Title: Department of Transport
1 Department of Transport
Department of Transport
Strategic Plan Presentation
Presentation by Ms M. Mpofu
Director General Transport
07 May 2008
2Department of Transport
Context for DoT Strategic Plan
- Vision, Mission, Mandate and Values
- DoT Strategic Objectives
- 2. January 2008 Cabinet Lekgotla Matters
- Cluster Priorities For 2008
- 24 Apex Priorities
- Overview of 2008 Medium- Term Expenditure Budget
- Management Issues
2
3Vision and Mission
- Our Vision
- Transport, the Heartbeat of Economic Growth and
Social Development - Our Mission
- to Lead the development of efficient
integrated transport systems by creating a
framework of sustainable policies and regulators
and implementable models to support government
strategies for economic, social and international
development.
3
4 DOT Mandate
- Our Mandate
- to maximize the contribution of transport to the
economic and social development goals of the
society by providing fully integrated transport
operations and infrastructure. - Our Values
- Maintain fairness and equity in all our
operations - Strive for quality and affordable transport for
all - Stimulate innovation in the transport sector
- Ensure transparency, accountability and
monitoring for all operations - Ensure sustainability, financial affordability,
accessibility as well as the upholding of the
Batho Pele principles.
4
5DOT Focus Areas
- To effectively manage a national innovative
research centre and provide economic advice and
analysis for all modes of transport - To create an enabling regulatory environment for
road, aviation and maritime transport, and manage
accident and incident investigations in all modes
of transport - To manage and facilitate integrated planning and
intersphere coordination for transport
infrastructure and operations
5
6DoT Focus Areas (Cont)
- To manage the implementation of the transport
logistics strategy and the development of freight
movement corridors - To develop integrated accessible and affordable
quality public transport networks that meet the
needs of both rural and urban passengers - To develop appropriate mandates and monitoring
mechanisms for public entities
6
7 Department of Transport
JANUARY 2008 CABINET LEKGOTLA MATTERS
7
8Critical Cabinet Lekgotla Resolutions
Implications for DOT
- DOT has a critical role to play in the ff areas-
- Integrated infrastructure plan
- Implementation of the industrial policy
- Implementation of Public transport Key Action
Plans - (Taxi recapitalization, subsidy system and
investment plans) - Road accident fund
- Implementation of the Rural Transport strategy
and Implementation of Shova- Kalula - 2010 FIFA World Cup progress, challenges and
interventions required - Inter - cluster activities
-
-
8
9 Department of Transport
CLUSTER PRIORITIES FOR 2008
9
10International Relations, Peace and Security
Cluster Priorities
- Consolidation of the African Agenda
- The strengthening of the South- South
Co-operation - Strengthening of the North- South Co-Operation
- Participating in a Global System of
- Governance- Multilaterals
- The strengthening of political and economic
relations- Bilaterals
10
11Economic Cluster Priorities
- Integrated infrastructure Plan De Hoop Dam
Pilot Proj. - Electricity Shortage intervention plan
- Increase economic efficiencies- ICT, Phased
Rollout of Public Transport network - Second Economy Framework integrated into Anti
Poverty Strategy - Promote dynamic growth sectors- implementation of
the industrial policy - Integrate support for small and micro-
enterprises - Reduce SMME regulatory burdens (incl. Municipal
by- laws).
11
12Governance and Administration Cluster Priorities
- As approved by Jan. 2008 Cab. Lekgotla-
- Capacity of the state 5 year local govt.
agenda, Skills assessment and Capacity
Development - Macro organization of the State A single public
Service, Integrated Service Delivery and E-
Government prospects - Good Governance- Anti- Corruption, Gender and
Disability, Batho Pele and Public Participation - Transversal Systems- Integrated Planning, the
Government Wide- Monitoring and Evaluation System
and the National Statistics System (NSS)
12
13Justice Crime Prevention and Security Cluster
Priorities
- Crime Prevention and Public Safety
- Organised Crime Syndicates
- Improving Effectiveness of the Criminal Justice
System - Upholding National Security
- Big events
13
14Social Cluster Priorities
Department of Transport
- Comprehensive Social Security
- Promotion of National Identity and Social
Cohesion- Vision 2010 - Comprehensive Health Care incl. Healthy Life
Style Campaigns - Meeting the Increasing Challenge of Housing and
Human Settlement - Food Security and Nutrition
- Second Economy Interventions Social Sector
Cluster Aspects - Education- Broadening Access and Improving
Quality - Comprehensive Anti-poverty Strategy
- Provision of free basic services
- Social Crime Prevention
- Youth Development and African Legacy Sport
Programmes
14
15 Department of Transport
24 APEX PRIORITIES Business Unusual All hands
on deck to speed up change February 2008
15
1624 APEX PRIORITIES
Department of Transport
- Industrial Policy Action Plan (Project 1,
Economic Cl) - Set up an investment call centre (Project 2,
Economic Cl) - Speed up ICT interventions to provide cheap
platforms (Project 3, Economic Cl) - Implement intensive campaign on energy security
(Project 4, Economic Cl) - Resolve organisational issues on skills
development Project 5, Economic Cl) - Resource poor schools and monitor learning
outcomes (Project 6, Social Cl) - Speed up land and agrarian reform (Project 7,
Economic Cl)
16
1724 APEX Priorities
Department of Transport
- War against poverty (Project 8, Social Cl)
- Self-employment interventions in the Second
Economy (Project 9, Economic Cl) - Speed up community infrastructure programme
(Project 10 Social CL) - Ratchet up implementation of ECD programme
(Project 11, Social Cl) - Intensify campaign on communicable diseases
(Project 12, Socal Cl )
17
1824 APEX Priorities
Department of Transport
- Assistance to SMEs including procurement
activities by government (Project 13, Economic
Cl) - Implement special social cohesion campaigns
- (Project 14, Social Cl)
- Regularise employment and KPA at designated
levels (Project 15, GA) - Ensure integrated planning across all spheres
- (Project 16, GA Cl)
- Improve civic services (Project 17, G A
Cluster) - Implement special crime combating and security
initiatives (Project 18, JCPS)
18
1924 APEX PRIORITIES
Department of Transport
- Reduce number of cases pending trial (Project 19,
JCPS) - Partnerships and communication on fighting crime
(Project 20, JCPS) - Continue to facilitate resolution of political
challenges facing Zimbabwe (Project 21, IRPS) - Consolidate advances relating to peace and
reconstruction in DRC (Project 22, IRPS) - Intensify economic diplomacy and communication
(Project 23, IRPS) - Increase SANDF (MSD) intake of young trainees
(Project 24, JCPS)
19
20Department of Transport
Overview of 2008 Medium- Term Expenditure
Budget
20
21 Contents
Department of Transport
- Additional allocations
- List of additional allocations
- Issues highlighted by the Minister of Finance
- MTEF Overview
- Budgets per Programme
- Breakdown of major budgets
- Growth in major capital budgets
- Other budgets and major projects
- Under expenditure in 2007/08
21
22 Department of Transport
Additional allocations
Details (R000) 2008/09 2009/10 2010/11
PTIS Grants to Local Government 0 0 2,000,000
SARCC 118,559 230,307 736,096
SARCC incorporation of Shosholoza Meyl 500,000 450,000 400,000
SANRAL 13,010 20,028 830,367
Taxi recapitalisation 200,000 150,000 100,000
Bus subsidies 40,000 50,000 60,000
Non-personnel inflation adjustment 47,966 46,502 46,830
Compensation of Personnel 6,175 8,023 8,652
Regulating and training of the taxi industry 6,000 6,000 6,000
Railway Safety Regulator 5,000 5,000 5,000
Ports Regulator 3,000 5,000 5,000
Performance based quality contract model for buses 5,000 5,000 0
Performance management system 2,000 1,000 1,000
Efficiency saving -14,546 -19,444 -22,838
Total 932,164 957,416 4,176,107
22
23 Department of Transport
Issues highlighted by the Minister of Finance
- PPP arrangements in funding large infrastructure
projects, particularly in passenger rail - Institutional arrangements and concurrent
functions in transport, specifically the roles
and responsibilities in public transport - Progress on the Bus Rapid Transit system and PTIS
spending and delivery in general - RISFSA road quality assessments, reclassification
and criteria for prioritisation
23
24Issues highlighted by the Minister of Finance
Department of Transport
- Alignment of the subsidised bus routes with the
Public Transport Strategy and Rural Transport
Strategy - Outstanding business plan for Shosholoza Meyl as
a ring fenced business within the SARCC. - Finalisation of the National Land Transport Bill.
- Development of the institutional and regulatory
framework to guide the implementation of the
National Freight Logistics Strategy.
24
25 Department of Transport
Budgets per Programme
Table 33.1 Transport R thousand 2007/08 2008/09 2009/10 2009/10 2010/11
Table 33.1 Transport R thousand Adjusted Appropri-ation Medium-term estimates Medium-term estimates Medium-term estimates Medium-term estimates
Table 33.1 Transport R thousand Adjusted Appropri-ation MTEF Baseline MTEF Baseline MTEF Baseline MTEF Baseline
1. Administration 144,408 170,537 179,230 182,449 182,449
2. Transport Policy and Economic Regulation 33,344 37,733 40,243 40,488 40,488
3. Transport Regulation and Accident and Incident Investigation 231,374 255,863 272,466 285,766 285,766
4. Integrated Planning and Inter-sphere Co-ordination 5,382,034 7,769,453 8,735,252 11,348,334 11,348,334
5. Transport Logistics and Corridor Development 18,637 22,225 21,322 21,876 21,876
6. Public Transport 10,559,225 12,073,463 12,985,884 11,780,249 11,780,249
7. Public Entity Oversight and Border Operations and Control 174,910 179,254 177,577 71,197 71,197
Total 16,543,932 20,508,528 22,411,974 23,730,359 23,730,359
25
26 Department of Transport
Breakdown of major budgets
Details R000 2007/08 2008/09 2009/10 2010/11
SARCC 3,955,197 4,871,276 6,398,101 7,273,958
SARCC Shosholoza Meyl 500,000 450,000 400,000
Bus subsidies 2,835,997 2,829,596 3,048,815 3,238,744
SANRAL 3,391,929 4,072,974 5,524,939 6,665,573
Taxi 692,460 565,567 541,184 514,304
PTIS (2010 Soccer World Cup) 1,780,000 3,480,000 2,975,000 4,464,500
Gautrain 3,029,411 3,265,993 2,507,211 317,526
Other 858,938 923,122 966,724 855,754
Total 16,543,932 20,508,528 22,411,974 23,730,359
Growth 23.83 23.96 9.28 5.88
26
27 Department of Transport
Breakdown of major budgets (Continued)
R000
2008/09
5,371,276
2,829,596
4,072,974
3,480,000
3,265,993
- Allocations for rail operations and capital
remain the largest single budget item.
- The budget for road infrastructure overtakes that
of bus subsidies from 2007/08 onwards.
- Allocations for infrastructure from the Public
Transport Infrastructure and Systems Grant was
introduced in 2005/06 at R241,7m, growing to
R700m in 2006/07.
- The National contribution to the Gautrain Rapid
Rail Link was introduced in 2006/07 at R3,241Bn,
and declines to R317,5m in 2010/11
27
28 Department of Transport
Growth in major capital budgets
28
29 Department of Transport
Breakdown of other budgets and major projects
Details R000 2008/09 2009/10 2010/11
Compensation of Employees 196,176 207,398 203,772
P1 October Month World Remembrance Day 15,000 15,750 16,500
P1 VPN, ECM, Recruitment 9,000 9,450 9,900
P1 Property management 14,242 15,666 17,233
P1 Other 54,427 56,167 58,716
P2 Transport Policy, Research and Economic Regulation 15,431 16,612 17,194
P3 eNaTIS 67,531 69,376 73,309
P3 Special Investigating Unit 20,579 22,353 23,620
P3 Rail Economic Regulator 8,250 8,962 9,470
P3 ICAO and IMO offices 7,140 7,755 8,194
P3 Watch Keeping services 26,271 28,536 30,152
P3 Oil Pollution prevention services 47,296 51,374 54,286
P3 Maritime Security Coordination Centre 6,356 6,904 7,295
P3 Commissioner of Civil Aviation 4,596 4,992 5,275
P3 Maritime Rescue Coordination Centre (Transfer payment) 5,023 5,273 5,589
P3 International membership fees 4,871 5,114 5,420
P3 Road Transport Regulation projects 20,158 21,895 23,137
P3 Other Regulation projects and Administration 5,570 5,965 6,292
29
30 Department of Transport
Breakdown of other budgets and major projects
(Continued)
Details R000 2008/09 2009/10 2010/11
P4 Transport planning and infrastructure projects 13,212 13,633 13,922
P4 Rural transport and NMT projects 45,361 49,421 52,222
P4 Road infrastructure planning 61,907 65,326 67,674
P4 Sani Pass and Overload Control 38,796 42,562 45,116
P4 2010 SWC Monitoring and Evaluation 20,000 25,000 0
P4 Other projects and Administration 8,465 9,196 9,697
P5 Transport Logistics and Corridor Development 11,434 9,362 9,866
P6 Bus contract model 5,000 5,000 0
P6 Other projects and Administration 19,158 17,857 18,319
P7 Transfers to RTMC 103,888 99,192 0
P7 Transfers to RSR 33,361 34,523 30,994
P7 Transfers to Ports Economic Regulator 11,382 13,699 8,921
P7 Transfers to SAMSA 8,535 8,959 9,497
P7 Transfers to SACAA 7,464 7,836 8,306
P7 Performance Management System 2,000 1,000 1,000
P7 Other projects and Administration 5,242 4,616 4,866
Total 923,122 966,724 855,754
30
31 Department of Transport
Under expenditure in 2007/08
Under expenditure in 2007/08 R000 Note
Compensation of Employees across Programmes 14,068 1
P1 National Land Transport Information System and Arrive Alive 5,703
P2 Policy development projects 10,448 2
P3 Under expenditure across all Sub Programmes 24,132 3
P4 Transport Planning 5,397
P4 Integrated Delivery (rural transport) 21,375 4
P4 Infrastructure Planning 16,083 5
P4 Monitoring and Evaluation 4,485
P4 Sani Pass and Overload control facilities 38,221 6
P4 Administration 148
P5 Freight logistics projects 9,765
P6 Rail feasibility study and other savings 23,096 7
P6 Taxi scrapping (R7,2m) and transfers to SANTACO (R8,9m) 16,193 8
P7 RAF restructuring and oversight projects 16,030 9
P7 Ports Regulator 11,144 10
Total 216,288
31
32 Department of Transport
Under expenditure in 2007/08
- Under spent due to vacant posts that could not be
filled. - The programme under spent due to less outsourcing
needed than planned. The development of several
policies were also delayed due to sub standard
bids received or bidders that did not understand
the Programmes requirements. - The major areas and reasons for under expenditure
in the Programme are detailed below - 3.1 Economic Regulation (Road Transport) R1,3
million - Funds have been allocated to this component for
operational expenditure but no posts could be
filled in time in this regard to perform the
functions attached to this post - this was after
the resignation of the Deputy Director. - 3.2 Standards Regulation R3,4 million
- The Director attached to this component was only
appointed during the second half of the financial
year and he was only able to appoint the
officials in the vacant posts during the second
half of the financial year which had a negative
influence on the operational expenditure (under
expenditure). The appointees also had to be
trained in service.
32
33 Department of Transport
Under expenditure in 2007/08
- 3.3 Traffic Safety Systems R5,113 million
- This under expenditure relates to the non
transfer of the eNaTIS project to the RTMC. - 3.4 Rail Transport Regulation R2,323 million
- Non appointment of any official in this
component. One official in the then Rail Economic
Regulation handled the establishment of the Rail
Economic Regulator. - 3.5 Civil Aviation Security R1,625 million
- A service provider has been appointed at a late
stage to develop a security system for the OR
Tambo Airport. The appointment has only been
finalised in the 2008/09 financial year. - 3.6 Maritime Safety and Bilateral Affairs R4,716
million - Lack of capacity limited the development of the
Maritime Safety Coordination Centre in its full
context.
33
34 Department of Transport
Under expenditure in 2007/08
- 3.7 Aviation and Maritime Investigations R3,483
million - Funds have been allocated for the Commissioner
of Civil Aviation which did not take place in the
2007/08 as clarity did not exist whether this
function must be transferred from the SACAA to
the Department. The FAA investigation and report
and the published Civil Aviation Bill of 2008
give clear guidance in terms of the way forward
with regard to this matter. It is envisaged that
the Bill will be passed through the Parliamentary
process during this Parliamentary session. - 4 5. The Programme did not have enough funds to
procure the required number of bicycles
(500,000), which delayed the tender process. Most
of the under expenditure was earmarked to
purchase 60,000 bicycles and a rollover of R30,98
million was applied for. The remaining funds were
earmarked for the National Airports Development
Plan (NADP) and a rollover of R7 million was
applied for. The appointment of an appropriate
service provider too eight months for the NADP. - The Programme also applied for other rollovers
of R6,5 million for projects that were delayed
and longer term projects, such as the National
Transport Master Plan, development of the
National Land Transport Bill, and the development
of guidelines and standards for monitoring of
Transport Planning.
34
35 Department of Transport
Under expenditure in 2007/08
- Amounts budgeted to assist Provinces with the
construction of the Sani Pass and overload
control facilities could not be paid because the
budgets were not included in the Division of
Revenue Act, and because there was uncertainty
about the appropriate method of payment and
ownership of the assets. - The Treasury recommended that the Department
should apply to roll over the funds and have the
funds allocated to the Provinces via the Division
of Revenue Act or Provincial Infrastructure
Grant. - The Department, in collaboration with the
Treasurys PPP Unit, invited Requests for
Proposals in September 2007, and planned to
appoint service providers to develop the
feasibility study for which R20 million was
earmarked. The bids that were received were
referred to the SARCC as the SARCC would be in a
better position to manage the project. The
Department applied to roll over the R20 million
and to increase the transfers to the SARCC by
that amount. - 8.1 All of the funds that were budgeted for the
scrapping of taxis were paid to the Scrapping
Administrator by 31 March 2008. R7,25 million
could not be utilised by 31 March 2008, because
the scrapping process was slowed down to
accommodate the available budget.
35
36 Department of Transport
Under expenditure in 2007/08
- 8.2 The Department witheld transfer payments to
SANTACO amounting to R8,9 million, because
SANTACO could not provide progress reports and
financial statements as required in the contract. - 9. An amount of R14 million could not be spent on
the RAF restructuring because Regulations had to
be developed for the RAF Amendment Act before
various provisions dealing with the liability of
the RAF could come into operation. There were
also delays due to the ill health of the Minister
of Health, who has to be consulted on certain
provisions. - 10. The Ports Regulator only became operational
late in the financial year, because the CEO could
only be appointed in March 2008. During the year,
effective governance structures were developed,
and premises were secured and equipped. The
Department made payments on behalf of the Ports
Regulator, but could not transfer the amount
budgeted, because the entity only became
operational in March 2008.
36
37 Department of Transport
Management issues
37
38DEPARTMENTAL STRUCTURE
- Total Establishment 1020
- 668 posts activated
- 352 posts inactive
- Vacancy rate 34.48
- Current turnover rate 9,72 (46)
- Number of internal promotions (Apr March 08)
32
38
39EMPLOYMENT EQUITY STATUS
Total Post 668 Filled 431 (64) Total Post 668 Filled 431 (64)
All Levels BLACKS 368 (87.20) African 340 (92.39) Coloureds 12 (3.27) Indian 16 (4.34) WHITE 54 (12.80) DISABLED 9 (2.13) WOMEN 223 (52.84) SMS only BLACKS 71 (86.59) African 56 (68.29) Coloureds 3 (3.66) Indian 12 (14.63) WHITE 11 (13.41) DISABLED 1 (1.22) WOMEN 30 (36.59)
39
40VACANCY STATUS
BRANCH/ COMPONENT SALARY LEVELS TOTAL POSTS ON ESTABLISHMENT FILLED POSTS VACANT POSTS
TRANSPORT MINISTRY Senior Management Levels 13-26 5 5 0
TRANSPORT MINISTRY Middle Management Levels 11-12 3 3 0
TRANSPORT MINISTRY Lower Management Levels 1-10 8 8 0
TRANSPORT MINISTRY SUB TOTAL 16 16 0
OFFICE OF THE DIRECTOR-GENERAL Senior Management Levels 13-26 5 5 0
OFFICE OF THE DIRECTOR-GENERAL Middle Management Levels 11-12 3 2 1
OFFICE OF THE DIRECTOR-GENERAL Lower Management Levels 1-10 6 5 1
OFFICE OF THE DIRECTOR-GENERAL SUB TOTAL 14 12 02
COMPONENT COMMUNICATIONS Senior Management Levels 13-26 6 2 4
COMPONENT COMMUNICATIONS Middle Management Levels 11-12 10 3 7
COMPONENT COMMUNICATIONS Lower Management Levels 1-10 14 7 7
COMPONENT COMMUNICATIONS SUB TOTAL 30 12 18
40
41BRANCH/COMPONENT SALARY LEVELS TOTAL POSTS ON ESTABLISHMENT FILLED POSTS VACANT POSTS
COMPONENT FINANCIAL SERVICES Senior Management Levels 13-26 11 8 3
COMPONENT FINANCIAL SERVICES Middle Management Levels 11-12 8 6 2
COMPONENT FINANCIAL SERVICES Lower Management Levels 1-10 52 39 13
COMPONENT FINANCIAL SERVICES SUB TOTAL 71 53 18
BRANCH MANAGEMENT SERVICES Senior Management Levels 13-26 19 10 9
BRANCH MANAGEMENT SERVICES Middle Management Levels 11-12 28 19 9
BRANCH MANAGEMENT SERVICES Lower Management Levels 1-10 111 75 36
BRANCH MANAGEMENT SERVICES SUB TOTAL 158 104 54
BRANCH TRANSPORT POLICY AND ECONOMIC REGULATION Senior Management Levels 13-26 21 9 12
BRANCH TRANSPORT POLICY AND ECONOMIC REGULATION Middle Management Levels 11-12 18 12 6
BRANCH TRANSPORT POLICY AND ECONOMIC REGULATION Lower Management Levels 1-10 28 19 9
BRANCH TRANSPORT POLICY AND ECONOMIC REGULATION SUB TOTAL 67 40 27
BRANCH TRANSPORT REGULATION AND ACCIDENT AND INCIDENT INVESTIGATION Senior Management Levels 13-26 18 14 04
BRANCH TRANSPORT REGULATION AND ACCIDENT AND INCIDENT INVESTIGATION Middle Management Levels 11-12 23 15 8
BRANCH TRANSPORT REGULATION AND ACCIDENT AND INCIDENT INVESTIGATION Lower Management Levels 1-10 81 56 25
BRANCH TRANSPORT REGULATION AND ACCIDENT AND INCIDENT INVESTIGATION SUB TOTAL 122 85 37
41
42BRANCH/COMPONENT SALARY LEVELS TOTAL POSTS ON ESTABLISHMENT FILLED POSTS VACANT POSTS
INTEGRATED PLANNING AND INTERSPHERE COORDINATION Senior Management Levels 13-26 19 10 9
INTEGRATED PLANNING AND INTERSPHERE COORDINATION Middle Management Levels 11-12 31 19 12
INTEGRATED PLANNING AND INTERSPHERE COORDINATION Lower Management Levels 1-10 39 23 16
INTEGRATED PLANNING AND INTERSPHERE COORDINATION SUB TOTAL 89 52 37
PUBLIC TRANSPORT Senior Management Levels 13-26 17 13 4
PUBLIC TRANSPORT Middle Management Levels 11-12 10 6 4
PUBLIC TRANSPORT Lower Management Levels 1-10 23 18 5
PUBLIC TRANSPORT SUB TOTAL 50 37 13
TRANSPORT LOGISTICS AND CORRIDOR DEVELOPMENT Senior Management Levels 13-26 10 4 6
TRANSPORT LOGISTICS AND CORRIDOR DEVELOPMENT Middle Management Levels 11-12 6 2 4
TRANSPORT LOGISTICS AND CORRIDOR DEVELOPMENT Lower Management Levels 1-10 17 5 12
TRANSPORT LOGISTICS AND CORRIDOR DEVELOPMENT SUB TOTAL 33 11 22
PUBLIC ENTITY OVERSIGHT AND BORDER OPERATIONS AND CONTROL Senior Management Levels 13-26 7 4 3
PUBLIC ENTITY OVERSIGHT AND BORDER OPERATIONS AND CONTROL Middle Management Levels 11-12 3 1 2
PUBLIC ENTITY OVERSIGHT AND BORDER OPERATIONS AND CONTROL Lower Management Levels 1-10 8 4 4
PUBLIC ENTITY OVERSIGHT AND BORDER OPERATIONS AND CONTROL SUB TOTAL 18 9 9
TOTAL 668 431 237
VACANCY RATE 35.48 35.48 35.48
42
43FILLING OF POSTS TIMETABLE
- Advertising
- Prepare advert confirmation 3 days
- Procurement 2 days
- Run advertisement for 2 weeks
- Executive Summary
- -2 working days per post depending on the number
of posts - Final1 Month depending on the availability of
managers applications received - Short-listing
- Preliminary
- 1 day
- Final
- 1 Month depending on the availability of managers
- Â Â Tests
- Competency
- Conducted within 2 weeks from date of scheduling
- PPA
- On the date of interview
- Â Â Interviews
- A week after the Competency Assessment report is
due
43
44TURN-OVER ANALYSIS
Transfers to other Departments
Total posts Transfers
Levels 3-8 262 17 (6.49)
Levels 9-12 268 9 (3.36)
Levels 13-16 138 2 (1.45)
Total 668 28 (4.19)
44
45Service Terminations
TURN-OVER ANALYSIS cont
Total posts Service Terminations
Levels 3-8 262 7 (2.67)
Levels 9-12 268 6 (2.24)
Levels 13-26 138 5 (3.62)
Total 668 18(2.69)
45
46LEARNERSHIPS
LEARNERSHIP RACE F M TOTAL
Public Admin A - 1 1
Road Transport Management A 4 2 6
TOTAL 4 3 7
46
47BURSARIES
47
48HR Interventions
- Measures have been introduced to reduce the
vacancy rate - Posts vacant for 6 months to be abolished
- Developing a recruitment database
- Internal advertising of posts from SL 1-7
- Shorter advertising period
- Streamlining of shortlisting process
- Outsourced response handling for posts below SMS
- A Retention Strategy has been developed (signed
by the majority Union) and will be presented at
the next EXCO meeting.
48
49JOB STANDARDIZATION / JOB EVALUATION
- The job standardization process has been
finalized and related posts job evaluated, - Job Evaluation Panel meeting held on December
2007, - JE Unit consulted the DPSA to seek clarity on
some issues raised by the JE Panel, - Next meeting scheduled for 6 February 2007, and
- JE conducted in line with the Public Service
Regulations, 2001 and DPSAs directives - Departmental Job Evaluation Policy,
- Benchmark similar posts within and against other
Depts, - Job enrichment where applicable,
- Implement DPSAS benchmark job descriptions.
49
50STATUS OF PMDS
- Employees on salary levels 12 and lower
- 2007/08 performance cycle
- Annual Performance Assessment finalized 317
- Outstanding 0
- Employees on SMS level
- 2005/06 and 2006/07 performance cycles
- Moderation of performance ratings currently
underway. - 2007/08 performance cycle
- Performance Agreement submitted 69
- Outstanding 15
- SMS members recently appointed 4
50
51Department of Transport
DoT 07-08 Performance Highlights
51
52Performance Highlights 2007-08
Draft documents for the following policies have been developed and are awaiting Cabinet approval National Maritime Transport Policy National Scholar Transport Policy Intelligent Transport Systems Policy Rail Gauge Width Policy Intermodal Cargo Transfer Policy Transport Environment and Health Charter Transport Research and Innovation Strategy Airlift Implementation Plan was approved by the Minister in November 2007 Ministerial Approval to redefine the Port limits was granted. SA retained FAA International Air Safety Category 1 status The plan for the100 luxury/semi-luxury buses for intercity/airport city operations was finalised in December 2007 Shova Kalula rollout plan was finalised The Rural Transport Strategy was approved by Cabinet in December 2007 The Transport Appeal Tribunal Regulations, 2007 were gazetted in December 2007. The regulations give effect to the Transport Appeal Tribunal Act no39 of 1998
52
53Performance Highlights 2007-08
A South African Network of Women in Transport (SANWIT) was officially launched in October 2007 and institutionalised as an organisation to empower and mainstream women into transport opportunities. 8 provincial Freight Databanks were completed Completed system requirements for National Freight Information System Phase 1 of the National Freight Monitoring Framework is complete (Completed Landscape and Business Challenges Reports) Scrapped 13 500 taxis 24 contact points for police were constructed at railway stations 515 Commuter rail coaches were refurbished Approval of Public Entities General Laws Amendment Act. Approval of appointments of CEOs by Minister CEOs and Ministerial Representatives to be non-voting members of Boards. Establishment of Ports Regulators Appointment of Board Members and CEO. 22 of female staff were exposed to women empowerment leadership programmes. Also registered 6 women staff members in a Food Aid Learnership. Successful hosting of the AU Conferences ROAD and RAIL Transportation
53
54Department of Transport Quick wins 2008-09
Department of Transport
Programme 2. Transport Policy Economic
Regulation
54
55Quick Wins for 2008/09Policy Analysis
Key Performance Indicator Key activities Target Dates 08/09 Budget
Approved Taxi Recapitalization Policy Cabinet approval May 2008 R 250 000
Approved white Paper on National Maritime policy Cabinet approval June 2008 R 50 000
Integrated policy across three departments (Transport Environment and Health Charter) Engagement and signing of the Charter by Ministers of DOT, DOH and DEAT January 2009 R 500 000
Legislation Legislation Legislation Legislation
Cross-Border Amendment Bill, 2008 Promulgation May 2008 R 20 000
Approved National Road Traffic Amendment Bill by Parliament Promulgation Legislation Implementation May 2008 R 30 000
Approved National Land Transport Bill, 2008 by Parliament Promulgation Legislation Implementation May 2008 R 30 000
55
56Quick Wins for 2008/09Economic Analysis
Key Performance Indicator Key activities Target Date 08/09 Budget
Gazetted B-BBEE Charter through DTI Section 12 9 Complete alignment of charters Present documents to the Transport Sector BEE Steering Committee for endorsement Submit and present documents to the DG, Minister DTI for approval gazetting May 2008 R 100 000
Successful B-BBEE Charter Launch Content Management July 2008 R 1M
A DoT approved, mass communicated, and quantified cost of transport to business Consultation with industry Tabling at Transport Lekgotla Tabling at Cabinet Lekgotla May 2008 May 2008 July 2008 R 1M
56
57Quick Wins for 2008/09Economic Analysis (Conti..)
Key Performance Indicator Key activities Target Date 08/09 Budget
Approved Infrastructure Funding Model Development of models, testing of models with various industry stakeholders, adoption and utilization of model by various stakeholders July 2008 R 800 000
Economic Regulation Economic Regulation Economic Regulation Economic Regulation
Establishment of a Single Transport Regulator Revision of the draft concept document March 2009 R500 000
Establishment of Rail Economic Regulator Amalgamation Plan for Transport regulators Sep 2008 R 12 m
Rationalization of Aviation Regulators Cabinet approval of Board Dec 2008 R200 000
57
58Department of Transport
Department of Transport
Programme 3 Transport Regulation and Accident
Incident Investigation
58
59 Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key Activities Target Dates 2008/09 Budget
20 Reduction in Road Fatalities FIFA Host Cities Regulatory Framework AARTO including establishment of Road Traffic Infringement within RTMC Monitor implementation of Road Safety Strategy. Implementation of the Adjudication System. March 2009 February 2009 R 60 M
Component for MIBs Compliance established Capacity to process 3000 buses per annum Streamline buses for vehicle compliance testing. Expedite homologation process. March 2009 R 6 M
Apply to DOL establish road traffic law enforcement services as essential services. Consultation with treasury and Department of Public Services and Administration. March 2009 R 2 M
59
60 Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key Activities Target Dates 2008/09 Budget
Specific Dispensation to Expeditiously process 2010 Applications for regulatory Compliance Value Chain arrangement to prepare for 2010, to fast track applications for licenses, OLBs etc. March 2009 R 3 M
Draft Civil Aviation Bill Drafting of Bill Enactment of bill April 2008 July 2008 R 4 M
Draft Plan for Manufacture, Repair and Maintenance Division of the Aviation industry in line with industrial policy Develop Terms of Reference Consultations with key stakeholders. March 2009 R 2 M
60
61 Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key Activities Target Dates 2008/09 Budget
Framework developed Low Cost Carrier infrastructure Support supply of transport Access to airports. Develop framework for Low Cost Carrier market transport access to airports. February 2009 R 2 M
Aviation Sector Operational Plan 2010 Event Updated Aviation Sector Operational Plan 2010 Event Coordination of aviation related activities in support of the 2010 World Cup - Aviation Sub-Sector Task Team. March 2008 March 2009 R 1 M
AFI RAN Sign MOU between Minister and ICAO Negotiate the text of the MOU with ICAO. Signing of the MOU. Hosting of the event. April 2008 Nov 2008 R 5 M
Training of 120 Seafarers for placement on ships Joint cooperation with interested governments to set up an International Maritime University in Cape Town. April 2008 R 18 M
61
62Department of Transport
Department of Transport
Programme 4. Integrated Planning Intersphere
Coordination
62
63Department of Transport
Quick Wins for 2008/09
Key Performance Indicator Key activities Target Dates 08/09 Budget
Integrated Infrastructure Plan report Adopt info sharing protocol Finalise plan April 08 July 08 R0,5m
Approved National Land Transport Act development Submit draft Bill to Cabinet and Parliament Promulgation May 08 Oct. 08
63
64Department of Transport
Quick Wins for 2008/09
2010 FIFA World Cup
Key Performance Indicator Key activities Target Dates 08/09 Budget
Consolidated Ops Plan for 2010 Consolidate HCOPs April 08 R2m
National Transport Ops Plan Develop detailed NTOP for 2009 (Confed. Cup) and 2010 (WC) Dec 08 R3m
Integration of 2010 priorities with GEF initiatives Integrate 2010 priorities with GEF initiatives and monitor performance June 08 10,9m (donation)
64
65Department of Transport
Quick Wins for 2008/09
2010 FIFA World Cup
Key Performance Indicator Key activities Target Dates 08/09 Budget
NMT rollout framework for 2010 Develop the framework Align 2010 NMT projects to the framework June 08 March 09 R1m
2010 info on GIS Host on a web-based GIS platform April 08 R0,5m
M E Programme Strengthen M E Programme July 08 R15m
65
66Department of Transport
Quick Wins for 2008/09
Rural Transport Promotion
Key Performance Indicator Key activities Target Dates 08/09 Budget
Bicycle manufacturing plant Investigate feasibility Sign agreements March 09 R2,1m
20 000 bicycles procured and distributed Procure and distribute 20 000 bicycles March 09 R25m
Rural development mapping Mapping using the GIS platform March 09 R3m
66
67Department of Transport
Department of Transport
Programme 5 Transport Logistics and Corridor
Development Branch
67
68Quick Wins for 2008/09
Department of Transport
Planned Outputs Target date Actual Performance Follow-Up Action
Confederations Cup Freight Plans 2010 World Cup Freight Plans April 08 April 08 Engaging Confed Cup host cities on plans Design host city freight routes for Confed Cup Consolidate various municipal precinct Freight Plans Engaging host city municipalities on precinct freight plans Design host city freight routes Finalise consolidated freight plans for Confed Cup Develop 2010 National Freight Plan
68
69Quick Wins for 2008/09(Cont)
Department of Transport
Planned Outputs Target date Actual Performance Follow-Up Action
Freight movement optimisation plans for top freight border posts Institutional legislative framework March 09 June 08 Audit current freight movement patterns at all identified border posts Identified top 5 freight border posts Reviewing legislative institutional frameworks of the freight sector Developed RER Framework Prepare Business Case for recommendation Implementation of recommended option Align regulatory institutional structure options
69
70Department of Transport
Department of Transport
Programme 6 Public Transport
70
71 Quick Wins for 2008/09
Department of Transport
PT Operational Modal plans for 2010 FIFA World
Cup
Key Performance Indicator Key activities Target Dates 08/09 Budget
Operational Plans for 2010 World Cup PT Operational Plans alignment to Host Cities Operational Plans Engagement Determine Vehicle requirements Secure Guarantee to purchase buses April 2008 SARCC R4.5M
71
72 Quick Wins for 2008/09
Department of Transport
Second Phase of passenger rail consolidation
Key Performance Indicator Key activities Target Dates 08/09 Budget
Business Merger Integration Plan Amendments to Legal Succession Act to include Autopax Promulgated Alignment with Rail Plan Strategy Business Plan,Investment Plan and turn around strategy for long distance rail Cabinet approval Alignment of Shosholoza Meyl services and Autopax services and establishment of pricing strategy Improve network access and reduce haulage charges through negotiations with Transnet March 2008 Aug 2008 Nov 2008 SARCC
72
73 Quick Wins for 2008/09
Department of Transport
Acquisition of Autopax
Key Performance Indicator Key activities Target Dates 08/09 Budget
Establish Autopax under SARCC Funding requirements for 2010 bus needs Treasury guarantee Private sector funding Completion of the Business Plan Order buses Obtain Treasury guarantee and secure investment funding Enabling legislation (Legal Succession Act) Recruitment of key personnel and drivers Operational plan for Autopax April 2008 May 2008 June 2008 June 2008 Aug 2008 National Treasury
73
74Department of Transport
Quick Wins for 2008/09
Turnaround Strategy for OLBs
Key Performance Indicator Key activities Target Dates 08/09 Budget
Optimal service delivery model Implemented Permit conversion process, (including outstanding SLP/BLC applications and semi-legal operators Elimination of backlog of outstanding transfers, replacements, renewals. Audit capacity constraints processes at OLBs Develop optimal business processes at OLB Regularisation of seating capacity alignment to OLB Finalise conversion process Outstanding backlog Semi-legals SLP and BLC unprocecessed applications April 2008 April 2008 July 2008 March 2008 R48m
74
75Department of Transport
Department of Transport
Programme 7 PUBLIC ENTITY OVERSIGHT AND BORDER
CONTROL
75
76Public Enterprises reporting to DoT
Department of Transport
South African Rail Commuter Corporation Road Accident Fund South African National Roads Agency Limited Road Traffic Management Corporation Railway Safety Regulator Cross-Border Road Transport Agency South African Civil Aviation Authority Air Traffic and Navigation Services Company Airports Company South Africa South African Maritime Safety Authority Urban Transport Management
76
77Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key Activity Target Dates 2008/09 Budget
Amendment Bill and Regulations finalized Communication Plan for New Road Accident Benefit Scheme Complete consultation on assessment method Promulgate Amendment Act and Regulations Finalise MOU between RAF and DoT Develop roll-out communication plan April 2008 June 2008 April 2008 Aug2008 R1m R12m
Finalize CBRTA Amendment Act Finalize CBRTA Amendment Bill Promulgation of Amendment Act. March 2008 July 2008
Approved framework for financial and governance oversight Formulate Entity Oversight Model to oversee entities performance August 08   R300K
77
78Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key Activity Target Dates 2008/09 Budget
Shareholders compact s / Performance Agreements Strategic plans / Corporate Plans Evaluate and align submitted Strategic / Corporate Plans with DoT strategic goals and priorities annual revision Revise and facilitate signing of Shareholders Compacts/Performance Agreements annual revision July 08    Aug 08
Effective coordination of PE activities in Border Control Clarify roles and mandates of PEs. Aug 08
78
79Department of Transport
Department of Transport
Management Services
79
80Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key activities Target Dates 08/09 Budget
Reduction in vacancies to 17 by March 2009 Consultation with EXCO and organized labour on amendments to policies and processes Formulation of a Retention Strategy June 2008 June 2008 R300,000.00
Enterprise Content Management Solution (ECM) Pilot deployed in the selected offices. File plan drafted June 2008 (Pilot) R5m
80
81Quick Wins for 2008/09
Department of Transport
Key Performance Indicator Key activities Target Dates 08/09 Budget
Accessibility of DOT information (i.e. email, voice, data etc) Upgrade of DOT Local Area Network (LAN) and implementation of Virtual Private Network (VPN). July 2008 R8m
Compliance with the Security Policy and Physical Security Standards Conduct physical security assessment, formulate implementation plan. Implement measures for physical security and access control Sept. 2008 March 2009 R4m
Enhanced Reception Service that facilitates Citizen and Stakeholder access to documentation and information Formulate a plan for information flow, logistics, and distribution of information. July 2008 R50,000.00
81
82Department of Transport
Financial Services
82
83 Department of Transport
Quick Wins for 2008/09
Key Performance Indicator Key Activities Target Dates 08/09 Budget
Output Complete financial statements of the drivers license card Trading Entity for audit and publish Annual Report Output Complete financial statements of the drivers license card Trading Entity for audit and publish Annual Report Output Complete financial statements of the drivers license card Trading Entity for audit and publish Annual Report Output Complete financial statements of the drivers license card Trading Entity for audit and publish Annual Report
Financial statements submitted for audit Annual Report completed Records written up for 2008 Financial statements Audit Committee review Annual report completed April 2008 20 May 2008 23 May 2008 30 August 08 Trading Entity
Output Operationalise the driving license card Trading Entity Output Operationalise the driving license card Trading Entity Output Operationalise the driving license card Trading Entity Output Operationalise the driving license card Trading Entity
Trading Entity complies with PFMA New service provider Monthly reports Audit Committee appointed Access to e NaTIS in place April 2008 From April 2008 23 May 2008 May 2008 Trading Entity
83
84 Department of Transport
Quick Wins for 2008/09 (continued)
Key Performance Indicator Key Activities Target Dates 08/09 Budget
Output Oversee contract management in the Department Output Oversee contract management in the Department Output Oversee contract management in the Department Output Oversee contract management in the Department
Contract management overseen and reported on Contract awarded Monthly reports Database established Relevant staff trained Contracts managed properly April 2008 May 2008 July 2008 Sept 2008 Sept 2008 To shift funds
Output Control environment risk assessment Output Control environment risk assessment Output Control environment risk assessment Output Control environment risk assessment
Report on the risk assessment Report and create awareness Update risk register June 2008 July 2008 R300,000
Output Incorporate risk management in Performance Agreements Output Incorporate risk management in Performance Agreements Output Incorporate risk management in Performance Agreements Output Incorporate risk management in Performance Agreements
Amended Performance Agreements Risk Register referenced Information to be taken on Update Agreements Cross refer risk register May 2008 June 2008 July 2008 IC
84
85 Department of Transport
Quick Wins for 2008/09 (continued)
Key Performance Indicator Key Activities Target Dates 08/09 Budget
Output Anti-corruption implementation plan Output Anti-corruption implementation plan Output Anti-corruption implementation plan Output Anti-corruption implementation plan
Availability of Anti-corruption implementation plan Develop implementation plan Implement the plan May 2008 March 2009 IC
Output Implement BarnOwl audit software Output Implement BarnOwl audit software Output Implement BarnOwl audit software Output Implement BarnOwl audit software
Implementation of audit software trained staff Train staff Electronic / automated audit working papers April 2008 April 2008 R200,000
Output Conduct performance audits Output Conduct performance audits Output Conduct performance audits Output Conduct performance audits
Quality and timely performance audits Conduct performance audits for 5 areas in Audit Plan April 2008 to January 2009 IA
Output Outsource Information Technology audit functions Output Outsource Information Technology audit functions Output Outsource Information Technology audit functions Output Outsource Information Technology audit functions
Quality Information Technology audits Two risk based Information Technology audit reports June and November 2008 R500,000
85
86Department of Transport
Office of the DG
86
872008/09 Business Plan
KPI Key Activities Target Dates 08/09 Budget
Timeous and comprehensive submissions to Cabinet, Makgotla, TL, COTO, MinMEC Facilitate compliance with prescribed formats Manage comprehensive submissions within timeframe Monthly 100,000
Comprehensive and timeous replies to PQ Manage submission of replies Confirm compliance with agreed format Monthly
Implementation of Parliament resolutions Convey Parliament decisions within 24hrs Govern implementation
87
882008/09 Business Plan
Output Departmental 3 yr Strategic Plan and
Annual Report
KPI Key activities Target Dates 08/09 Budget
DoT Strategic Plan tabled in Parliament within stipulated timeframes Optimize DoT strategic plan based on government priorities, budget, functional mandate and resources available Publish and table to Parliament April 08 400,000
Evaluation of quarterly performance against plan Coordinate progress evaluation of each programme performance Summarize DoT overall performance Quarterly
DoT Annual Report tabled in Parliament according to prescripts and timeframe Collate and analyze information on annual performance per program Develop and table report to Parliament Sept 08
88
892008/09 Business Plan
Fully functional ME system for DoT Flagship
Projects
KPI Key Activities Target Dates 08/09 Budget
Flagship project committee set up and list of flagship projects approved Institute project reporting framework Establish criteria for flagship projects Evaluate progress, make recommendation and report to EXCO April 08 100,000
Close-out report of completed flagship projects Submit close-out report to EXCO within 1 mth of project completion Develop and communicate lessons learnt guidelines Bi-annually
89
90Department of Transport
Communications
90
91Quick Wins for 2008/09
Output KPI Key Activities Target Dates 2008/09 Budget
Implement a communications programme which highlights strategic priorities World Transport Operational Plan Share information on 2010 economic opportunities Organize road shows to all 2010 host cities Stakeholder engagement (transport operators, public and business formations) Package information on available economic opportunities May to March 2009 R2m
91
92Quick Wins for 2008/09
Output KPI Key Activities Target Dates 2008/09 Budget
Rail Infrastructure and passenger rail safety Intense stakeholder/ commuter engagement on rail safety related issues Organise and engage rail commuter forums issues based interaction, site visits to projects and launches of SAPS contact points April to March 2009 R500 000
Rural Transport Strategy and Shova Kalula Highlight roll-out of IRMA (in selected municipalities) and distribution of bicycles Organise community events regarding distribution of bicycles and establishment of bicycle shops August to March 2009 R3m
92
93Quick Wins for 2008/09
Output KPI Key Activities Target Dates 2008/09 Budget
Intensified messaging on Arrive Alive Campaign Hard-hitting messaging on consequences of irresponsible road use (alcohol, speed, fatigue, non wearing of seatbelt and pedestrian safety) Heightened communication during peak periods (Easter and Festive season) Launch 2 new focused campaigns April to March 2009
Reposition SANWIT Launch of provincial charters Organise and market Conference Rebrand Sanwit coorporate identity Package information on BEE oppportunities for 20101 June to March 2009 R2m
93
94Department of Transport
Department of Transport
Programme1 Administration Ministry
94
95Quick Wins for 2008/09
Key Area Output Target Date
Improved interaction between the Minister, the Public Entities reporting to the Department of Transport and Parliament. Create a platform for a structured interaction between the Minister and the Chairpersons of the Boards of Public Entities. Â Prepare briefing documents for the Minister. Â Produce a report on the outcome of the meeting. April 2008
Hosting of the Ministerial engagement with the National Youth Leadership. Plan and develop a program for the engagement. Schedule the engagement on the Ministers and invite participants. Â Hold the Meeting. April 2008 May 2008 June 2008
95
96Quick Wins for 2008/09
Key Performance Indicator Key activities Target Dates 08/09 Budget
To provide an opportunity for the Minister to interact with members of the public and front-line staff on service delivery challenges. Arrange visits to Services Centres. Â Produce a report on the service delivery challenges experienced. June/Oct 2008 Nov 2008 R50 000
Project the positive role being played by Transport in the sector Ensure proactive media plans for all Ministry events October Transport Month, Budget Vote Speech, Road safety campaign, 2010 transport plan etc Manage and coordinate regular media briefings and content for the Minister As and when events happen
96
97Quick Wins for 2008/09
Key Performance Indicator Key activities Target Dates 08/09 Budget
Schedule bi-annual and quarterly meetings between staff, executive managers and the Minister   Organise events aimed at allowing the Minister to engage with stakeholders during the DoT Budget Develop a yearly schedule of meetings for staff, executive managers and the Minister. Identify and book suitable venues and times for these meetings. Develop a programme for Ministers engagements Identify stakeholders to be targeted. Hold the event. Bi-annually quarterly May 2008 R90 000
97
98 Department of Transport
Thank you
98