APEX Schedule March 8 2006

Description:

Experiments agreed to allow 1 extra h of APEX (we ended at 6 pm) BPM 'fixed trigger' (Michnoff, Satogata) ... Glitch in the. calculation of. beta* in IR6 ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 7
Provided by: cad53
Learn more at: https://www.c-ad.bnl.gov
Category:
Tags: apex | glich | march | schedule

less

Transcript and Presenter's Notes

Title: APEX Schedule March 8 2006


1
APEX Schedule March 8 2006
store
injection
BPM fixed trigger TJS, RobM
Collimation in Phenix KAD
Beam based sextupole polarity YL TS Third
order resonance correction
Back 2 physics
Optics MBai
Stochastic cooling test MJB, MMB
800
100
500
1200
1000
400
  • 200 pm dry run of Simons
  • Cogging/uncogging
  • STAR event display
  • FCP, PFI, PWS, Christie

2
Summary of March 8 APEX
  • Lost 3 hours on cooling water problems in AtR
  • Experiments agreed to allow 1 extra h of APEX (we
    ended at 6 pm)
  • BPM fixed trigger (Michnoff, Satogata)?slide
  • Stochastic cooling test of aperture at kicker at
    injection (Brennan, Blaskiewicz). DONE.
  • result horizontally well centered vertical
    6mm vs 3 mm ? drop 3 mm at the next maintenance
  • Beam-based sextupole polarity (Luo,Satogata)?slide
  • Optics (Bai) done at injection, rescheduled at
    store
  • Study of radiation in Phenix detector, work on
    collimation for STAR and Phenix (Drees) - DONE

3
BPM trigger test
Michnoff, Satogata
  • Bpms operational so far in auto-trigger to
    start (easier to get signals) plan is to switch
    to fixed-trigger
  • Problem beam intensity now just about in between
    gain 1 and 10 (0.7-0.8 1011 existing threshold)
  • Last APEX data taking towards fixed trigger
  • BO6 BPMs were converted to fixed trigger ? ramp
    data comparison (picture fill 07580 07586) 

Fixed trigger
Auto-trigger
4
Beam based sextupole polarity check
Luo, Satogata
  • Validation of method
  • 1/3 blue ring done
  • Will do the production
  • in the next 1-2 weeks

5
Optics measurements
Bai
  • Improvement in BPMs
  • Improvement in algorithm,
  • now completely model
  • independent
  • Glitch in the
  • calculation of
  • beta in IR6
  • Deferred
  • store

with improvement in BPMs and modified algorithm
that is 100 model independent
6
APEX Schedule March 14-15 2006
Store 6x6
injection
injection
2/3 resonance compensation Luo team
Calibration of Shottky Tunes Emittance Chromatici
ty Cameron DellaPenna
Preparation 10 Hz orbit Feedback Montag Michnoff S
chultheiss
Optics Gradient with AC Dipole Bai
Spin Tune Bai Bravar Itaru Gill
Optics Bai
Commissioning Lumi-emittance measurement Dejan,
Gassner Bellavia, Tseng
3am
8am
1am
10pm
4am
6am
5am
AGS LOTO
Parasitic during the day Jet is dimming.