1Indra Espacio
( Área reservada a imgen )
- SMOG
- 26-6-2006
- Final Presentation
- Management Part
Frascati Final Presentation 26 June 2006
2ESRIN SMOG Final Review
- 1st day dedicated to installation
- No need to connect SMOG to internal ESA network
- 2nd day dedicated to
- Management and technical presentation morning
2-3 Hours - Demo of AGF afternoon 2-3 hours
- 3rd day
- Conclusions
- Closure of project
3Agenda (I) 2nd day
- Meeting objectives (9.00 915)
- Management Part (915 1015)
- Project Objectives
- Phase I and II Activities
- Schedule
- Documentation generated
4Agenda (II) 2nd day
- Technical presentation(1110 1215)
- AGF function and architecture
- AGF How it works AGF?
- HW architecture
- AGF performances
- Achievements
- S/S Functionality
- Demo (2-3 hours) afternoon session
- AOB
5--123
Proposal Generated in response to ITT Impact
of Small Missions on Earth Observation Ground
Segment Systems (SMOG) ESA AO/1-3879/I-SB
6SMOG Background
- New trends in EO missions oriented towards small
satellite missions concept - satellites in cluster configuration -gt less
revisit time - less sensors per satellite and more specific -gt
user oriented - sensors with higher resolution -gt higher data
rate - ESA request for a definition of new and generic
GS data acquisition and processing facility (AGF)
to face new EO missions efficiently - providing a core of required functions
- avoiding development of a new GS facility each
time a new satellite mission is born - enabling the possibility to accommodate new
mission specific functions without impacting in
core AGF functions/architecture
7SMOG Project major objectives (I)
- To define a generic architecture, applicable to
the Ground Segment of the Earth Observation Small
Missions. - To define a generic Advanced Ground Facility,
AGF, as a basic node of the future ground
segment.
8SMOG Project major objectives (I)
- Convincing definition of a future generic AGF
able to cope with requirements of new EO small
mission concepts - Design of AGF constrained by budget recurrent
cost lt 500 k. - Validation of AGF concept by defining and
implementing an AGF prototype - functionally representative of overall AGF
requested functions - meeting partially the requirements reduced
performances w.r.t. that defined for generic AGF
9SMOG AGF Design Drivers (II)
- Overall recurring costs lt 500 k
- Limit the development / manufacturing
- Use of recurrent parts
- Maximum use of COTS
- Modular design to allow for ease adaptability and
expandability - Simple operation concept from user point of view
- autonomous minimum exchanges with mission
centers - automated
10SMOG AGF Design Drivers (II)
- SW architecture as independent as possible from
HW architecture performances of system only
dependant of available budget for HW. - Fast product delivery ground networks
- Use of Industry standards to have an open
architecture
11- Modular design of the AGF
- A basic AGF core designed
- Its functionality can be improved by adding new
modules - Flexible design of the AGF
- Support to generic missions e.g. TM Acquisition,
Archive, catalogue - Specific details for each specific mission have
to be implemented, e.g. Data Processing
12Project Organization
Prime Contractor INDRA ESPACIO
(Spain) Subcontractor ALCATEL ALENIA SPACE
BELL (Belgium) Subcontractor TTI (Spain)
13Project Phases
- SMOG project is divided in two phases as required
in SOW - Phase I (2/2001 -gt 28-11-2003)
- Study and analyse GS evolution
- Define and Design of AGF architecture
- Phase II (6-7/2003 -gt 6/2006)
- Implementation and demonstration of AGF prototype
14Events
- Change of ESA technical officer from Phase I to
Phase II - Change of project INDRA Project Manager as of end
January 2005
15Project Life Cycle
16Phase I Tasks
- Task 1 Project management for Phase I and II
- Project management
- Product Assurance
- Configuration and Documentation Control
- Project Web Pages Preparation
- Task 2 GS Evolution and AGF Definition
- GS Evolution Study
- User Requirements
- GS Requirements
- GS Architecture
- AGF System Requirements
- Task 3 AGF Design
- AGF Design Architectural and detailed)
- Technologies versus COTS Study, Survey of Market
- Cost Study non recurrent and recurrent products
- Prototype definition specification and
development plan
17Phase I WBS
18Phase I Meeting
- (KOM) Performed on 28/01/02
- (SRR) Performed on 09 and 10 /05/ 02
- (PDR) Performed on 31/07/02
- Video conference on 09/10/02
- (CDR) Performed (27/11/02)
19Phase II Tasks (I)
- Task 4 Prototype Implementation, Integration and
Acceptance - System/Subsystem definition
- Development of AGF manager
- Development of AGF Product generation
- Development of AGF Product Dissemination
- Development of GUI
- Development of FEP and FEP I/F to AGF manager
- Performing integration and acceptance test
- Perform system acceptance testing
- User Manual
20Phase II Tasks (II)
- Task 5 Prototype Demonstration support
- Perform AGF Demonstrations
- Delivery of AGF Prototype to Esrin along with the
documentation set - Installing Prototype at Esrin along with training
- Production of the Final Validation Report and
Executive Summary
21Phase II Additional Tasks
- INDRA requested ALCATEL the implementation of
Satellite simulator intended to inject Raw TM
data into FEP. - Request formally issued end 2003
22Phase II WBS
SMOG Phase 2
AGF PROTOTYPE
AGF VALIDATION
Task-4
Task-5
4000
5000
S/s Definition
S/s Manufacturing
Documentation
Integration Acceptance
Validation File
Demonstration Exec
Maintenance Delivery
4100
4200
4300
4400
5100
5200
5300
Integration File
Demostration Plan
Demonstration-1
SW Upgrade
RF Signal Processing
RF Signal Processing
Integration Process
4310
5110
5210
5310
4110
4210
4410
Acceptance File
AGF Validation Report
Demonstration-2
HW maintenance
4320
5120
5220
5320
User Documentation
Executive Summary
Demonstration-3
Installation ESRIN
Standard Antenna
Standard Antenna
Interface Verification
4330
5130
5230
5330
4111
4211
4411
Array Antenna
Down/Converter
SW Refinament
4112
4212
4412
Down/Converter
Integration Testing
IF Signal processing
4113
4413
4220
Acceptance Testing
IF Signal processing
4420
FEP
Demod/Bit Synch
4120
4221
FEP
Data Processing
4222
4130
Data Processing
Final Presentation activities
4230
Data Ingestion
4131
Product extraction
Data Ingestion
and generation
4231
4132
Product extraction
Processor, Data-base
and generation
Archiving
4232
4133
Processor, Data-base
Product Dissemination
Archiving
4134
4233
Control
Product Dissemination
4140
4234
Product Distribution
4235
Control
MC
4240
4141
Product Scheduler
4142
User IF/Product
MC
request handling
4241
4143
Product Scheduler
4242
User IF/Product
request handling
4243
23Phase II Meetings
- (KOM2) Performed on July 2003. Starting of
activities September 2003. - (CDR of Prototype) Performed (15/4/2004)
- First Demo AGF Prototype (25/11/2004) with FEP
simulated - FEP IQ F.A.T (13-10-2005), Minor anomalies
found, Authorization for delivery upon correction
14-11-2005 - Second Demo, complete AGF configuration,
performed 31-5-2006
24Phase II AGF Prototype development Stages
- AGF Prototype
- 1st Demo 11/04
- (FEP simulated)
- AGF Prototype
- Factory Acceptance
- AGF Prototype
- ESRIN Final Review
25Phase II Documentation INDRA
- Task 4 Prototype Implementation, Integration and
Acceptance - AGF Prototype external ICD
- ADD for the Archiving (PAS)
- ADD for the Product Generator (PGS)
- ADD for the Dissemination S/S (DDS)
- ADD for the Manager S/S (MAN)
- User Manual
26Phase II Documentation INDRA
- Task 5 Prototype Demonstration support
- Demonstration plan
- AGF Validation report
- Executive summary report
27Phase II Documentation ALCATEL, Task 4 Document
- Task 4 FEP IQ simulator Implementation,
Integration and Acceptance - AGF Prototype FEP System Requirements
- SMOG AGF prototype External Interface Control
Document - AGF Prototype FEP Architectural Design Document
- IQ Generator (simulator) Architectural Design and
Interface Control Document - User manuals
- SMOG AGF prototype Distribution Subsystem User
Manual - FEP User and Operations Manual
- SMOG AGF prototype IQ User and Operations Manual
- OMNISAT HIGH RATE MULTIMISSION DEMODULATOR User
Service Manual - TEST MODULATOR User Service Manual
- SMOG AGF prototype test
- Acceptance Test Procedure
- Acceptance Test procedures as executed
28Phase II Documentation TTI
- Critical analysis of the pros and contras of the
use of phased-arrays against parabolic systems - Antennas for small EO receiving stations
Development Plan for the Active Antenna
29Phase II Task 5 deliverables
- Task 5 Prototype Demonstration support
- AGF SW
- HW elements
- Data used
30El valor de la anticipación