Introduction to Naval Aviation - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

Introduction to Naval Aviation

Description:

U.S. Marines are currently deployed to Southwest Asia in support of Operations ... (U.S. Marine Corps photo by LCpl Andrew Williams) ... – PowerPoint PPT presentation

Number of Views:389
Avg rating:3.0/5.0
Slides: 28
Provided by: tail
Category:
Tags: aviation | ecam | feh | firing | foh | headline | introduction | irq | isna | ksa | lem | maw | mij | mir | naval | pah | pry | raen | upi | wpi | xa | xap | xo

less

Transcript and Presenter's Notes

Title: Introduction to Naval Aviation


1
CAPT John Hooter Breast
CVN 21 Requirements Officer
Tailhook 2009 11 September 2009 Aircraft Carrier
Programs Update
2
Aircraft Carrier Roadmap
  • LARGE-DECK, NUCLEAR- POWERED CARRIERS
  • CORNERSTONE OF NAVAL AVIATION
  • IMMEDIATE, FIRST DAY OF THE WAR RESPONSE
  • LONG ENDURANCE ON STATION, SELF-RELIANT
  • CVN 21 PROGRAM (CVN 78-CLASS)
  • IMPROVED REACTOR, ELECTRICAL AUXILIARY SYSTEMS,
    EMALS
  • NEARLY 300 INCREASE IN ELECTRICAL POWER
    GENERATION
  • STATE-OF-THE-ART C2, LARGER FLIGHT DECK, AND
    ADVANCED ARRESTING GEAR

TODAY NIMITZ-CLASS
2020 FORD-CLASS
3
USS ENTERPRISE (CVN 65)
  • Extended Docking Selected Restricted Availability
    (EDSRA)
  • Inactivation (Nov 12)

4
USS NIMITZ (CVN 68)
  • Deployment 2009

5
USS DWIGHT D. EISENHOWER (CVN 69)
  • Deployment 2009

6
USS CARL VINSON (CVN 70)
  • Post Shakedown Availability/Selected Restricted
    Availability (PSA/SRA)

7
USS THEODORE ROOSEVELT (CVN 71)
  • Refueling Complex Overhaul (RCOH)

8
USS ABRAHAM LINCOLN (CVN 72)
  • Planned Incremental Availability (PIA)

9
USS GEORGE WASHINGTON (CVN 73)
  • Forward Deployed - Japan

10
USS JOHN C. STENNIS (CVN 74)
  • Deployment 2009

11
USS HARRY S TRUMAN (CVN 75)
  • Work-ups/Deployment 2009

12
USS RONALD REAGAN (CVN 76)
  • Deployment 2009

13
USS GEORGE H.W. BUSH (CVN 77)
  • Post Shakedown Availability/Selected Restricted
    Availability (PSA/SRA)

14
Aircraft Carrier Build Schedule
15
Aircraft Carrier Build Schedule
16
Why CVN 21 Program?
CVN 68-Class
CVN 78-Class
Increased Capability
Increased Flexibility
Increased Affordability
  • Greater operational availability
  • 3X electric plant capacity
  • Sortie Generation Rates increased by 25
  • 5B TOC reduction
  • 500-900 billet reduction
  • Survivability improvements
  • Damage Control improvements
  • Improved ship self-defense
  • Increased magazine and AVGAS storage
  • Interoperability (IER)
  • Reduced construction costs
  • Maintenance requirements reduced by 30
  • Product Model Design
  • Flexibility of open architecture
  • Restoration of Service Life Allowances (Wt/Kg)
  • Integration of future air platforms

Marks the first investment in a new design
aircraft carrier in 40 years!
17
CVN 78-class A Leap Ahead
Enhanced Flight Deck
  • Advanced Arresting Gear
  • Electromagnetic Aircraft Launch System

18
Electromagnetic Aircraft Launch System(EMALS)
Description and Status
  • Electric power replacement for steam catapult
  • Still operating with steam cats for next 50
    years
  • EMALS integral to CVN 78 design
  • Not backfittable in NIMITZ hulls
  • Benefits
  • Eliminates steam requirement
  • Reduced manpower to operate/maintain
  • Expanded launch weight range

19
The EMALS System
Generator Rectifier / inverter
Block switch Motor block
DC Link
PPI and ESS (Motor Generator) Titan/L3Com
Kato
LM (Block Switched LIM) GA
PCS (Rectifier) (Inverter) Titam/L3Com GA
20
EMALS Test Site, Lakehurst NJ
Forward Below Grade Building PCS Inverters
(24) PCS Motor Controller (4) Launch Sequence
State Machine
Aft Below Grade Building LCS LCO Station LCS LCM
Station
Trench EDS Cabling
Trough Mounting Hardware
Control Building PPIS Transformer/Rectifier
(1) PPIS Inverter (4) ESS Motor/Generator (4) ESS
Generator Control Tower (4) ESS SEEPS (4) PCS
Rectifier (12) Health Maintenance Monitoring
System (1) EMALS Server (1)
21
Advanced Arresting Gear
  • Benefits Manpower reduction, 5kt less WOD,
    Reliability

22
AAG System Overview
Cross Deck Pendant
Purchase Cable
Mechanical Brake Engineered Arresting Systems Co.
(ESCO)
Water Twister (ESCO)
Electric Motor (Curtiss Wright)
Cable Drum General Atomics (GA)
Capacitor Banks
Power Conditioning System (GA)
Shock Absorber (GA)
Control System- Foster Miller Inc. (FMI) and
HealthMap (GA)
Energy Dumps
Inverters
23
A Transformational Island
Optimized Antenna Arrangement Compartmentation
Multi-Function Radar (MFR)
Investigating Lightweight Materials Applications
Volume Search Radar (VSR)
MFR at Wallops Island, VA
- Successful Single Face Radiation Aug 03-
Second Face Due to Arrive by Oct 03- Commence
Acceptance Testing Oct 03- Commence DT Apr 04
Adaptive Infrastructure Design
Joint Precision Approach Landing System (JPALS)
New S-Band Radar Specs Will Meet CVN Top Level
Requirements for Air Search and Air Traffic
Control
Reduced Volume and Weight
Relocated Inboard and Aft With a 25 Footprint
Reduction
24
CVN 78 Construction Status
GERALD R. FORD (CVN 78) propeller shafts in
machine shop
The FORDs first lift was of a side shell unit
Structural Unit Construction On Final Assembly
Platen
25
CVN 78 Construction Status
26
Carrier Air Wing of the Future
  • NOTIONAL CVW OF THE FUTURE COMPRISED OF
  • 44 STRIKE FIGHTER (FA-18, F-35, FA-XX) AIRCRAFT
  • 8 - 10 UNMANNED COMBAT AIR SYSTEM (N-UCAS)
    AIRCRAFT
  • 5 EA-18G AIRBORNE ELECTRONIC ATTACK (AEA)
    AIRCRAFT
  • 5 E-2D ADVANCED HAWKEYE AIRCRAFT
  • 19 MH-60R/S HELOS (11 ON THE CARRIER/8 DISPERSED
    THROUGH THE CSG)
  • 2 CARRIER ONBOARD DELIVERY (COD) AIRCRAFT AUGMENT
    THE ENTIRE CSG

27
Questions?
Write a Comment
User Comments (0)
About PowerShow.com