Title: Document: ECLVIDoc'18'45


1
Review ofthe WMO Programme Support
CostArrangement
  • Document EC-LVI/Doc.18.4(5)
  • Executive Council
  • Fifty-Sixth Session
  • Geneva 2004

2
Review of the WMO Programme Support Cost
Arrangements
  • Fourteenth Congress requested
  • the Secretary-General to report to EC-LVI on the
    outcome of the review of the current WMO
    programme support cost arrangement
  • EC to approve a revised approach with a view to
    charging appropriate rates of programme support
    costs to donors.

3
Background
  • United Nations system-wide need for a
    coordination of programme support cost policies
  • Joint Inspection Unit (JIU) report on programme
    support costs in 2002
  • WMO standard cost recovery rate of 14 not
    systematically applied
  • Reduction in XB funding
  • Reduction in average recovery rate

4
Current support cost arrangements
  • Programme support for WMO-administered trust
    funds
  • Technical co-operation programmes financed from
    voluntary contributions totalling CHF 35.2
    million for 2002-2003.
  • charged support costs at 14 of direct
    expenditures in theory
  • due to waivers actual recoveries are less than 9
    in practice
  • Normative programmes funded from voluntary
    contributions totalling 4.4 million per
    2002-2003.
  • support costs charged at 0 to 13 with the
    average about 6.9
  • B. Programme support for Joint Activities (GCOS,
    IPCC, JCRF)
  • Project volume of CHF 22.1 million in 2002-2003.
  • Not charged for support costs
  • WMO support costs estimated at CHF 0.8 million in
    2002-2003

5
Cost Study Methodology
  • Methodology used for cost measurement studies
    carried out in United Nations system
    organizations since 1990
  • Questionnaire completed by general service staff
    from G4 to G7 and professional staff from P3 to
    D2
  • Other work load statistics
  • Fixed and variable costs

6
New arrangement Fixed costs
  • Definition Costs incurred by the Organization
    under the regular budget, regardless of the
    implementation of additional XB activities.
  • The new programme support cost arrangement
    provides for funding of fixed costs entirely
    under the regular budget.

7
New arrangement Variable Costs
  • Definition Costs that are incremental to fixed
    costs and are required as a result of
    implementation of XB activities.
  • The new programme support cost arrangement is
    geared towards the recovery of variable costs
    only.

8
Result of the cost measurement
  •     

9
Proposed recovery rates
  • Technical cooperation FIT projects
  • Standard rate of 13
  • Reduction by up to 2 if donors assumes
    responsibilities
  • Reduction by 1 for simplified reporting
  • Separate rate of 9 for procurement only TC FIT
  • Normative FIT projects
  • 7 rate for normative FIT which supplement
    regular programme

10
Current and proposed recovery rates compared
11
Proposed actions
  • Charging WMO costs directly to project budgets
    whenever practicable
  • Measures to be taken for compensation for the
    support costs incurred for GCOS, IPCC and JCRF
  • Arrangement to protect WMO from the currency risk
  • Report to EC-LVIII in 2006 on the progress made
  • EC is invited to adopt the draft resolution which
    summarises the recovery rates.