Title: MiamiDade ATMS'ppt


1
Relieving Arterial Congestion in South Florida
Presented by K. K. Saxena, CCP, Kimley-Horn and
Associates, Inc.
Presented at TRANSPO, September 24th, 2008

2
  • Miami-Dade County ATMS
  • Broward County - TSP

3
Growth A Boon and a Challenge
  • Miami-Dade Countys Growth Trends from 1990 to
    2000
  • Population grew by approximately 16
  • Roadway lane miles increased by 14
  • Vehicle Miles Traveled (VMT) increased by 23

4
Growth Demand for Mobility
  • The number of Vehicle Miles Traveled (VMT)
    exceeded both the growth of population and the
    number of lane miles in the last decade
  • This increase in VMT is the source of congestion
    on the roadway network

5
Economic Growth Needs Efficient Travel
  • Annual delay increased by approximately 17 from
    Year 2000 to 2003.
  • TTI ranked the Miami metropolitan area 6th in the
    nation

6
In February 2005, a poll conducted by
ABC/Time/Post revealed55 of respondents said
that improving traffic signals was an important
remedy
What People Want
7
Background
  • Miami-Dades Urban Traffic Control System (UTCS)
  • First installed in the mid-70s
  • Funded by FHWA, FDOT, and local
    Decade-of-Progress bond funds
  • Largest central computer control system in the
    U.S. at inception
  • Reached maximum capacity of 2,048 signals by the
    mid-80s

8
After the Field Alpha Test Full Deployment
  • The completion of the field alpha test in 2006
    cleared the way to proceed with a full
    County-wide deployment of the Miami-Dade ATMS
  • Existing 700, outdated NEMA traffic controllers
    to be replaced by Type-170E controllers with
    enhanced processors
  • Communication lines and modems are being upgraded
    from voice-grade circuits to 9600 baud digital
    communications
  • Approximately 1,180 signals have already been
    converted to the new ATMS

9
After the Field Alpha Test Full Deployment
  • The final objective is to migrate the system to
    an ethernet network, which will incorporate
    wireless technology for greater flexibility and
    increase data transfer rates
  • Wireless ethernet will also lay the foundation
    for integrating additional devices such as
    wireless closed-circuit television cameras for
    monitoring intersections

10
Task Orders
  • A. Central Software
  • (customization and enhancements of baseline
    package used for alpha-test)
  • 8, 27  General UI  Improvements 30 Laptop
    applications
  • 9  Database  Conversion 31   Software
    Comp. Enhancements
  • 11   Integrated Zone Security 35, 37   HIT
    Report
  • 12   System Performance 36  System
    Database Archiving Retrieval
  • 24   Route Preemption 38  UTCS Data
    Integration Schedule Shifting
  • 25   IP Communication 39 Alarms,
    Commands and Help
  • 28 Central Scheduler 40  Real-time
    graphics and mapping
  • 29 Review of AToMS

11
Task Orders (cont.)
  • B. Signal Timing
  • 6 Red Light
  • 10 Signal Timing Review
  • 15 Kendall Dr Signal Retiming
  • 16   Flagler St. Signal Retiming
  • 17   SW 107th Ave Signal Retiming
  • 18   Biscayne Blvd Signal Retiming
  • 19   Signal Re-timing 49th 103rd               
                     
  • 20  SW 8th Signal Re timing
  • 22  Traffic Data  Collection

12
Task Orders (cont.)
  • C. ATMS Deployment
  • (comprising of all activities required to migrate
    signals from the existing to the new system)
  • 4 Countywide Migration Plan
  • 14, 32  Database Conv, Integration Testing
  • 23  Equipment Procurement
  • D. Communications Upgrade
  • 13   Comm.  Infrastructure Field  Review  
  • 26   On Call Communications
  • E. Infrastructure (Planning and Design)
  • 2  Reversible Lane Control System Design
  • 7  Cabinet/ControllerSpecifications
  • F. Program Management Support
  • 1, 33  Program Management
  • 5, 34 Project Website
  • 21  Bus Rapid Transit Concept of Operation

13
(No Transcript)
14
Signal Re-Timing for Major Corridors (1)
15
Signal Re-Timing for Major Corridors
16
Challenges
  • Upgrading communication lines from analog to
    digital by Bell South
  • Conduit breaks
  • Firmware modifications
  • Contractor procurement

17
Supporting Initiatives
  • Ten major corridors undergoing signal retiming
  • Bus rapid transit/Transit Signal Priority
  • Wireless Communications Alpha Test
  • New TMC
  • Arterial CCTV
  • Center-to-center Link with FDOT District Six TMC

18
Transit Signal Priority in Broward County
  • Breeze Rapid Bus Service along SR 7 (U.S.
    441) in Broward
  • Queue Jumper Proof-of-Concept
  • TSP on 50 intersections on 3 major arterials
  • Broward Boulevard
  • Hollywood Boulevard
  • State Road 7

19