1
Root Cause Analysis Enhancement
Construction Engineering Management Quality
Management CEM 515
Term Paper
  • Jan 21, 2006
  • Presented by Mohammed A. Al-Dossary

Abqaiq Plants Today film
2
Outline
  • Part I Abqaiq Plants Overview
  • Plants Background
  • Plants Processes
  • Plants in Saudi Aramco Organizational Chart
  • Part II Root Cause Analysis Program
  • Initial investigation
  • Review Methodologies
  • Summary
  • Lessons Learned

3
Upset Definition
  • An unplanned shutdown of critical equipment
    during normal operation which may lead to
    production losses.

4
Problem Statement
  • Top Management Statement
  • We would like a team to work on identifying the
    root causes of the nuisance and repetitive upsets!

We dont want more upsets please!
5
Forming Investigation Committee
  • Management appointed a leader from Maintenance
  • Leader selected members from operations
    (customer), maintenance and engineering
  • Committee members 5

Op Manager
Maint. Manager
6
Investigation Methodology
  • Kickoff meeting was started by the team leader
    and a Weekly meeting was scheduled which lasted
    for 4 hours

7
Investigation Methodology
Initial Review of archived reports
Review of Current Investigation system
External Benchmarking
Personnel Interviews
8
Investigation Methodology
Initial Review of archived reports
Review of Current Investigation system
External Benchmarking
Personnel Interviews
9
Investigation Methodology
Investigation Workflow
Initial Review of archived reports
End
Review of Current Investigation system
Report Workflow (Manual)
External Benchmarking
Personnel Interviews
End
10
Investigation Methodology
Initial Review of archived reports
Review of Current Investigation system
External Benchmarking
Personnel Interviews
11
Investigation Methodology
Initial Review of archived reports
Review of Current Investigation system
  • Current quality of Investigation
  • Personnel satisfaction of current system
  • Hidden back breaks
  • Expectations

External benchmarking
Personnel interviews
12
Implementation Roadmap
13
Quantitative Methodologies
  • Identified the data boundaries
  • Identified data population 400
  • Gathered all data for 4 years
  • Designed QD Access Database
  • Used Minitab to generate statistical analysis

14
Quantitative Methodologies
By Category
3
5
5
13
50
24
15
Quantitative Methodologies
By Plant
20
18
16
14
12
()
Percentage
10
8
6
4
2
0
Plant N
Plant A
Plant B
Plant C
Plant D
Plant G
Plant H
Plant K
Plant M
Plant E
Plant F
Plant L
Plant J
Plant I
16
Quantitative Methodologies
By Season
43
Winter
57
Summer
17
Quantitative Methodologies
By Shift
20
S1
S2
48
S3
32
18
Quantitative Methodologies
By Equipment
2.5
2.0
1.5
1.0
0.5
0
Pump
Gearbox
Generator
Ind. Motor
St. Turbine
Sync. Motor
Gas Turbine
Compressor
19
Quantitative Methodologies
PS Card
I/P Card
O/B Bearing
ESD System
O/P Card
Instrument Loop
Vibration
Controller
I/B Bearing
ESD System
Instrument Loop
Instrument
Governor
O/B Bearing
ESD System
Thrust Bearing
ESD System
Instrument Loop
P Switch
Lube Oil
PS Card
T. Switch
Instrument Loop
I/P Card
Hardware
Wiring
O/P Card
Mechanical
Steam Turbine
Controller
Software
ESD System
Temperature
O/B Bearing
Instrument Loop
PIB Cabinet
Instrument Cable
I/B Bearing
ESD System
Field JB
RTD
Installation
Instrument Loop
Process
Specification
Wiring
Thrust Bearing
ESD System
Instrument Loop
20
Quantitative Methodologies
  • Established fault tree for all instrumentation
    upsets 200
  • Involved all specialized people in the fault tree
    identifications
  • Prepared an educational Root Cause Analysis Class

21
Implementation Roadmap
22
Qualitative Methodology
Start
Upset occurs
Fill out DB (Oper. Supv. Maint. Crew)
Form Inv. Team
Initial Assessment With Action Plan
No
No
No
No
Rel. Supv. Approval
Eng. Supv. Approval
Maint. Supt. Approval
Oper. Supt. Approval
Yes
Fill DB Sections RCA, Recommendations
Yes
Yes
Yes
Generate Final Report
23
RCA program Gant Chart
24
Implementation Roadmap
25
Conclusion
  • Managed to improve RCA program in the plants
    using qualitative Quantitative techniques
    through an empowered project team under the
    supervision of the top management

26
Lessons learned
  1. Top management commitment
  2. Multidiscipline and homogenous team
  3. Empowered team under the supervision of one
    leader
  4. Unlimited resources

27
Root Cause Analysis Program
Construction Engineering Management Quality
Management CEM 515
Term Paper
  • Jan 21, 2006
  • Presented by Mohammed A. Al-Dossary

Thank you!
28
ignificant
rocess
S
P
U
R
T
psets
eview
SPURT
eam
back
29
Team Name Mission
  • Mission
  • To provide feasible short and long-term
    recommendations aimed at minimizing Plants
    nuisance and unnecessary upsets using qualitative
    quantitative methods

back
30
Team Name Mission
31
Team Name Mission
back
32
Root Cause Analysis Section
Built-in Library of fault trees
back
Write a Comment
User Comments (0)
About PowerShow.com