WMATA and VDOT will be key participants in both the land use and transportation ... with grant funds received from the VDOT's Multimodal Planning Grant Program. ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 18
Provided by: mes77
Category:
Tags: church | east | falls | planning | study | vdot

less

Transcript and Presenter's Notes

Title: East Falls Church Planning Study


1
East Falls Church Planning Study
  • Presentation to the
  • Williamsburg Civic Association
  • by
  • Mark Moran
  • President, WCA
  • November 27, 2007

efcpsStatusToWca2007-11c.ppt
2
Acknowledgements
  • Richard Tucker, Staff Coordinator, Arlington Co.
  • Consultant team
  • Kimley-Horn and Associates, Inc.
  • Nelson/Nygaard
  • Louis Scully Gionet

3
References
  • East Falls Church Planning Study (EFCPS) web site
  • http//www.arlingtonva.us/Departments/CPHD/forums/
    columbia/current/CPHDForumsEastFallsChurch.aspx
  • Consultant web site (Kimley-Horn)
  • ftp//fallschurchplanning_at_www.kimley-horn.com/_se
    cure/East-Falls-Church

4
Purpose and scope
  • The purpose of the East Falls Church Planning
    Study (EFCPS) is to generate a vision for
    transit-oriented development in the East Falls
    Church area of Arlington County
  • There are two phases to this study
  • Land use vision development and
  • Transportation planning
  • The land-use vision should take the form of a
    concept plan with a policy framework that focuses
    on targeted sites, including the East Falls
    Church Metro parking lot and other sites that are
    likely to redevelop.
  • The process could result in changes to the
    General Land Use Plan (GLUP) and/or zoning changes

5
Conduct of the study
  • The land use visioning will be led by planners
    from both Arlington County and the City of Falls
    Church.
  • The staff team will be guided by a citizen Task
    Force comprised of representatives from both
    jurisdictions.
  • Representatives from the Virginia Department of
    Transportation (VDOT) and the Washington
    Metropolitan Area Transit Authority (WMATA) will
    also participate
  • WMATA and VDOT will be key participants in both
    the land use and transportation analyses, since
    they are major landowners who control important
    pieces of the transportation infrastructure,
    including the Metrorail station, the parking
    lots, Interstate 66, and several state-owned
    arterial roadways.

6
Land use visioning
  • The goal of the visioning exercise is to develop
    a concept plan that will set height, density, use
    mix, and urban design standards for areas in the
    Arlington Co. portion of the study area,
    particularly in areas likely to redevelop (e.g.,
    the Metro parking lot)
  • The City of Falls Church 2005 Comprehensive Plan
    will be used as the guide for the sites within
    the City of Falls Church.

7
Transportation planning analysis
  • After a preliminary land use plan has been
    developed for the identified sites within the
    East Falls Church area, the two jurisdictions
    will use a transportation consultant to analyze
    issues related to the transportation
    infrastructure
  • The transportation analysis will
  • Analyze access to the Metro station pedestrian,
    bicycle, and vehicular
  • Analyze station capacity and recommend
    infrastructure, streetscape and other public
    improvements to create an urban, walkable, and
    accessible mixed-use environment within this
    area.
  • The transportation portion of the study will be
    completed with grant funds received from the
    VDOTs Multimodal Planning Grant Program.

8
Final product
  • A final Concept Plan and Policy Framework will be
    developed and presented to the Arlington County
    Board and City of Falls Church City Council for
    adoption upon completion of the project
  • Should take about 12 to 18 months (Sept. 2007 to
    fall 2008 or spring 2009)

9
EFC Planning Study Task Force(17 members)
  • Arlington East Falls Church Civic Association(4
    members, including Committee Chairman)
  • Madison Manor Civic Association (1 member)
  • Williamsburg Civic Association (1 member)
  • Planning Commission (1 member)
  • Transportation Commission (1 member)
  • Washington Metropolitan Area Transit Authority
    WMATA(1 member)
  • Virginia Department of Transportation VDOT (1
    member)
  • At-large Arlington Community Representatives (up
    to 5 members)
  • City of Falls Church (2 members)
  • In addition, one County Board member will be
    selected as a liaison to the planning process

10
EFC Planning Study Task Force
  • Arlington Co. Board appointees
  • Arlington East Falls Church Civic Association
  • Mike Nardolilli, Task Force Chair
  • John Wilson
  • Alan Parker
  • Tim Reese (Barbara DePauw alternate)
  • Madison Manor Civic Association
  • Varun Nikore
  • Williamsburg Civic Association
  • Mark Moran
  • Planning Commission
  • Lisa Chavez
  • Transportation Commission
  • Franz Gimmler
  • At-large Arlington Representatives
  • Bob Dunphy
  • John Kinney
  • Nancy Iacomini
  • Anthony (Tony) Jones (Economic Development
    Commission)
  • Thanna Schemmel (Pedestrian Advisory Committee)
  • City of Falls Church Appointees
  • Suzanne Fauber (Planning Commission)
  • Don Rea (Gresham Place HOA President)
  • Other
  • Washington Metropolitan Area Transit Authority
    WMATA
  • Scott Peterson
  • Virginia Department of Transportation VDOT
  • Valerie Pardo

11
Charge of the Task Force
  1. Help to identify issues and sites to be addressed
    in the study
  2. Review transportation impacts and alternatives.
    Review recommendations regarding transportation
    improvements.
  3. Give input on conceptual plans and alternatives
    developed by staff for redevelopment of the East
    Falls Church Metro Station area and certain other
    key properties within close proximity to the
    Metro station.
  4. Assist staff in developing recommendations to the
    County Board on the Final Concept Plan and Policy
    Framework.

12
Study area
13
Timeline, 1 of 2
  • September 2007
  • Kick-off meeting Wednesday, September 26th at
    700 pm at Fire Station 6
  • Discuss study scope, schedule for Task Force and
    public participation
  • October 2007 February 2008
  • Nov Walking tour of study area
  • Review recommendations from previous studies and
    documents, such as the Virginia Tech East Falls
    Church Metro Area Plan (2004), the WMATA East
    Falls Church Station Access Study (2002), and the
    AEFCCA Metro Survey (2005). 
  • Review draft concepts and alternatives.
  • Discuss scope of transportation analysis with
    staff.
  • Refine concepts based on Task Force comments and
    feedback.
  • Discuss urban design, streetscape, pedestrian and
    bicycle improvements.
  •  February/March 2008
  • Assist with providing updates to and soliciting
    feedback from affected civic associations,
    Advisory Boards, and interested citizens.
  • Hold community-wide forum(s)
  • Provide interim concepts for review

14
Timeline, 2 of 2
  • March July 2008
  • Review results of transportation analysis and
    recommend revisions to preliminary redevelopment
    concepts and alternatives.
  • Provide input on final urban design
    recommendations for the general area.
  • Work with staff to develop an implementation
    strategy for achieving the vision.
  • September 2008
  • Staff works with Task Force with staff to develop
    final recommendations for County Board review and
    approval.
  • Staff works with Task Force to prepare
    presentations for Planning and Transportation
    Commissions. 
  • October 2008 December 2008
  • Seek final comments from civic associations,
    Advisory Boards, and interested citizens.
  • Staff works with Task Force to prepare
    presentations for Planning and Transportation
    Commissions. 
  • County Board review and adoption.

15
Meetings
  • We have had three meetings to date
  • Wed., Sept. 26 at 700 PM at Fire Station 6
    (Kickoff meeting)
  • Wed., Oct. 24 at 700 PM at Fire Station 6
  • Sat., Nov. 3 walking tour of area (830 AM to
    noon)
  • Next meeting
  • Wed., Dec. 12 at 700 PM at Fire Station 6
  • 6950 Little Falls Road, 22207. Main entrance is
    actually on Lee Hwy/Washington St. at Gresham
    Place.
  • Public is invited to attend any meetings

16
Interaction between WCA and Task Force
  • I will give status reports as the study moves
    forward, potentially at each WCA general
    membership meeting
  • I welcome input from WCA membership
  • My preferred way to get input is via e-mail
    (pres_at_wca-arlington.org)
  • I will transmit WCA input to the EFC Planning
    Study Task Force
  • Other ways to stay informed
  • Attend EFC TF meetings (anyone is allowed to
    attend)
  • Visit the EFC Planning Study web site
    (http//www.arlingtonva.us/Departments/CPHD/forums