mines: equipment, shafts, ventilation, development, support, pumping ... possible reductions in mine output. Refurbishment: relook at scheduling. Smelterco: ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 10
Provided by: greg228
Category:

less

Transcript and Presenter's Notes

Title: Zambia Copper Investments Limited


1
Zambia Copper Investments Limited
  • Results Presentation
  • 24 August 2001

2
Financial Highlights
3
The Issues
  • SHE
  • Current operations
  • Refurbishment programme
  • Near term prospects
  • Financial position
  • KDMP

4
Safety, Health Environment
  • Nchanga open pit slope failure
  • Safety training and education
  • LTIFR 0.83 (per 200,000 man-hrs)
  • LTISR 35 (per 200,000 man-hrs)
  • HIV awareness
  • Malaria frequency

5
Current Operations
6
Refurbishment Programme
  • Deal with GRZ (286 million)
  • Major areas of spend
  • mines equipment, shafts, ventilation,
    development, support, pumping
  • processing concentrators, TLP
  • surface infrastructure
  • Commitments to date 145 million
  • Spend to date 88 million
  • FEC (286 million)

7
Near Term Prospects
  • SHE continuing high priority
  • Copper price continuing low for foreseeable
    future
  • Production cost control
  • must drive down costs
  • re-evaluation of viability of all operating units
  • possible reductions in mine output
  • Refurbishment relook at scheduling
  • Smelterco
  • achieve gt 300 tpd Cu on consistent basis (KCM
    proportion)
  • drive down costs
  • refurbishment

8
Financial Position
9
KDMP - Major Outstanding Issues
  • Status of Feasibility Study
  • Final capex, opex economics (price)
  • Smelterco performance option
  • Financing alternatives
  • Agreement with partners