Title: Technical report for ISOLDE
1Technical report for ISOLDE
- Mats Lindroos on behalf of the ISOLDE team
2Outline
- Separator status
- REX
- Developments and integration status
- ISOLDE organization
- Responsibilities
- New staff
- Beam preparation activities
- EURISOL/EURONS news
- Recent technical development work
- ECR
- Shutdown planning
3GPS and HRS
- GPS operation limited to 30 kV since July
- Suspect problem with insulator
- Peek material better vacuum properties but
worse resistance to sparking - Operation with a single vacuum pump since late
July - To be replaced in March 2005
- Repair?
- HRS running well
- One vacuum pump replaced in October after failure
of both pumps (staggered in time) - Resolution of HRS limited by design fault
- Decision of the future of HRS in the upgrade
group - Second GPS or Real HRS
4Front-end 6
- Front-end 6 assembled
- Waiting for ceramic insulator
- To be tested in building 275 before installation
in March
5REX integration
- All (5) REX posts filled and successful shutdown
and maintenance executed in 2004 - Staff situation critical for peek need during
runs - Need for scheduled Machine Development (MD) time
for difficult beams - Technical support for low energy stage too low
- Operation team, supervisor team, must be formed
for on-call support and setting-up
6ISOLDE organization
AB
PH
ADM
ATB
BDI
BT
CO
OP
PO
RF
ABP
IS
- Technical coordination
- EURISOL coordination
- Target and ion source production
- Front-ends and robots
- ISOLDE experimental area
- Target RD
- REX integration
- RILIS
- Operation
- ISOLDE optics (electrostatic)
- TSO
- Alignment
- General technical support
- Application programs
- Scientific programme
- Scientific coordination
- Liaison with collaboration
- Liaison Users
- EURONS
- Future scientific strategy
- TARGISOL
New staff at ISOLDE tech. late 2004 Magnus
Eriksson (OP), Nikolai Trofimov (CO) and Pascal
Fernier (OP, 50)
7ISOLDE responsibilities
- ISOLDE PH
- ISOLDE Physics group leader
- Leads the scientific programme at ISOLDE
- Chairs the ISOLDE upgrade group
- CERN representative in the ISOLDE collaboration
committee - Responsible for the ISOLDE collaboration budget
- Responsible for external scientific collaboration
at ISOLDE - Leads the technical development for isotope
manipulation within EURONS and EURISOL at ISOLDE - CERN responsible for EURONS
- ISOLDE Physics coordinator
- Responsible for the ISOLDE schedule
- Responsible for ISOLDE User liaison
- Responsible for liaison with AB
- Scientific secretary for INTC
- ISOLDE AB
- ISOLDE technical coordinator (ATB)
- Coordinates ISOLDE operation, maintenance and
technical RD - Chairs the weekly coordination meeting
- Responsible for REX integration
8ISOLDE operation
- ISOLDE OP team
- 1 Physicist
- 2 technicians
- 50 of a technician
- Plan for 2005 run
- Operation with 5 person piquet team
- Technician available in the ISOLDE control room
for 4 hours each working day - 2 Technicians replace all additional support
earlier given by 2 technicians and 1 engineer
9EURISOL and EURONS
EURONS I3 1.5 MCHF Transnational Access 0.6
MCHF Joint Research Activities new staff mostly
in PH (DAQ, admin and RD) EURISOL DS 2.8
MCHF (CERN leads 3 tasks) new staff mostly in
AB (RD) EURONS EURISOL enable RD in
targets b-beam (AB) radioisotope
manipulation (PH) safety (SC)
10ISOLDE control system
- All applications except scanners and wire grids
available in LINUX - Problems
- Slow start-up
- Slow response
- Change of log book page each day
- Report bugs to Tim Giles
- Shutdown work
- Address response problems
- New applications for instrumentation and yield
measurements
11REX LE Developments in 2004
Element Charge A/q Breeding time (ms) Comments
9,11Li 2, 3 4.5, 3.0 5-8 Without/with stripper foil Ne and Ar buffer gases
24-29Na 7,8 3.43 4.14 15
28,30,31,32Mg 9,7,8,9 3.11-4.29 14-18
88Kr 21 4.19 38
74,76,78Zn 20,20,21 3.62 3.71 38 (2003)78 (2004)
122,124,126Cd 30,30,31 4.06 4.13 148
156Eu 30 5.2 38 Only RFQ 300 keV/u
153Sm 27,28 5.46-5.67 30 Only RFQ 300 keV/u
70Se 17 4.12 33 Molecular sideband
17F 5 3.4 8 With stripper foil
110Sn 27 4.07 98
148Pm 30 4.93 38? Only RFQ 300 keV/u
- New isotopes
- Molecular beams
- Rotating wall cooling
- No clear advantage compared to side band cooling
- New control system from GSI for trap
- Many thanks to GSI!
- Record charge breeding efficiency (Trap out to
EBIS out) - 23 for 39K10
Radioactive 110Sn into REXTRAP 110 pA after
REXTRAP 48 pA after mass sep. 115 pA in 27 98 ms
breeding time trap eff 44, EBIS eff 9
12REX linac developments in 2004
13Target and ion source development
- The very active target R D program in close
collaboration with experiments has always been
the secret of the success of the ISOLDE physics
programme - The tradition will continue, examples from 2004
- ISOLDE RILIS used for gt50 of all shifts, RD!
- Tests with solid state lasers off-line (Mainz
univ.) - Negative ion source (ISOLDE and KENIS, ORNL)
- Measurement of transverse shockwaves with tests
with laser vibrometer - New target materials
- LaCx synthesized
- SiCx from TRIUMF tested
- Note 3 FTE per new element/isotope!
- User support essential to advance many
developments - Strongly integrated with ISOLDE EU activities
14Beam preparation at ISOLDE
- Successful charge breeding with an ECR Phoenix
source at ISOLDE of radioactive ions - Major problem with background to be addressed in
6th framework programme - The beam preparation activities move to the PH
ISOLDE physics group in 2005 - RFQ cooler activity continues in AB-ATB to
complete started project - EURON fellowship and EURISOL beam preparation
post to work on these activities
Successful charge breeding of 94Rb14,
96Sr13,14,15, (130Inx and 130Csx) 46,47,48Ar,
92xxKr and 138,142,144Xe Efficiency
estimates 96Sr15 2.6-3.7 efficiency 96Sr14
2.9-4.2 efficiency 96Sr13 2.2-3.0
efficiency IS 400, Beam purification of noble gas
beams
15Shutdown
- Shutdown planning established
- Key dates
- End of run 11/11/2004 am
- Shutdown courses 29/11-10/12
- Stable beam stop 10/12
- No cooling water (possible power cuts)
10/12-18/1 - Start of off-line running 21/3
- Start-up of physics programme 25/4
- Key tasks
- Installation of new front-end
- Repair of REX EBIS magnet
- Wall removed between extension and hall
- Dust barrier being installed
- Schedules at ISOLDE web site and at REX web site
- CERN schedule holds several key dates even for
ISOLDE!