Run6 pp_at_62 GeV
  • BRAHMS strongly favor Plan A (current schedule)
  • PHYSICS priorities set by PAC It is important
    to complete the 2-3 week 62 GeV p-p running, both
    for heavy ion comparison and equally important
    the single spin asymmetries AN at lower energy.
    BRAHMS should definitely run during this time
  • ONLY CHANCE (last run for BRAHMS) to measure
    identified charged particle spectra at forward
    rapidities
  • at 62 GeV reference spectra and pQCD studies
  • STRONG Theoretical interest Flavor-dependent
    Single Spin Asymmetries at high-xF at 62 GeV
  • Any significant loss of beam time due to summer
    weather
  • or unexpected machine issues will NOT be
    recovered if the
  • run is scheduled at the end of the run (plan B).

2
Scheduling Issues
  • Collaboration has planned for Plan A
  • People already changed their schedules to
    accommodate Plan A (June 6-) from the original
    run plan (May 26-)
  • Significant contribution (detector experts and
  • shift crews) to Run6 from European
    collaborations
  • Extra scheduling and financial hardship with Plan
    B traveling, housing, rental cars