NASA Johnson Space Center, Houston, Texas. Institutional ... HQ delegation to JSC to lead a HQ audit will be through the S&MA Director and the JSC IA Office ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 16
Provided by: NASA3
Category:

less

Transcript and Presenter's Notes

Title: JSC Center Perspective


1
  • JSC Center Perspective
  • on
  • Institutional/Facility/Operational Audit
  • Programmatic Audit Review
  • SMA Readiness Review
  • 2005 SMA Compliance Verification Workshop
  • September 14, 2005

2
Institutional/Facility/Operational (IFO) Audit
3
  • HQ-led IFO Audit
  • JSC Audit was held on April 4-8, 2005
  • JSC Organizations Involved
  • SMA, Center Operations, Mission Operations,
    Engineering, Procurement
  • Audit Results
  • 19 Non-compliances
  • 36 Observations
  • 11 Commendations
  • Follow-on Activities to Audit
  • Responding to findings via a Corrective Action
    Plan which will be submitted to OSMA
  • Follow-on status reports of long-term corrective
    and preventive actions to OSMA will be provided
    every 60 days

4
  • Center-led IFO Audits
  • SMA Office, Center Operations Directorate, and
    Engineering Directorate are working collectively
  • SMA Director is engaged in the IFO SMA Audit
    activities
  • Agency level requirements flow-down to Center
    implementation work instructions and processes
    are being tracked
  • JSC Procedural Requirements Document will be
    developed
  • Results from other reviews such as OSHA and VPP
    will be used to determine future audits

5
  • Recommendations for Improvement
  • Keep the Agency Audit Team highly competent -- no
    more than necessary to perform an effective IFO
    Safety Audit
  • Document findings relative to systemic problems
    rather than each incident
  • Audit planning should be done by the Audit Team
    in a timely manner to avoid last minute requests
    during on-site visit
  • Identify the time frame after the audit is
    complete for submittal of the Final Report by the
    Audit Team
  • Allow 60 days for Centers response to the Final
    Report
  • Periodic status to OSMA every 6 months to align
    with the SMA Directors Quality Management
    System Review
  • Educate the SMA Community on the Institutional
    Program Support (IPS) activity when details are
    made available by OSMA RAD

6
Programmatic Audit and Review (PAR)
7
  • HQ-led PAR Activity
  • JSC SMA Director is engaged in the PAR
    activities
  • Support to the Program SMA Managers in providing
    the corrective action plan to OSMA findings will
    be provided as needed
  • Center subject matter experts identified by OSMA
    will participate in the HQ-led Audit Teams
  • Center support will be provided to the OSMA Audit
    Team during the on-site visit
  • HQ delegation to JSC to lead a HQ audit will be
    through the SMA Director and the JSC IA Office

8
  • Current Status of PAR Activity
  • JSC SMA Director designated the JSC Independent
    Assessment Office (JSC IAO) as the focal point
    for PAR activity
  • JSC IA Office
  • Participated in the 2004 Compliance Verification
    Workshop
  • Provided comments to OSMA requirements and
    processing documents
  • Participated in the NASA HQ PAR Coordination
    Meeting held on August 24-25, 2005
  • Held sessions with Center SMA and Program SMA
    Managers which resulted in a list of candidates
    for HQ-led and/or Center-led PAR activities

9
  • Center-led PAR Activity
  • JSC IA Office Strategies for FY06 include PAR
    activities, technical assessments and process
    assessments
  • Mission Readiness Process Assessment chartered by
    the Center SMA Director is an example of a
    Center-led PAR using JSC IA Office resources
  • Results from on-going Mission Analysis and
    Readiness activities will provide insight to
    program risks and potential PAR areas
  • Prioritization of Center-led PAR activity based
    on discussions held with SMA Director, SMA
    Division Chiefs, and Program SMA Managers
  • Resources and skill mix requirements in work
    (SAIC, Aerospace, and NASA Contract Assurance
    System (NCAS))
  • JSC Procedural Requirements (JPR) and work
    instructions will be developed
  • Closed-loop corrective action plan will be
    developed

10
  • Recommendations for Improvement
  • HQ-led PAR
  • The Program SMA Managers and Program/Project
    Managers should be accountable for the PAR
    process for their respective programs/projects
    and involve the Center SMA as needed
  • Provide closed-loop corrective action plan and
    periodic status to OSMA
  • Get beyond the notional concepts to
    implementation
  • OSMA Audit Plan and Schedule needed
  • Adequate resource planning is difficult to
    project
  • Define the PAR Planning Board process and the
    roles of its members
  • Provide detailed prioritization criteria for
    audit activity
  • Educate the SMA Community on the Institutional
    Program Support (IPS) activity when details are
    made available by OSMA RAD

11
  • Issues and Concerns
  • Center-led PAR
  • Reduction in FY06 funds will impact PAR activity
  • Threat of additional reductions due to NASA Lean
    Governance (Corporate GA)
  • Adequate resource planning is difficult to
    project

12
Safety and Mission Assurance Readiness
Review(SMARR)
13
  • HQ-led SMARR
  • JSC provides support and participates in
    Pre-SMARR and SMARR for Shuttle, ISS and Soyuz
  • JSC SMA Director polled for a recommendation to
    proceed
  • Program SMA Managers chair Shuttle and ISS SMA
    Panels in preparation for SMARR activity
  • JSC IA Office
  • Identifies Program risks for Shuttle, ISS and
    Soyuz
  • Compiles topic lists that are used as a baseline
    for the SMARR agendas
  • Identifies issues or residual risks relative to
    the mission based on technical and process
    assessments performed
  • Polled for a recommendation to proceed

14
  • Center-led SMARR
  • JSC SMA Director delegated to manage ISS
    Progress activities and chairs the SMARR
  • JSC SMA Director chairs the Safety and Mission
    Assurance Technical Review Board (STR Board)
  • Prepares the SMA Director for SMARR and other
    readiness reviews
  • JSC IA Office
  • Facilitates the Progress Pre-SMARR and SMARR
    activities
  • Identifies Program risks for Progress
  • Compiles topic lists that are used as a baseline
    for the SMARR agendas
  • Identifies issues or residual risks relative to
    the mission based on technical and process
    assessments performed
  • Polled for a recommendation to proceed

15
  • JSC Center Perspective Summary
  • Center SMA commits to support IFO, PAR and
    SMARR activities
  • Plans and processes in work for Center-led IFO
    and Center-led PAR activities
  • On-going surveillance, supplier, process and
    documentation audit results will be provided to
    OSMA for audit decisions, plans and schedules
  • Resources and skill mix requirements will be
    identified
  • JSC IA Office will continue to support OSMA RAD
    and serve as the Centers focal point for audit
    activities