CEM 515 - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

CEM 515

Description:

High Pressure Heater Vessel Tube Leak (Frequent tube leak ,difficult to maintain ... Receive Connection Bolts, Nuts and Washers. Connect Second: Beams and Girders ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 23
Provided by: ocwKfu
Category:
Tags: cem | pressure | washer

less

Transcript and Presenter's Notes

Title: CEM 515


1
??? ???? ?????? ??????King Fahad University Of
Petroleum and MineralsConstruction Engineering
Department
  • CEM 515
  • Problem presentation
  • Group 2

2
Outline
  • Introduction
  • Objective
  • List of all problems
  • Problem selection
  • Problem description
  • Problem Solution
  • Conclusion

3
objective
  • Applying the eight step process to solve a
    problem.
  • Reducing delivery time.
  • Reach Customer satisfaction.

4
All problems
  • Changing schedule of yearly maintenance shutdown
    many time and by many person and depend on a lot
    of factors, this change in schedule will affect
    in quality of work , some activity will be
    cancelled , increase in overtime budget and rush
    work. ) Humod)
  • High Pressure Heater Vessel Tube Leak (Frequent
    tube leak ,difficult to maintain and reflected
    in drop 10MW power in production). (Sultan)
  • The progress of completing the design and the
    complete set of the drawings for any project is
    taking more time than expected. (Ahmad )
  • As a Steel Structural building fabricator, our
    scope of work includes supply of the following
    to our customer, which is required for the
    construction of a building. This includes supply
    of following fabricated components columns,
    beams, girders, cross Bracing Members, connection
    Bolts, metal Roofing, doors, windows

5
All problems
  • In my division which is part of my department, we
    need at least 37 employees, either engineers
    or technicians, to do the specified job that
    relate to every one regarding the daily
    activities without pressure. In fact, we have
    only 28 employees and every one has sometimes
    overloaded work because of shortage of manpower.
    (Sughair )
  • In our department we have about 40 auditors in 4
    divisions. We want to implement a pool strategy
    where we can reshuffle people from one division
    to another to satisfy demand. We, however, face a
    problem of planning manpower throughout a whole
    year. The nature of auditing job requires
    traveling in and out of Kingdom and it becomes
    overwhelming to ask people to travel without an
    early notice. In this sense, a solid plan for the
    whole year can not be made of who will be working
    on this audit or that. (ali)

6
DECISION MATRIX
  • evaluated and prioritized a list of options
  • established a list of weighted criteria
  • evaluated each option against those criteria

Problem Definition to select one problem out of
the 5 problems
7
Problem Customer Desire Actual Status
  • Introduction
  • As a Steel Structural building fabricator, our
    scope of work includes supply of the following to
    our customer, which is required for the
    construction of a building. This includes supply
    of following fabricated components
  • Columns
  • Beams
  • Girders
  • Cross Bracing Members
  • Connection Bolts
  • Metal Roofing
  • Doors
  • Windows

8
Problem Customer Desire Actual Status
  • Customer Desire
  • For construction purpose customer require the
    following sequential order of delivery
  • Construct First Columns
  • Receive Connection Bolts, Nuts and Washers
  • Connect Second Beams and Girders
  • Construct Third Cross Braces
  • Construct Fourth Metal Roofing
  • Construct Fifth Windows
  • Construct Sixth Doors

9
(No Transcript)
10
(No Transcript)
11
QUALITY DEFINITION
12
PROCESS MAP
13
CONTROL CHART
14
FISH BONE ANALYSIS
15
BRAIN STORMING
16
DECISION MATRIX
17
SOLUTION ANALYSIS
18
CNC (computer numerically controlled) cutting
  • In CNC milling, a dedicated computer system
    performs the basic controlling functions over the
    movement of a machine tool, the tool rapidly
    removes material from a large monolithic block
    using a set of coded instructions for the static
    geography of the surface.

19
GANTT CHART
20
CONTROL CHART AFTER IMPLEMENTATION
21
CONCLUSION
  • From the control chart the delivery time became
    less.
  • Customer was satisfied.
  • He who learns best wins

22