Title: PRODML SIG
1PRODML SIG
- Team and General SIG MeetingsOctober 13-14,
2009Schlumberger SIS Offices, Houston
2General SIG Status
3SIG Team Structure
- Steering Committee
- Operations Team
- Use Case and Marketing Team
- Co-Chairs Laurence Ormerod, (open)
- Specifications and Architecture Team
- Co-Chairs Bill King and Bill McKenzie
- Deployment Support Team
- Co-Chairs Duncan Ord, (open)
- Energistics
- Alan, Gary, Jana, and Robin from PDS
4Specifications Team
5PRODML Standards Release Schedule
Â
6PRODML Services V2.0
7PRODML Implementation Demos
- The next slide illustrates the Distributed
Temperature Survey demonstration. Other current
demonstrations are Shells automated well test
validation demo, Chevron/Moblizes integrated
demo of WITSML and PRODML Standards, and
Pioneers asset team production monitoring
interface demo.
8Shell 2009 V2.0 Services, Proof of Concept
Distributed Temperature Reconciliation
Workflow automation (above) Orchestration
(right) Sequence diagram (left)
9Gas Lift Design
- Representative Workflow
- Laurence Ormerod, Weatherford
10Gas Lift Design Process Outline
GL Design uses installed mandrel depths, spec.
valves GL Co may specify
Valves Installed by slickline. Well operating
Installation, with Blank GL mandrels Depth as
installed Completion Co.
Completion Design tubulars and GL valve depths
variables GL Co may advise
Drill well Results inform completion design
Valve Design
?
Known
v
?