INSTMMELMARINA - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

INSTMMELMARINA

Description:

INSTM Port de P che La Goulette, ... 28 rue 2 mars 1934, 2025 Salammb - TUNISIA ... RESEARCH VESSEL N/O HANNIBAL. ACQUIRED WITHIN JAPAN-TUNISIA COOPERATION ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 26
Provided by: ins59
Category:

less

Transcript and Presenter's Notes

Title: INSTMMELMARINA


1
INSTITUT NATIONAL DES SCIENCES ET TECHNOLOGIES DE
LA MER 28 rue 2 mars 1934, 2025 Salammbô - TUNISIA
  • INSTM/MELMARINA
  • SECOND WORKSHOP
  • WATER CHEMISTRY
  • RABAT
  • January 17-19, 2004
  • CHOUBA Lassaad
  • INSTM Port de Pêche La Goulette, 2060 Tunis.Tel.
    216 1 735848
  • E-Mail lassaad.chouba_at_instm.rnrt.tn

2
INSTITUT NATIONAL DES SCIENCES ET TECHNOLOGIES DE
LA MER
28 rue 2 mars 1934 2025 Salammbô, Tunisia
3
RESEARCH VESSEL N/O HANNIBALACQUIRED WITHIN
JAPAN-TUNISIA COOPERATION
4
INSTITUT NATIONAL DES SCIENCES ET TECHNOLOGIES DE
LA MER
4 Laboratory Ressources vivantes
Aquaculture Biotechnologie marine Milieu
Marin (Unités Bactériologie, Océanographie,
Hydrobiologie, Plancton, Chimie)
5
  • The major activity for the Marine Environment
    Unit is focused on the following
  • Water quality monitoring in the gulf of Tunis,
    the gulf of Gabès and Tunisian lagoons
    (Nutriments, Heavy metals, Pesticides,
    Hydrocarbons etc)
  • Assessment of actual situation and possibilities
    of development in Bizerte lake.
  • Ecotoxilogy and bio supervision of the coast
  • Monitoring of Phytoplankton and toxic
    contaminants in Mollusks production areas.
  • Observation of the sea in connection with the
    OTED

6
TUNISIA MELMARINA PROGRAM
Water Quality
  • Members L. CHOUBA, M. KRAIEM, F. AYACHE, F.
    AKROUT
  • Introduction
  • In the MELMARINA Project, the fieldwork was
    undertaken in Tunisia, during February 2003, to
    verify site selections and to collect basic
    survey information pH, salinity, conductivity,
    temperature, oxygen dissolved, Chla, Suspended
    solids MES, anions (alkalinity, Cl-, SO42- ),
    total phosphorus and total nitrogen.
  • Staff involved in this mission R. Flower, L.
    CHOUBA, M. KRAIEM, F. AYACHE, Stephanie, Thompson

7
Monitoring sites of GHAR EL MELH Lagoon
8
Table MELMARINA Fieldwork schedule
(July-December 2003)
9
METHODOLOGY
Sampling
For sediment
Ekman Grab
  • Surface sediment sampling was made by Ekman grab
    and heavy metals was determined.

10
Water
Fauna
  • First,  Surface sediment sampling was made by
    Ekman grab, Cover of vegetation was assessed
    within the Grab area (14x14 cm)
  • A second replicate grab sample was processed
    through a pair of metal sieves (500 and 200 um
    mesh size) and the numbers of invertebrates
    (notably, the abundance of mollusk shells) were
    estimated,

The abundance of mollusc shells were estimated
11
RESULTS of the first Fieldwork measurements
12
(No Transcript)
13
Optional measurements Anions (chloride, sulphate)
14
RESULTS of the first monitoring measurements
15
(No Transcript)
16
(No Transcript)
17
Total phosphorus, Total Nitrogen and NT/PT
18
Chlorophyl a (mg/m3)
19
Suspended solids (MES) mg/l
20
RESULTS Optional measurements
July
Anions (Chloride, Sulphate,
August
Sept
21
October
November
22
RESULTS
Data actual Analysis in MELMARINA (Ghar El Melh
site)
MS1
MS2
23
MS3
MS4
24
MS5
MS6
25
THANK YOU FOR YOUR PATIENCE
Write a Comment
User Comments (0)
About PowerShow.com