Title: Indra Espacio


1
Indra Espacio
( Área reservada a imgen )
  • SMOG
  • 26-6-2006
  • Final Presentation
  • Management Part

Frascati Final Presentation 26 June 2006
2
ESRIN SMOG Final Review
  • 1st day dedicated to installation
  • No need to connect SMOG to internal ESA network
  • 2nd day dedicated to
  • Management and technical presentation morning
    2-3 Hours
  • Demo of AGF afternoon 2-3 hours
  • 3rd day
  • Conclusions
  • Closure of project

3
Agenda (I) 2nd day
  • Meeting objectives (9.00 915)
  • Management Part (915 1015)
  • Project Objectives
  • Phase I and II Activities
  • Schedule
  • Documentation generated

4
Agenda (II) 2nd day
  • Technical presentation(1110 1215)
  • AGF function and architecture
  • AGF How it works AGF?
  • HW architecture
  • AGF performances
  • Achievements
  • S/S Functionality 
  • Demo (2-3 hours) afternoon session
  • AOB

5
--123
Proposal Generated in response to ITT Impact
of Small Missions on Earth Observation Ground
Segment Systems (SMOG) ESA AO/1-3879/I-SB
6
SMOG Background
  • New trends in EO missions oriented towards small
    satellite missions concept
  • satellites in cluster configuration -gt less
    revisit time
  • less sensors per satellite and more specific -gt
    user oriented
  • sensors with higher resolution -gt higher data
    rate
  • ESA request for a definition of new and generic
    GS data acquisition and processing facility (AGF)
    to face new EO missions efficiently
  • providing a core of required functions
  • avoiding development of a new GS facility each
    time a new satellite mission is born
  • enabling the possibility to accommodate new
    mission specific functions without impacting in
    core AGF functions/architecture

7
SMOG Project major objectives (I)
  • To define a generic architecture, applicable to
    the Ground Segment of the Earth Observation Small
    Missions.
  • To define a generic Advanced Ground Facility,
    AGF, as a basic node of the future ground
    segment.

8
SMOG Project major objectives (I)
  • Convincing definition of a future generic AGF
    able to cope with requirements of new EO small
    mission concepts
  • Design of AGF constrained by budget recurrent
    cost lt 500 k.
  • Validation of AGF concept by defining and
    implementing an AGF prototype
  • functionally representative of overall AGF
    requested functions
  • meeting partially the requirements reduced
    performances w.r.t. that defined for generic AGF

9
SMOG AGF Design Drivers (II)
  • Overall recurring costs lt 500 k
  • Limit the development / manufacturing
  • Use of recurrent parts
  • Maximum use of COTS
  • Modular design to allow for ease adaptability and
    expandability
  • Simple operation concept from user point of view
  • autonomous minimum exchanges with mission
    centers
  • automated

10
SMOG AGF Design Drivers (II)
  • SW architecture as independent as possible from
    HW architecture performances of system only
    dependant of available budget for HW.
  • Fast product delivery ground networks
  • Use of Industry standards to have an open
    architecture

11
  • Modular design of the AGF
  • A basic AGF core designed
  • Its functionality can be improved by adding new
    modules
  • Flexible design of the AGF
  • Support to generic missions e.g. TM Acquisition,
    Archive, catalogue
  • Specific details for each specific mission have
    to be implemented, e.g. Data Processing

12
Project Organization
Prime Contractor INDRA ESPACIO
(Spain) Subcontractor ALCATEL ALENIA SPACE
BELL (Belgium) Subcontractor TTI (Spain)
13
Project Phases
  • SMOG project is divided in two phases as required
    in SOW
  • Phase I (2/2001 -gt 28-11-2003)
  • Study and analyse GS evolution
  • Define and Design of AGF architecture
  • Phase II (6-7/2003 -gt 6/2006)
  • Implementation and demonstration of AGF prototype

14
Events
  • Change of ESA technical officer from Phase I to
    Phase II
  • Change of project INDRA Project Manager as of end
    January 2005

15
Project Life Cycle
16
Phase I Tasks
  • Task 1 Project management for Phase I and II
  • Project management
  • Product Assurance
  • Configuration and Documentation Control
  • Project Web Pages Preparation
  • Task 2 GS Evolution and AGF Definition
  • GS Evolution Study
  • User Requirements
  • GS Requirements
  • GS Architecture
  • AGF System Requirements
  • Task 3 AGF Design
  • AGF Design Architectural and detailed)
  • Technologies versus COTS Study, Survey of Market
  • Cost Study non recurrent and recurrent products
  • Prototype definition specification and
    development plan

17
Phase I WBS
18
Phase I Meeting
  • (KOM) Performed on 28/01/02
  • (SRR) Performed on 09 and 10 /05/ 02
  • (PDR) Performed on 31/07/02
  • Video conference on 09/10/02
  • (CDR) Performed (27/11/02)

19
Phase II Tasks (I)
  • Task 4 Prototype Implementation, Integration and
    Acceptance
  • System/Subsystem definition
  • Development of AGF manager
  • Development of AGF Product generation
  • Development of AGF Product Dissemination
  • Development of GUI
  • Development of FEP and FEP I/F to AGF manager
  • Performing integration and acceptance test
  • Perform system acceptance testing
  • User Manual

20
Phase II Tasks (II)
  • Task 5 Prototype Demonstration support
  • Perform AGF Demonstrations
  • Delivery of AGF Prototype to Esrin along with the
    documentation set
  • Installing Prototype at Esrin along with training
  • Production of the Final Validation Report and
    Executive Summary

21
Phase II Additional Tasks
  • INDRA requested ALCATEL the implementation of
    Satellite simulator intended to inject Raw TM
    data into FEP.
  • Request formally issued end 2003

22
Phase II WBS
SMOG Phase 2
AGF PROTOTYPE
AGF VALIDATION
Task-4
Task-5
4000
5000
S/s Definition
S/s Manufacturing
Documentation
Integration Acceptance
Validation File
Demonstration Exec
Maintenance Delivery
4100
4200
4300
4400
5100
5200
5300
Integration File
Demostration Plan
Demonstration-1
SW Upgrade
RF Signal Processing
RF Signal Processing
Integration Process
4310
5110
5210
5310
4110
4210
4410
Acceptance File
AGF Validation Report
Demonstration-2
HW maintenance
4320
5120
5220
5320
User Documentation
Executive Summary
Demonstration-3
Installation ESRIN
Standard Antenna
Standard Antenna
Interface Verification
4330
5130
5230
5330
4111
4211
4411
Array Antenna
Down/Converter
SW Refinament
4112
4212
4412
Down/Converter
Integration Testing
IF Signal processing
4113
4413
4220
Acceptance Testing
IF Signal processing
4420
FEP
Demod/Bit Synch
4120
4221
FEP
Data Processing
4222
4130
Data Processing
Final Presentation activities
4230
Data Ingestion
4131
Product extraction
Data Ingestion
and generation
4231
4132
Product extraction
Processor, Data-base
and generation
Archiving
4232
4133
Processor, Data-base
Product Dissemination
Archiving
4134
4233
Control
Product Dissemination
4140
4234
Product Distribution
4235
Control
MC
4240
4141
Product Scheduler
4142
User IF/Product
MC
request handling
4241
4143
Product Scheduler
4242
User IF/Product
request handling
4243
23
Phase II Meetings
  • (KOM2) Performed on July 2003. Starting of
    activities September 2003.
  • (CDR of Prototype) Performed (15/4/2004)
  • First Demo AGF Prototype (25/11/2004) with FEP
    simulated
  • FEP IQ F.A.T (13-10-2005), Minor anomalies
    found, Authorization for delivery upon correction
    14-11-2005
  • Second Demo, complete AGF configuration,
    performed 31-5-2006

24
Phase II AGF Prototype development Stages
  • PHASE 2
  • PHASE 1
  • STAGE II
  • STAGE IV
  • STAGE III
  • STAGE I
  • AGF Prototype
  • 1st Demo 11/04
  • (FEP simulated)
  • AGF Prototype
  • Factory Acceptance
  • AGF Prototype
  • ESRIN Final Review
  • AGFPrototype
  • AGF Prototype
  • AGF Prototype
  • AGF Detailed
  • AGF System Design
  • Integration
  • Validation
  • Implementation
  • Design

25
Phase II Documentation INDRA
  • Task 4 Prototype Implementation, Integration and
    Acceptance
  • AGF Prototype external ICD
  • ADD for the Archiving (PAS)
  • ADD for the Product Generator (PGS)
  • ADD for the Dissemination S/S (DDS)
  • ADD for the Manager S/S (MAN)
  • User Manual

26
Phase II Documentation INDRA
  • Task 5 Prototype Demonstration support
  • Demonstration plan
  • AGF Validation report
  • Executive summary report

27
Phase II Documentation ALCATEL, Task 4 Document
  • Task 4 FEP IQ simulator Implementation,
    Integration and Acceptance
  • AGF Prototype FEP System Requirements
  • SMOG AGF prototype External Interface Control
    Document
  • AGF Prototype FEP Architectural Design Document
  • IQ Generator (simulator) Architectural Design and
    Interface Control Document
  • User manuals
  • SMOG AGF prototype Distribution Subsystem User
    Manual
  • FEP User and Operations Manual
  • SMOG AGF prototype IQ User and Operations Manual
  • OMNISAT HIGH RATE MULTIMISSION DEMODULATOR User
    Service Manual
  • TEST MODULATOR User Service Manual
  • SMOG AGF prototype test
  • Acceptance Test Procedure
  • Acceptance Test procedures as executed

28
Phase II Documentation TTI
  • Critical analysis of the pros and contras of the
    use of phased-arrays against parabolic systems
  • Antennas for small EO receiving stations
    Development Plan for the Active Antenna

29
Phase II Task 5 deliverables
  • Task 5 Prototype Demonstration support
  • AGF SW
  • HW elements
  • Data used

30