Title: Introduction to Naval Aviation
1CAPT John Hooter Breast
CVN 21 Requirements Officer
Tailhook 2009 11 September 2009 Aircraft Carrier
Programs Update
2Aircraft Carrier Roadmap
- LARGE-DECK, NUCLEAR- POWERED CARRIERS
- CORNERSTONE OF NAVAL AVIATION
- IMMEDIATE, FIRST DAY OF THE WAR RESPONSE
- LONG ENDURANCE ON STATION, SELF-RELIANT
- CVN 21 PROGRAM (CVN 78-CLASS)
- IMPROVED REACTOR, ELECTRICAL AUXILIARY SYSTEMS,
EMALS - NEARLY 300 INCREASE IN ELECTRICAL POWER
GENERATION - STATE-OF-THE-ART C2, LARGER FLIGHT DECK, AND
ADVANCED ARRESTING GEAR
TODAY NIMITZ-CLASS
2020 FORD-CLASS
3USS ENTERPRISE (CVN 65)
- Extended Docking Selected Restricted Availability
(EDSRA) - Inactivation (Nov 12)
4USS NIMITZ (CVN 68)
5USS DWIGHT D. EISENHOWER (CVN 69)
6USS CARL VINSON (CVN 70)
- Post Shakedown Availability/Selected Restricted
Availability (PSA/SRA)
7USS THEODORE ROOSEVELT (CVN 71)
- Refueling Complex Overhaul (RCOH)
8USS ABRAHAM LINCOLN (CVN 72)
- Planned Incremental Availability (PIA)
9USS GEORGE WASHINGTON (CVN 73)
10USS JOHN C. STENNIS (CVN 74)
11USS HARRY S TRUMAN (CVN 75)
12USS RONALD REAGAN (CVN 76)
13USS GEORGE H.W. BUSH (CVN 77)
- Post Shakedown Availability/Selected Restricted
Availability (PSA/SRA)
14Aircraft Carrier Build Schedule
15Aircraft Carrier Build Schedule
16Why CVN 21 Program?
CVN 68-Class
CVN 78-Class
Increased Capability
Increased Flexibility
Increased Affordability
- Greater operational availability
- 3X electric plant capacity
- Sortie Generation Rates increased by 25
- 5B TOC reduction
- 500-900 billet reduction
- Survivability improvements
- Damage Control improvements
- Improved ship self-defense
- Increased magazine and AVGAS storage
- Interoperability (IER)
- Reduced construction costs
- Maintenance requirements reduced by 30
- Product Model Design
- Flexibility of open architecture
- Restoration of Service Life Allowances (Wt/Kg)
- Integration of future air platforms
Marks the first investment in a new design
aircraft carrier in 40 years!
17CVN 78-class A Leap Ahead
Enhanced Flight Deck
- Advanced Arresting Gear
- Electromagnetic Aircraft Launch System
18Electromagnetic Aircraft Launch System(EMALS)
Description and Status
- Electric power replacement for steam catapult
- Still operating with steam cats for next 50
years - EMALS integral to CVN 78 design
- Not backfittable in NIMITZ hulls
- Benefits
- Eliminates steam requirement
- Reduced manpower to operate/maintain
- Expanded launch weight range
19The EMALS System
Generator Rectifier / inverter
Block switch Motor block
DC Link
PPI and ESS (Motor Generator) Titan/L3Com
Kato
LM (Block Switched LIM) GA
PCS (Rectifier) (Inverter) Titam/L3Com GA
20EMALS Test Site, Lakehurst NJ
Forward Below Grade Building PCS Inverters
(24) PCS Motor Controller (4) Launch Sequence
State Machine
Aft Below Grade Building LCS LCO Station LCS LCM
Station
Trench EDS Cabling
Trough Mounting Hardware
Control Building PPIS Transformer/Rectifier
(1) PPIS Inverter (4) ESS Motor/Generator (4) ESS
Generator Control Tower (4) ESS SEEPS (4) PCS
Rectifier (12) Health Maintenance Monitoring
System (1) EMALS Server (1)
21Advanced Arresting Gear
- Benefits Manpower reduction, 5kt less WOD,
Reliability
22AAG System Overview
Cross Deck Pendant
Purchase Cable
Mechanical Brake Engineered Arresting Systems Co.
(ESCO)
Water Twister (ESCO)
Electric Motor (Curtiss Wright)
Cable Drum General Atomics (GA)
Capacitor Banks
Power Conditioning System (GA)
Shock Absorber (GA)
Control System- Foster Miller Inc. (FMI) and
HealthMap (GA)
Energy Dumps
Inverters
23A Transformational Island
Optimized Antenna Arrangement Compartmentation
Multi-Function Radar (MFR)
Investigating Lightweight Materials Applications
Volume Search Radar (VSR)
MFR at Wallops Island, VA
- Successful Single Face Radiation Aug 03-
Second Face Due to Arrive by Oct 03- Commence
Acceptance Testing Oct 03- Commence DT Apr 04
Adaptive Infrastructure Design
Joint Precision Approach Landing System (JPALS)
New S-Band Radar Specs Will Meet CVN Top Level
Requirements for Air Search and Air Traffic
Control
Reduced Volume and Weight
Relocated Inboard and Aft With a 25 Footprint
Reduction
24CVN 78 Construction Status
GERALD R. FORD (CVN 78) propeller shafts in
machine shop
The FORDs first lift was of a side shell unit
Structural Unit Construction On Final Assembly
Platen
25CVN 78 Construction Status
26Carrier Air Wing of the Future
- NOTIONAL CVW OF THE FUTURE COMPRISED OF
- 44 STRIKE FIGHTER (FA-18, F-35, FA-XX) AIRCRAFT
- 8 - 10 UNMANNED COMBAT AIR SYSTEM (N-UCAS)
AIRCRAFT - 5 EA-18G AIRBORNE ELECTRONIC ATTACK (AEA)
AIRCRAFT - 5 E-2D ADVANCED HAWKEYE AIRCRAFT
- 19 MH-60R/S HELOS (11 ON THE CARRIER/8 DISPERSED
THROUGH THE CSG) - 2 CARRIER ONBOARD DELIVERY (COD) AIRCRAFT AUGMENT
THE ENTIRE CSG
27Questions?