls and patch handling
  • Dual-boot machines are problematic
  • Non-centrally managed machines are problematic
  • Visitors laptops are very non-centrally managed
  • Local Windows admin account forcefully secured by
    strong password
  • Viruses arrive at CERN faster than updated
    signatures
  • P2P activities often the source of problems

15
Miscellaneous
  • Grid Deployment moving ahead (I. Bird)
  • 82 sites, 9000 CPUs in LCG2
  • ACB (Automatic Call-Back) on its way out
  • Call-back and 0800 numbers stopped in July
  • Final switch-off end 2004
  • Pilot for IP telephony
  • Beam studies for the LHC à la SETI LHC_at_home
  • LCG service challenges (HEPiX Edinburgh)
  • LCG MoU being prepared