Title: OUR TEAM
1OUR TEAM
MEP ENGINEER Over 18 years of service providing
MEP and Commissioning Services Over 2,000
successful project Over 35 engineers including
17 professionals registered in 39 states Offices
in Atlanta, GA and Charlotte, NC
CONTRACTOR Over 80 repeat business Annual
revenues averaging 500 million Consistently one
of the Nation's leading contractors in
Construction
INTERIOR DESIGNER 2002 AIA Architecture Firm
Award
LEED AP 10 Amazing years with TVS
Eco-Consulting Firm LEED CI Core Committee LEED
CI Faculty
2(No Transcript)
3(No Transcript)
4(No Transcript)
5(No Transcript)
6(No Transcript)
7(No Transcript)
8DESIGN CONCEPTS
- URBAN RETAIL COMMERCIAL SHOWROOM
- LAMPSHADES BAMBOO CREATE RHYTHM
- MUSEUM QUALITY WITH NEUTRAL SURFACES
- INVITATION TO THE DESIGN COMMUNITY
9THE INTERFACE MODEL
"We will honor the places where we do business by
endeavoring to become the first name in
industrial ecology, a corporation that
cherishes nature and restores the environment."
http//www.interfacesustainability.com/
10COMMITMENT IN BUILDINGS
INTERFACE, RAY C. ANDERSON PLANT
PRINCE STREET
11COMMITMENT IN PRODUCTS
- Interface Tricycle Product Development
Simulation Partnership - EPP Environmentally Preferable Products
- REENTRY Reclamation Program
12TEAM OVERVIEW
13USGBC
U.S. GREEN BUILDING COUNCIL
The nation's foremost coalition of leaders from
across the building industry working to promote
buildings that are environmentally responsible,
profitable, and healthy places to live and work.
- Nonprofit organization
- Diverse membership
- Consensus-driven
- Committee-based
- Developer and Administrator of LEED Rating System
14USGBC MEMBERSHP
15Leadership in Energy and Environmental Design
Customers
for Homes
for New Construction
for Existing Buildings
for Core and Shell
for Commercial Interiors
for Neighborhood Developments
For building owners and design teams that address
the new building design and construction or major
renovations process. Also referred to as LEED
version 2.
For developers and design teams that address the
new building design and construction process for
buildings where the interiors are not part of the
initial design process.
For building owners, tenants and design teams
that address commercial interiors design and
installation process. (Note process can be
driven by either owners or tenants.)
For building owners and service providers that
address building operation and on-going upgrades
and performance improvements.
For residential building owners, developers and
design teams that address the new residential
building design and construction process.
For residential building owners, developers and
design teams that address the new residential
building design and construction process.
16 LEED-CI MARKETPLACE
Commercial building alterations market for
tenants 38,564 Buildings (Dodge Report,
2004) Primary commercial building
sectors Office Retail Education
(K-12) Healthcare Higher Education Restaurant LEE
D-CI Intent Maximizing human potential through
environmentally responsible and profitable
interiors to transform the human environment.
LEED-CI Committed Marketplace
New Construction
Core Shell
Existing Buildings
Commercial Interiors
Residential New
Multi-residential New
17THE CHARETTE
- PRE-CHARETTE
- CHARETTE
- OWNER GOAL
- LEED CI PILOT PROJECT
OWNER
ARCHITECT / DESIGNER
CONTRACTOR
BASIC CONSULTANTS
SPECIAL CONSULTANTS
18LEED CI CHECKLIST
19PARALLEL EFFORT
- LEED CI COORDINATION
- DIVIDED UP PREREQUISITES / CREDITS
13
13
15
2
5
2
20LEED CI CATEGORIES
Category 1 Sustainable SitesCategory
2 Water EfficiencyCategory 3 Energy and
AtmosphereCategory 4 Materials and
ResourcesCategory 5 Indoor Environmental
QualityCategory 6 Innovation and Design
Process
21LEED-CI Category Distribution
Materials
Resources
27
Indoor
Environmental
Quality
29
Energy
Atmosphere
Sustainable
27
Water
Sites
Efficiency
13
4
Innovation Design Process Points
22LEED-CI Certification Awards
Four levels of certification LEED Certified 21 -
26 points Silver Level 27 - 31 points Gold
Level 32 - 41 points Platinum Level 42
points 57 possible points
23BUILDING SELECTION
Theres a new kind of energy in Midtown Atlanta
24LEED CI s u s t a i n a b l e s i t e s
CREDIT 1 SITE SELECTION CREDIT 2
DEVELOPMENT DENSITY CREDIT 4.1 ALTERNATIVE
TRANSPORTATION, Public Transportation CREDIT 4.2
ALTERNATIVE TRANSPORTATION, Bike Storage
Showers CREDIT 4.4 ALTERNATIVE TRANSPORTATION,
Parking Availability
25LEED CI w a t e r e f f i c i e n c y
CREDIT 3.2 WATER USE REDUCTION, 30
Reduction Base Building Restrooms Showroom
Kitchen Fixtures
26LEED CI e n e r g y a t m o s p h e r e
PREREQ. 1 FUNDAMENTAL BLDG. SYSTEMS
COMMISSIONING PREREQ. 2 MINIMUM ENERGY
PERFORMANCE PREREQ. 3 CFC REDUCTION IN HVACR
EQUIPMENT CREDIT 1.1 LIGHTING POWER CREDIT
1.2 LIGHTING CONTROLS CREDIT 1.3
HVAC CREDIT 1.4 EQUIPMENT APPLIANCES CREDIT
3 ADDITIONAL COMMISSIONING CREDIT 5.1
MEASUREMENT VERIFICATION (Sub-Metering) CREDIT
5.2 MEASUREMENT VERIFICATION (Energy costs
paid by Tenant) CREDIT 6 GREEN POWER
27LEED CI e n e r g y a t m o s p h e r e
PREREQ. 1 FUNDAMENTAL BLDG. SYSTEMS
COMMISSIONING PREREQ. 2 MINIMUM ENERGY
PERFORMANCE PREREQ. 3 CFC REDUCTION IN HVACR
EQUIPMENT
28LEED CI e n e r g y a t m o s p h e r e
CREDIT 1.1 LIGHTING POWER CREDIT 1.2
LIGHTING CONTROLS
29LEED CI e n e r g y a t m o s p h e r e
CREDIT 1.3 HVAC CREDIT 1.4 EQUIPMENT
APPLIANCES CREDIT 3 ADDITIONAL
COMMISSIONING CREDIT 5.1 MEASUREMENT
VERIFICATION, Sub-Metering CREDIT 5.2
MEASUREMENT VERIFICATION, Landlord Billing
Actual Energy Cost
30LEED CI m a t e r I a l s r e s o u r c e
s
PREREQ. 1 STORAGE COLLECTION OF
RECYCLABLES CREDIT 1.1 BUILDING REUSE, LONG
TERM LEASE CREDIT 1 BUILDING REUSE CREDIT 2
CONSTRUCTION WASTE MANAGEMENT CREDIT 3
RESOURCE REUSE CREDIT 4 RECYCLED
CONTENT CREDIT 5 LOCAL / REGIONAL
MATERIALS CREDIT 6 RAPIDLY RENEWABLE
MATERIALS CREDIT 7 CERTIFIED WOOD
31LEED CI m a t e r I a l s r e s o u r c e
s
PREREQ. 1 STORAGE COLLECTION OF
RECYCLABLES Paper Plastic Metal
Glass Cardboard
32LEED CI m a t e r I a l s r e s o u r c e
s
CREDIT 1.1 BUILDING REUSE, LONG TERM
LEASE CREDIT 1.3 BUILDING REUSE CREDIT 2.2
CONSTRUCTION WASTE MANAGEMENT, Divert
85 Recycling Dumpster Location ATDC worked
with building owner for variance in locating
dumpsters Recycling Program Make easy for subs
and clearly communicate goals and requirements of
jobsite
33LEED CI m a t e r I a l s r e s o u r c e
s
Salvage Materials Metal Studs Batt
Insulation Doors/ Frames/ Hardware Attic Stock
Metal Studs
Light Fixtures
Door, Frame Hardware
Sound Batt Insulation
34LEED CI m a t e r I a l s r e s o u r c e
s
35LEED CI m a t e r I a l s r e s o u r c e
s
CREDIT 3.3 RESOURCE REUSE, Reuse 30
Furniture CREDIT 4 RECYCLED CONTENT CREDIT 5
LOCAL / REGIONAL MATERIALS CREDIT 6
RAPIDLY RENEWABLE MATERIALS CREDIT 7
CERTIFIED WOOD
36LEED CI indoor environmental quality
PREREQ. 1 MINIMUM IAQ PERFORMANCE PREREQ. 2
ENVIRONMENTAL TOBACCO SMOKE CONTROL CREDIT 1
CARBON DIOXIDE (CO2) MONITORING CREDIT 2
VENTILATION EFFICIENCY CREDIT 3 CONSTRUCTION
IAQ MANAGEMENT PLAN CREDIT 4 LOW EMITTING
MATERIALS CREDIT 5 INDOOR CHEMICAL / POLLUTANT
SOURCE CONTROL CREDIT 6 CONTROLLABILITY OF
SYSTEMS CREDIT 7 THERMAL COMFORT CREDIT 8
DAYLIGHTING AND VIEWS
37LEED CI indoor environmental quality
PREREQ. 1 MINIMUM IAQ PERFORMANCE PREREQ. 2
ENVIRONMENTAL TOBACCO SMOKE CONTROL CREDIT 1
CARBON DIOXIDE (CO2) MONITORING CREDIT 2
VENTILATION EFFICIENCY
38LEED CI indoor environmental quality
CREDIT 3 CONSTRUCTION IAQ MANAGEMENT
PLAN McKenney's Mechanical Contractors Merv 8
Filtration Materials Properly Stored Dust
Control Dunnage IAQ Baseline Testing Before
Occupancy
39LEED CI indoor environmental quality
CREDIT 4.1 LOW EMITTING MATERIALS, Adhesives
Sealants CREDIT 4.2 LOW EMITTING MATERIALS,
Paints CREDIT 4.3 LOW EMITTING MATERIALS,
Carpet CREDIT 4.4 LOW EMITTING MATERIALS,
Composite Wood
40LEED CI indoor environmental quality
CREDIT 4.5 LOW EMITTING MATERIALS, Furniture
Furnishings
41LEED CI indoor environmental quality
CREDIT 5 INDOOR CHEMICAL / POLLUTANT SOURCE
CONTROL CREDIT 6 CONTROLLABILITY OF
SYSTEMS CREDIT 7 THERMAL COMFORT
42LEED CI indoor environmental quality
CREDIT 8 DAYLIGHTING AND VIEWS
43COST GRAPH
44LESSONS LEARNED
OWNER COMMITMENT PROJECT TEAM EXPERIENCE
COMMITMENT EARLY IN PROJECT SCHEDULE FLUXUATION
IN THE PROCESS LEARNING CURVE ABOUT MATERIALS
ADDITIONAL PROJECT FEE COSTS
45THANK YOU!
Many Thanks to all who made the Interface
Showroom Project a Success!
- Jones Automatic Sprinkler
- Kim King Associates
- Marek Interiors
- Marietta Drapery
- McKenneys Mechanical
- On Site Woodwork
- Pye Barker
- Regal Services
- ReSource GA
- Specialty Finishes
- Superior Rigging
- Trainor Glass
- Walker Door
- Williams Tile
- Interface Americas Inc.
- TVS Interiors
- Holder Construction Company
- Barrett Woodyard Associates
- Uzun Case
- CDAI
- ADTC
- Corn Upholstery
- Fab Master
- Fifth Street Management
- Georgia Tech
- Guy Gunter
- Holbrook Waterproofing
- Inglett Stubbs