ESTIMATOR AND DECISION SUPPORT SYSTEM (DSS) DATABASE - PowerPoint PPT Presentation

1 / 39
About This Presentation
Title:

ESTIMATOR AND DECISION SUPPORT SYSTEM (DSS) DATABASE

Description:

ESTIMATOR AND DECISION SUPPORT SYSTEM (DSS) DATABASE. BIGHORN RIVER-HARDIN ... Contract Plans Refines Engineer's Estimates using the following 'Tools' Final ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 40
Provided by: U554
Learn more at: http://www.mdt.mt.gov
Category:

less

Transcript and Presenter's Notes

Title: ESTIMATOR AND DECISION SUPPORT SYSTEM (DSS) DATABASE


1
ESTIMATOR AND DECISION SUPPORT SYSTEM (DSS)
DATABASE
2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
BIGHORN RIVER-HARDIN
  • ESTIMATOR AND DECISION SUPPORT SYSTEM (DSS)
    DATABASE
  • PRELIMINARY FIELD REVIEW ESTIMATE
  • JUNE 1999 2,585,000
  • FINAL ESTIMATE AT READY DATE
  • SEP 2003 4,117,500
  • FINAL ENGINEERS ESTIMATE
  • DEC 2005 4,764,819
  • AWARD AMOUNT 5,781,911

17
REFINING ENGINEERS ESTIMATES
  • Contract Plans Refines Engineers Estimates using
    the following Tools
  • Final Design Estimate
  • Project Item Worksheets-Lump Sum Items
  • Additional Pay Items That May Be Added
  • Estimator
  • DSS Bid History
  • District Project Estimate Questionnaire
  • Board of Review

18
DETOUR COST ESTIMATE-LUMP SUM ITEM
19
PAY ITEMS THAT MAY BE ADDED TO CONTRACTS- ITEMS
NOT GENERALLY SHOWN IN SUMMARIES
20
ESTIMATOR
21
DSS BID HISTORY
22
DISTRICT PROJECT ESTIMATE QUESTIONNAIRE
  • Traffic Control Type-Lump Sum or Devices
  • Erosion Control
  • Construction Engineering Precentage
  • Working Days
  • Other Project Specific Requirements

23
DISTRICT PROJECT ESTIMATE QUESTIONNAIRE
24
BOARD OF REVIEW
  • Board is made up of representatives from Contract
    Plans, Preconstruction, Construction, Materials
    and District Personnel
  • The 80/20 Rule, also known as the Pareto
    Principle, was originally developed in 19th
    Century England by Vilfredo Pareto based on an
    observation that 80 percent of the wealth in
    society was enjoyed by 20 percent of the people.
    Since then, the 80/20 Rule has been used to
    express many things.
  • 80 of Project Cost is represented in top 20 of
    pay Items

25
(No Transcript)
26
BOARD OF REVIEW
  • Excavation or Embankment Prices
  • Unclassified or Special Borrow
  • Crushed Aggregate Course
  • Plant Mix Surfacing
  • Hydrated Lime
  • Traffic Control
  • Mobilization
  • Miscellaneous Work
  • Working Days
  • Construction Engineering percentage

27
BOARD OF REVIEW SHEET
28
MOBILIZATION AND CONSTRUCTION ENGINEERING
GUIDELINES(PERCENTAGE OF TOTAL PROJECT COST)
29
(No Transcript)
30
Select Catalogs\Change Passwords
31
Project Level Window
32
Category Level Window
33
Item Level Window
34
Find Item
35
Find Item Expert Mode
36
Item Bid History Graph
37
Printing Estimates-Title Sheet
38
Printing Estimates - SOI
39
Questions?