Title: CERN Safety Alarm Monitoring
1CERN Safety Alarm Monitoring
- Presented by Luigi Scibile
- ST division / MO group
2Introduction
CERN
Safety information
Alarm system
Monitoring system
3Introduction
CERN Safety Alarm Monitoring
CSAM
4Background
Fire CDIN-00052 B104-R-02
Hard-wired network
Computer-based network
Whats next ?
Detection equipment
5CSAM Mandate
- The CSAM will provide CERN with an integrated
safety alarm system covering acquisition,
transmission, logging and display for all the
CERN sites, the LHC machine, LHC experiments and
experimental areas. The system will be
incorporated into the safety, technical,
accelerator, and experiment control rooms. - The requirements of the system were defined by
the AL3S working group. - The mandate of the project team covers the system
specification, prototyping, tendering,
installation and integration of the product in
the existing monitoring architecture.
Safety alarms require the immediate
intervention of the fire brigade and are defined
at CERN as 'Alarms of Level 3' (AL3S)
6CSAM Specification
- For the Fire Brigade
- Safety alarm acquisition from all CERN safety
zones - Local monitoring from each safety zone
- Central monitoring, archiving, display, reporting
and configuration - Non-interruptible 24h/365d system based on
redundant networks - Specific human computer interfaces and tools for
the alarm handling - Real-time monitoring of the correct functioning
of all sub-systems. - For the Experiments and the other control rooms
- A safety alarm gateway to external systems
- A flexible system architecture for the
integration of the LHC and LHC experiments future
alarms. - A modular acquisition and local monitoring system
based on standard industrial equipment
7CSAM Specification, cont.
- No common mode of failure
- Power supply, Location, server, display,
acquisition module,etc. - INB compliant system based on redundant
transmission paths. - Availability requirements
- In order to meet the availability requirements of
? 99.8 set by the AL3 Working Group, a Safety
Integrity Level (SIL) 2 has been fixed. - A supervision and monitors the availability of
all sub-systems and generates performance
reports.
8CSAM specifications, cont.
Functional diagram
9CSAM specifications, cont.
Safety alarm monitoring centre
Safety alarm gateway to external systems (TDS,
experiments, XCR, etc.)
PVSS
Safety alarm networks
CSAM supervision maintenance manager
PVSS
x33
Local safety alarms controller
Technical Data Server (TDS)
CERN safety equipment
10CSAM-experiments interface
Safety alarm gateway to external systems (TDS,
experiments, XCR, etc.)
Safety alarm Monitoring centre
SCR SCADA
Experiments DCS
- How
- Data exchange protocol
- JCOP conventions
- For the XCR operators
- Only Safety Alarms and safety-related information
concerning their experiment. - Also analogue values of safety equipment.
- Possible seamless integration in the experiment
DCS
Local XCR console
Experiments
11CSAM animation scenario
Safety alarm gateway to external systems (TDS,
experiments, XCR, etc.)
Safety alarm Monitoring centre
SCR SCADA
Experiments DCS
Local safety alarms controller
Technical Data Server (TDS)
Local XCR console
CERN safety equipment
Experiments
12Current system
13Future systems
14Current System
15Current System
16Current system
17Future system
4 alarms
18Future system
19Future system
151615 Flooding Det. INOND-863-E-T
SPS-B-862-R-05 Flooding Detected
came
151615 Flooding Det. INOND-863-E-T
SPS-B-862-R-05 Flooding Detected
came
20Prototype
21What has been done ?
- Analysis of technical solutions
- IEC61508 standards
- Prototype
- Technical specifications including
- User requirements
- Functional and safety requirements
- Product requirements
- Interface requirements
- Approval of the finance committee
22Whats next?
- Detailed design and testing during year 2001
- Pilot installation planned for APRIL 2002
- Deployment of product on the CERN site in
accordance with the LHC and LHC experiments
schedule
23Additional information
- Papers
- S. Grau, P. Ninin, R. Nunes, L. Scibile, C.
Soler, CERN Safety Alarm monitoring Project, 3rd
ST workshop Chamonix, February 2000. - L.Scibile, P.Ninin, S.Grau, Functional Safety a
Total Quality Approach, 4st WS Chamonix, 2001. - S. Grau, L. Scibile, F. Balda, A. Chouvelon,
Application of risk management for control and
monitoring systems, 4rd ST workshop Chamonix,
February 2001. - Visit the CSAM Homepage
- http//nicewww.cern.ch/st/mo/CSAM/CSAM.htm
- Just come and see us!